Account Navigation

Account Navigation

Currency - All prices are in AUD

Currency - All prices are in AUD
 Loading... Please wait...
The Art of Service Standard Requirements Self Assessments

551st Electronic Systems Wing Toolkit: best-practice templates, step-by-step work plans and maturity diagnostics

$249.00

551st Electronic Systems Wing Toolkit: best-practice templates, step-by-step work plans and maturity diagnostics

$249.00

Availability:
Downloadable Resources, Instant Access

Product Description

Save time, empower your teams and effectively upgrade your processes with access to this practical 551st Electronic Systems Wing Toolkit and guide. Address common challenges with best-practice templates, step-by-step work plans and maturity diagnostics for any 551st Electronic Systems Wing related project.

Download the Toolkit and in Three Steps you will be guided from idea to implementation results.

The Toolkit contains the following practical and powerful enablers with new and updated 551st Electronic Systems Wing specific requirements:


STEP 1: Get your bearings

Start with...

  • The latest quick edition of the 551st Electronic Systems Wing Self Assessment book in PDF containing 49 requirements to perform a quickscan, get an overview and share with stakeholders.

Organized in a data driven improvement cycle RDMAICS (Recognize, Define, Measure, Analyze, Improve, Control and Sustain), check the…

  • Example pre-filled Self-Assessment Excel Dashboard to get familiar with results generation

Then find your goals...


STEP 2: Set concrete goals, tasks, dates and numbers you can track

Featuring 674 new and updated case-based questions, organized into seven core areas of process design, this Self-Assessment will help you identify areas in which 551st Electronic Systems Wing improvements can be made.

Examples; 10 of the 674 standard requirements:

  1. Is the scope of 551st Electronic Systems Wing defined?

  2. Has the improvement team collected the voice of the customer (obtained feedback; qualitative and quantitative)?

  3. How to measure lifecycle phases?

  4. Were lessons learned captured and communicated?

  5. Is there a limit on the number of users in 551st Electronic Systems Wing ?

  6. Are we relevant? Will we be relevant five years from now? Ten?

  7. Which models, tools and techniques are necessary?

  8. Has the 551st Electronic Systems Wing work been fairly and/or equitably divided and delegated among team members who are qualified and capable to perform the work? Has everyone contributed?

  9. How would our PR, marketing, and social media change if we did not use outside agencies?

  10. To what extent does management recognize 551st Electronic Systems Wing as a tool to increase the results?


Complete the self assessment, on your own or with a team in a workshop setting. Use the workbook together with the self assessment requirements spreadsheet:

  • The workbook is the latest in-depth complete edition of the 551st Electronic Systems Wing book in PDF containing 674 requirements, which criteria correspond to the criteria in...

Your 551st Electronic Systems Wing self-assessment dashboard which gives you your dynamically prioritized projects-ready tool and shows your organization exactly what to do next:

  • The Self-Assessment Excel Dashboard; with the 551st Electronic Systems Wing Self-Assessment and Scorecard you will develop a clear picture of which 551st Electronic Systems Wing areas need attention, which requirements you should focus on and who will be responsible for them:

    • Shows your organization instant insight in areas for improvement: Auto generates reports, radar chart for maturity assessment, insights per process and participant and bespoke, ready to use, RACI Matrix
    • Gives you a professional Dashboard to guide and perform a thorough 551st Electronic Systems Wing Self-Assessment
    • Is secure: Ensures offline data protection of your Self-Assessment results
    • Dynamically prioritized projects-ready RACI Matrix shows your organization exactly what to do next:

 

STEP 3: Implement, Track, follow up and revise strategy

The outcomes of STEP 2, the self assessment, are the inputs for STEP 3; Start and manage 551st Electronic Systems Wing projects with the 62 implementation resources:

  • 62 step-by-step 551st Electronic Systems Wing Project Management Form Templates covering over 6000 551st Electronic Systems Wing project requirements and success criteria:

Examples; 10 of the check box criteria:

  1. Lessons Learned: What worked well or did not work well, either for this 551st Electronic Systems Wing project or for the 551st Electronic Systems Wing project team?

  2. Project Scope Statement: Have you been able to thoroughly document the 551st Electronic Systems Wing projects assumptions and constraints?

  3. Probability and Impact Assessment: Supply/demand 551st Electronic Systems Wing projections and trends; what are the levels of accuracy?

  4. Executing Process Group: What are the main types of goods and services being outsourced?

  5. Schedule Management Plan: Are changes in deliverable commitments agreed to by all affected groups & individuals?

  6. Cost Management Plan: Have 551st Electronic Systems Wing project management standards and procedures been identified / established and documented?

