Broadband networks Toolkit: best-practice templates, step-by-step work plans and maturity diagnostics

$249.00
(46 reviews) Write a Review
Availability:
Downloadable Resources, Instant Access

Save time, empower your teams and effectively upgrade your processes with access to this practical Broadband networks Toolkit and guide. Address common challenges with best-practice templates, step-by-step work plans and maturity diagnostics for any Broadband networks related project.

Download the Toolkit and in Three Steps you will be guided from idea to implementation results.

The Toolkit contains the following practical and powerful enablers with new and updated Broadband networks specific requirements:


STEP 1: Get your bearings

Start with...

  • The latest quick edition of the Broadband networks Self Assessment book in PDF containing 49 requirements to perform a quickscan, get an overview and share with stakeholders.

Organized in a data driven improvement cycle RDMAICS (Recognize, Define, Measure, Analyze, Improve, Control and Sustain), check the…

  • Example pre-filled Self-Assessment Excel Dashboard to get familiar with results generation

Then find your goals...


STEP 2: Set concrete goals, tasks, dates and numbers you can track

Featuring 704 new and updated case-based questions, organized into seven core areas of process design, this Self-Assessment will help you identify areas in which Broadband networks improvements can be made.

Examples; 10 of the 704 standard requirements:

  1. Do you keep 50% of your time unscheduled?

  2. Ask yourself: how would we do this work if we only had one staff member to do it?

  3. Explorations of the frontiers of Broadband networks will help you build influence, improve Broadband networks, optimize decision making, and sustain change

  4. Have all non-recommended alternatives been analyzed in sufficient detail?

  5. What are your key Broadband networks organizational performance measures, including key short and longer-term financial measures?

  6. Are stakeholder processes mapped?

  7. Was a pilot designed for the proposed solution(s)?

  8. What potential environmental factors impact the Broadband networks effort?

  9. How do you measure progress and evaluate training effectiveness?

  10. Are audit criteria, scope, frequency and methods defined?


Complete the self assessment, on your own or with a team in a workshop setting. Use the workbook together with the self assessment requirements spreadsheet:

  • The workbook is the latest in-depth complete edition of the Broadband networks book in PDF containing 704 requirements, which criteria correspond to the criteria in...

Your Broadband networks self-assessment dashboard which gives you your dynamically prioritized projects-ready tool and shows your organization exactly what to do next:

  • The Self-Assessment Excel Dashboard; with the Broadband networks Self-Assessment and Scorecard you will develop a clear picture of which Broadband networks areas need attention, which requirements you should focus on and who will be responsible for them:

    • Shows your organization instant insight in areas for improvement: Auto generates reports, radar chart for maturity assessment, insights per process and participant and bespoke, ready to use, RACI Matrix
    • Gives you a professional Dashboard to guide and perform a thorough Broadband networks Self-Assessment
    • Is secure: Ensures offline data protection of your Self-Assessment results
    • Dynamically prioritized projects-ready RACI Matrix shows your organization exactly what to do next:

 

STEP 3: Implement, Track, follow up and revise strategy

The outcomes of STEP 2, the self assessment, are the inputs for STEP 3; Start and manage Broadband networks projects with the 62 implementation resources:

  • 62 step-by-step Broadband networks Project Management Form Templates covering over 6000 Broadband networks project requirements and success criteria:

Examples; 10 of the check box criteria:

  1. Probability and Impact Assessment: Are there new risks that mitigation strategies might introduce?

  2. Probability and Impact Matrix: What will be the environmental impact of the Broadband networks project?

  3. Scope Management Plan: What are the risks that could significantly affect the communication on the Broadband networks project?

  4. Quality Management Plan: How does your organization establish and maintain customer relationships?

  5. Team Performance Assessment: To what degree does the team possess adequate membership to achieve its ends?

  6. Change Request: Has the change been highlighted and documented in the CSCI?

  7. Procurement Management Plan: Do you have the reasons why the changes to the organizational systems and capabilities are required?

  8. Change Management Plan: How will you deal with anger about the restricting of communications due to confidentiality considerations?

  9. Activity Duration Estimates: Are Broadband networks project records organized, maintained, and assessable by Broadband networks project team members?

  10. Formal Acceptance: How does your team plan to obtain formal acceptance on your Broadband networks project?

 
Step-by-step and complete Broadband networks Project Management Forms and Templates including check box criteria and templates.

1.0 Initiating Process Group:

  • 1.1 Broadband networks project Charter
  • 1.2 Stakeholder Register
  • 1.3 Stakeholder Analysis Matrix


