Flat network Toolkit: best-practice templates, step-by-step work plans and maturity diagnostics

$249.00
(46 reviews) Write a Review
Availability:
Downloadable Resources, Instant Access

Save time, empower your teams and effectively upgrade your processes with access to this practical Flat network Toolkit and guide. Address common challenges with best-practice templates, step-by-step work plans and maturity diagnostics for any Flat network related project.

Download the Toolkit and in Three Steps you will be guided from idea to implementation results.

The Toolkit contains the following practical and powerful enablers with new and updated Flat network specific requirements:


STEP 1: Get your bearings

Start with...

  • The latest quick edition of the Flat network Self Assessment book in PDF containing 49 requirements to perform a quickscan, get an overview and share with stakeholders.

Organized in a data driven improvement cycle RDMAICS (Recognize, Define, Measure, Analyze, Improve, Control and Sustain), check the…

  • Example pre-filled Self-Assessment Excel Dashboard to get familiar with results generation

Then find your goals...


STEP 2: Set concrete goals, tasks, dates and numbers you can track

Featuring 657 new and updated case-based questions, organized into seven core areas of process design, this Self-Assessment will help you identify areas in which Flat network improvements can be made.

Examples; 10 of the 657 standard requirements:

  1. What are your current levels and trends in key measures or indicators of Flat network product and process performance that are important to and directly serve your customers? how do these results compare with the performance of your competitors and other organizations with similar offerings?

  2. Do the decisions we make today help people and the planet tomorrow?

  3. Is there a recommended audit plan for routine surveillance inspections of Flat networks gains?

  4. Are there any constraints (technical, political, cultural, or otherwise) that would inhibit certain solutions?

  5. Who is the main stakeholder, with ultimate responsibility for driving Flat network forward?

  6. Is the Flat network process severely broken such that a re-design is necessary?

  7. Why do measure/indicators matter?

  8. Is the team sponsored by a champion or stakeholder leader?

  9. What does the should be process map/design look like?

  10. How do we Improve Flat network service perception, and satisfaction?


Complete the self assessment, on your own or with a team in a workshop setting. Use the workbook together with the self assessment requirements spreadsheet:

  • The workbook is the latest in-depth complete edition of the Flat network book in PDF containing 657 requirements, which criteria correspond to the criteria in...

Your Flat network self-assessment dashboard which gives you your dynamically prioritized projects-ready tool and shows your organization exactly what to do next:

  • The Self-Assessment Excel Dashboard; with the Flat network Self-Assessment and Scorecard you will develop a clear picture of which Flat network areas need attention, which requirements you should focus on and who will be responsible for them:

    • Shows your organization instant insight in areas for improvement: Auto generates reports, radar chart for maturity assessment, insights per process and participant and bespoke, ready to use, RACI Matrix
    • Gives you a professional Dashboard to guide and perform a thorough Flat network Self-Assessment
    • Is secure: Ensures offline data protection of your Self-Assessment results
    • Dynamically prioritized projects-ready RACI Matrix shows your organization exactly what to do next:

 

STEP 3: Implement, Track, follow up and revise strategy

The outcomes of STEP 2, the self assessment, are the inputs for STEP 3; Start and manage Flat network projects with the 62 implementation resources:

  • 62 step-by-step Flat network Project Management Form Templates covering over 6000 Flat network project requirements and success criteria:

Examples; 10 of the check box criteria:

  1. Resource Breakdown Structure: What is the purpose of assigning and documenting responsibility?

  2. Lessons Learned: How well prepared were you to receive Flat network project deliverables?

  3. Probability and Impact Assessment: Which of such risk factors can be avoided altogether?

  4. Project Performance Report: To what degree can the team measure progress against specific goals?

  5. Project Management Plan: What if, for example, the positive direction and vision of the organization causes expected trends to change resulting in greater need than expected?

  6. Probability and Impact Assessment: Management -what contingency plans do you have if the risk becomes a reality?

  7. Cost Management Plan: Are the people assigned to the Flat network project sufficiently qualified?

  8. Stakeholder Management Plan: Is the current scope of the Flat network project substantially different than that originally defined?

  9. Scope Management Plan: Are all key components of a Quality Assurance Plan present?

  10. Duration Estimating Worksheet: How should ongoing costs be monitored to try to keep the Flat network project within budget?

 
Step-by-step and complete Flat network Project Management Forms and Templates including check box criteria and templates.

1.0 Initiating Process Group:

  • 1.1 Flat network project Charter
  • 1.2 Stakeholder Register
  • 1.3 Stakeholder Analysis Matrix