  7. Project Scope Statement: Will the Risk Plan be updated on a regular and frequent basis?

  8. Risk Audit: What are the benefits of a Enterprise wide approach to Risk Management?

  9. Risk Register: What further options might be available for responding to the risk?

  10. Project Performance Report: To what degree are sub-teams possible or necessary?

 
Step-by-step and complete 551st Electronic Systems Wing Project Management Forms and Templates including check box criteria and templates.

1.0 Initiating Process Group:

  • 1.1 551st Electronic Systems Wing project Charter
  • 1.2 Stakeholder Register
  • 1.3 Stakeholder Analysis Matrix


2.0 Planning Process Group:

  • 2.1 551st Electronic Systems Wing project Management Plan
  • 2.2 Scope Management Plan
  • 2.3 Requirements Management Plan
  • 2.4 Requirements Documentation
  • 2.5 Requirements Traceability Matrix
  • 2.6 551st Electronic Systems Wing project Scope Statement
  • 2.7 Assumption and Constraint Log
  • 2.8 Work Breakdown Structure
  • 2.9 WBS Dictionary
  • 2.10 Schedule Management Plan
  • 2.11 Activity List
  • 2.12 Activity Attributes
  • 2.13 Milestone List
  • 2.14 Network Diagram
  • 2.15 Activity Resource Requirements
  • 2.16 Resource Breakdown Structure
  • 2.17 Activity Duration Estimates
  • 2.18 Duration Estimating Worksheet
  • 2.19 551st Electronic Systems Wing project Schedule
  • 2.20 Cost Management Plan
  • 2.21 Activity Cost Estimates
  • 2.22 Cost Estimating Worksheet
  • 2.23 Cost Baseline
  • 2.24 Quality Management Plan
  • 2.25 Quality Metrics
  • 2.26 Process Improvement Plan
  • 2.27 Responsibility Assignment Matrix
  • 2.28 Roles and Responsibilities
  • 2.29 Human Resource Management Plan
  • 2.30 Communications Management Plan
  • 2.31 Risk Management Plan
  • 2.32 Risk Register
  • 2.33 Probability and Impact Assessment
  • 2.34 Probability and Impact Matrix
  • 2.35 Risk Data Sheet
  • 2.36 Procurement Management Plan
  • 2.37 Source Selection Criteria
  • 2.38 Stakeholder Management Plan
  • 2.39 Change Management Plan


3.0 Executing Process Group:

  • 3.1 Team Member Status Report
  • 3.2 Change Request
  • 3.3 Change Log
  • 3.4 Decision Log
  • 3.5 Quality Audit
  • 3.6 Team Directory
  • 3.7 Team Operating Agreement
  • 3.8 Team Performance Assessment
  • 3.9 Team Member Performance Assessment
  • 3.10 Issue Log


4.0 Monitoring and Controlling Process Group:

  • 4.1 551st Electronic Systems Wing project Performance Report
  • 4.2 Variance Analysis
  • 4.3 Earned Value Status
  • 4.4 Risk Audit
  • 4.5 Contractor Status Report
  • 4.6 Formal Acceptance


5.0 Closing Process Group:

  • 5.1 Procurement Audit
  • 5.2 Contract Close-Out
  • 5.3 551st Electronic Systems Wing project or Phase Close-Out
  • 5.4 Lessons Learned

 

Results

With this Three Step process you will have all the tools you need for any 551st Electronic Systems Wing project with this in-depth 551st Electronic Systems Wing Toolkit.

In using the Toolkit you will be better able to:

  • Diagnose 551st Electronic Systems Wing projects, initiatives, organizations, businesses and processes using accepted diagnostic standards and practices
  • Implement evidence-based best practice strategies aligned with overall goals
  • Integrate recent advances in 551st Electronic Systems Wing and put process design strategies into practice according to best practice guidelines

Defining, designing, creating, and implementing a process to solve a business challenge or meet a business objective is the most valuable role; In EVERY company, organization and department.

Unless you are talking a one-time, single-use project within a business, there should be a process. Whether that process is managed and implemented by humans, AI, or a combination of the two, it needs to be designed by someone with a complex enough perspective to ask the right questions. Someone capable of asking the right questions and step back and say, 'What are we really trying to accomplish here? And is there a different way to look at it?'

This Toolkit empowers people to do just that - whether their title is entrepreneur, manager, consultant, (Vice-)President, CxO etc... - they are the people who rule the future. They are the person who asks the right questions to make 551st Electronic Systems Wing investments work better.

This 551st Electronic Systems Wing All-Inclusive Toolkit enables You to be that person.

 

Includes lifetime updates

Every self assessment comes with Lifetime Updates and Lifetime Free Updated Books. Lifetime Updates is an industry-first feature which allows you to receive verified self assessment updates, ensuring you always have the most accurate information at your fingertips.

Product Reviews

Find Similar Products by Category