2.0 Planning Process Group:

  • 2.1 Broadband networks project Management Plan
  • 2.2 Scope Management Plan
  • 2.3 Requirements Management Plan
  • 2.4 Requirements Documentation
  • 2.5 Requirements Traceability Matrix
  • 2.6 Broadband networks project Scope Statement
  • 2.7 Assumption and Constraint Log
  • 2.8 Work Breakdown Structure
  • 2.9 WBS Dictionary
  • 2.10 Schedule Management Plan
  • 2.11 Activity List
  • 2.12 Activity Attributes
  • 2.13 Milestone List
  • 2.14 Network Diagram
  • 2.15 Activity Resource Requirements
  • 2.16 Resource Breakdown Structure
  • 2.17 Activity Duration Estimates
  • 2.18 Duration Estimating Worksheet
  • 2.19 Broadband networks project Schedule
  • 2.20 Cost Management Plan
  • 2.21 Activity Cost Estimates
  • 2.22 Cost Estimating Worksheet
  • 2.23 Cost Baseline
  • 2.24 Quality Management Plan
  • 2.25 Quality Metrics
  • 2.26 Process Improvement Plan
  • 2.27 Responsibility Assignment Matrix
  • 2.28 Roles and Responsibilities
  • 2.29 Human Resource Management Plan
  • 2.30 Communications Management Plan
  • 2.31 Risk Management Plan
  • 2.32 Risk Register
  • 2.33 Probability and Impact Assessment
  • 2.34 Probability and Impact Matrix
  • 2.35 Risk Data Sheet
  • 2.36 Procurement Management Plan
  • 2.37 Source Selection Criteria
  • 2.38 Stakeholder Management Plan
  • 2.39 Change Management Plan


3.0 Executing Process Group:

  • 3.1 Team Member Status Report
  • 3.2 Change Request
  • 3.3 Change Log
  • 3.4 Decision Log
  • 3.5 Quality Audit
  • 3.6 Team Directory
  • 3.7 Team Operating Agreement
  • 3.8 Team Performance Assessment
  • 3.9 Team Member Performance Assessment
  • 3.10 Issue Log


4.0 Monitoring and Controlling Process Group:

  • 4.1 Broadband networks project Performance Report
  • 4.2 Variance Analysis
  • 4.3 Earned Value Status
  • 4.4 Risk Audit
  • 4.5 Contractor Status Report
  • 4.6 Formal Acceptance


5.0 Closing Process Group:

  • 5.1 Procurement Audit
  • 5.2 Contract Close-Out
  • 5.3 Broadband networks project or Phase Close-Out
  • 5.4 Lessons Learned

 

Results

With this Three Step process you will have all the tools you need for any Broadband networks project with this in-depth Broadband networks Toolkit.

In using the Toolkit you will be better able to:

  • Diagnose Broadband networks projects, initiatives, organizations, businesses and processes using accepted diagnostic standards and practices
  • Implement evidence-based best practice strategies aligned with overall goals
  • Integrate recent advances in Broadband networks and put process design strategies into practice according to best practice guidelines

Defining, designing, creating, and implementing a process to solve a business challenge or meet a business objective is the most valuable role; In EVERY company, organization and department.

Unless you are talking a one-time, single-use project within a business, there should be a process. Whether that process is managed and implemented by humans, AI, or a combination of the two, it needs to be designed by someone with a complex enough perspective to ask the right questions. Someone capable of asking the right questions and step back and say, 'What are we really trying to accomplish here? And is there a different way to look at it?'

This Toolkit empowers people to do just that - whether their title is entrepreneur, manager, consultant, (Vice-)President, CxO etc... - they are the people who rule the future. They are the person who asks the right questions to make Broadband networks investments work better.

This Broadband networks All-Inclusive Toolkit enables You to be that person.

 

Includes lifetime updates

Every self assessment comes with Lifetime Updates and Lifetime Free Updated Books. Lifetime Updates is an industry-first feature which allows you to receive verified self assessment updates, ensuring you always have the most accurate information at your fingertips.

46 Reviews Hide Reviews Show Reviews

  • 5
    The Honourable Ralph Goodale, Minister of Public Safety and Emergency Preparedness, Canada

    Posted by The Honourable Ralph Goodale, Minister of Public Safety and Emergency Preparedness, Canada on 4th Sep 2018

    I would like to extend my sincere appreciation. I would also like to thank you for your service in promoting business continuity practices. I wish you every success in your work.

  • 5
    Seems quite handy - going to start using it next month as we're investing quite a lot in it. This will define for us what to do in this space and solve a real problem (rather than chasing shiny objects).

    Posted by DAVIN B. on 3rd Sep 2018

    DAVIN B. Systems Manager

  • 5
    Thank you for the excel dashboard. It is so powerful.

    Posted by TAHAR H. on 2nd Sep 2018

    TAHAR H. Researcher at Institute of Economic Analysis and Prospective Studies

  • 5
    I have gone through the array of your works and they are simply awesome! Great job you have been doing.

    Posted by KENNETH O. on 2nd Sep 2018

    KENNETH O. MD/CEO, Emerging Media

  • 5
    Thank you for providing these valuable resources.

    Posted by HANS D. on 5th Aug 2018

    HANS D. Integration & Solution Architect

  • 5
    Man, thanks again for sharing. Really a life saver! Greetings!

    Posted by DAAN C on 4th Aug 2018

    DAAN C Senior Consultant

  • 5
    Thank you, these are great!

    Posted by NATALIE F. on 3rd Aug 2018

    NATALIE F. Healthcare Information Technology Consultant

  • 5
    Spot on, thank you. Will study your book to help my clients.

    Posted by WALTER H. on 2nd Aug 2018

    WALTER H. Business Coach

  • 5
    I have been looking at the document, and it is quite extensive.

    Posted by PENGILLY W. on 5th Jul 2018

    PENGILLY W. Director IT & Logistics at a leading University