2.0 Planning Process Group:

  • 2.1 Flat network project Management Plan
  • 2.2 Scope Management Plan
  • 2.3 Requirements Management Plan
  • 2.4 Requirements Documentation
  • 2.5 Requirements Traceability Matrix
  • 2.6 Flat network project Scope Statement
  • 2.7 Assumption and Constraint Log
  • 2.8 Work Breakdown Structure
  • 2.9 WBS Dictionary
  • 2.10 Schedule Management Plan
  • 2.11 Activity List
  • 2.12 Activity Attributes
  • 2.13 Milestone List
  • 2.14 Network Diagram
  • 2.15 Activity Resource Requirements
  • 2.16 Resource Breakdown Structure
  • 2.17 Activity Duration Estimates
  • 2.18 Duration Estimating Worksheet
  • 2.19 Flat network project Schedule
  • 2.20 Cost Management Plan
  • 2.21 Activity Cost Estimates
  • 2.22 Cost Estimating Worksheet
  • 2.23 Cost Baseline
  • 2.24 Quality Management Plan
  • 2.25 Quality Metrics
  • 2.26 Process Improvement Plan
  • 2.27 Responsibility Assignment Matrix
  • 2.28 Roles and Responsibilities
  • 2.29 Human Resource Management Plan
  • 2.30 Communications Management Plan
  • 2.31 Risk Management Plan
  • 2.32 Risk Register
  • 2.33 Probability and Impact Assessment
  • 2.34 Probability and Impact Matrix
  • 2.35 Risk Data Sheet
  • 2.36 Procurement Management Plan
  • 2.37 Source Selection Criteria
  • 2.38 Stakeholder Management Plan
  • 2.39 Change Management Plan


3.0 Executing Process Group:

  • 3.1 Team Member Status Report
  • 3.2 Change Request
  • 3.3 Change Log
  • 3.4 Decision Log
  • 3.5 Quality Audit
  • 3.6 Team Directory
  • 3.7 Team Operating Agreement
  • 3.8 Team Performance Assessment
  • 3.9 Team Member Performance Assessment
  • 3.10 Issue Log


4.0 Monitoring and Controlling Process Group:

  • 4.1 Flat network project Performance Report
  • 4.2 Variance Analysis
  • 4.3 Earned Value Status
  • 4.4 Risk Audit
  • 4.5 Contractor Status Report
  • 4.6 Formal Acceptance


5.0 Closing Process Group:

  • 5.1 Procurement Audit
  • 5.2 Contract Close-Out
  • 5.3 Flat network project or Phase Close-Out
  • 5.4 Lessons Learned

 

Results

With this Three Step process you will have all the tools you need for any Flat network project with this in-depth Flat network Toolkit.

In using the Toolkit you will be better able to:

  • Diagnose Flat network projects, initiatives, organizations, businesses and processes using accepted diagnostic standards and practices
  • Implement evidence-based best practice strategies aligned with overall goals
  • Integrate recent advances in Flat network and put process design strategies into practice according to best practice guidelines

Defining, designing, creating, and implementing a process to solve a business challenge or meet a business objective is the most valuable role; In EVERY company, organization and department.

Unless you are talking a one-time, single-use project within a business, there should be a process. Whether that process is managed and implemented by humans, AI, or a combination of the two, it needs to be designed by someone with a complex enough perspective to ask the right questions. Someone capable of asking the right questions and step back and say, 'What are we really trying to accomplish here? And is there a different way to look at it?'

This Toolkit empowers people to do just that - whether their title is entrepreneur, manager, consultant, (Vice-)President, CxO etc... - they are the people who rule the future. They are the person who asks the right questions to make Flat network investments work better.

This Flat network All-Inclusive Toolkit enables You to be that person.

 

Includes lifetime updates

Every self assessment comes with Lifetime Updates and Lifetime Free Updated Books. Lifetime Updates is an industry-first feature which allows you to receive verified self assessment updates, ensuring you always have the most accurate information at your fingertips.

46 Reviews Hide Reviews Show Reviews

  • 5
    I will use everything extensively to prepare for an audit scheduled in Dec and Jan for an important automotive customer.

    Posted by Bruno C. on 5th Sep 2018

    Bruno C. ICT Director

  • 5
    Seems quite handy - going to start using it next month as we're investing quite a lot in it. This will define for us what to do in this space and solve a real problem (rather than chasing shiny objects).

    Posted by DAVIN B. on 4th Sep 2018

    DAVIN B. Systems Manager

  • 5
    The Honourable Ralph Goodale, Minister of Public Safety and Emergency Preparedness, Canada

    Posted by The Honourable Ralph Goodale, Minister of Public Safety and Emergency Preparedness, Canada on 4th Sep 2018

    I would like to extend my sincere appreciation. I would also like to thank you for your service in promoting business continuity practices. I wish you every success in your work.

  • 5
    Thank you, this is perfect - I will certainly be recommending Self Assessment dashboards to all - I can not wait to tell my colleagues on Monday.

    Posted by MEL F. on 3rd Sep 2018

    MEL F. Change Management Professional

  • 5
    Spot on, thank you. Will study your book to help my clients.

    Posted by WALTER H. on 3rd Sep 2018

    WALTER H. Business Coach

  • 5
    Man, thanks again for sharing. Really a life saver! Greetings!

    Posted by DAAN C on 2nd Sep 2018

    DAAN C Senior Consultant

  • 5
    I look forward to becoming more familiar with the material and conducting the survey with my employer. So far it looks very comprehensive. Thank you.

    Posted by RON F. on 2nd Sep 2018

    RON F. Director Analytics Governance

  • 5
    Congrats! Very cool!

    Posted by Caryn B. on 2nd Sep 2018

    Caryn B. Vice President Production

  • 5
    Thank you. We will be offering your self assessment as a subject for our master students from autumn onwards.

    Posted by Christine R. on 5th Aug 2018

    Christine R. University Officer