Global Area Reference System Toolkit: best-practice templates, step-by-step work plans and maturity diagnostics

$249.00
(46 reviews) Write a Review
Availability:
Downloadable Resources, Instant Access

Save time, empower your teams and effectively upgrade your processes with access to this practical Global Area Reference System Toolkit and guide. Address common challenges with best-practice templates, step-by-step work plans and maturity diagnostics for any Global Area Reference System related project.

Download the Toolkit and in Three Steps you will be guided from idea to implementation results.

The Toolkit contains the following practical and powerful enablers with new and updated Global Area Reference System specific requirements:


STEP 1: Get your bearings

Start with...

  • The latest quick edition of the Global Area Reference System Self Assessment book in PDF containing 49 requirements to perform a quickscan, get an overview and share with stakeholders.

Organized in a data driven improvement cycle RDMAICS (Recognize, Define, Measure, Analyze, Improve, Control and Sustain), check the…

  • Example pre-filled Self-Assessment Excel Dashboard to get familiar with results generation

Then find your goals...


STEP 2: Set concrete goals, tasks, dates and numbers you can track

Featuring 654 new and updated case-based questions, organized into seven core areas of process design, this Self-Assessment will help you identify areas in which Global Area Reference System improvements can be made.

Examples; 10 of the 654 standard requirements:

  1. Operational - will it work?

  2. Are pertinent alerts monitored, analyzed and distributed to appropriate personnel?

  3. Is a Global Area Reference System Team Work effort in place?

  4. Think about the kind of project structure that would be appropriate for your Global Area Reference System project. should it be formal and complex, or can it be less formal and relatively simple?

  5. Are we using Global Area Reference System to communicate information about our Cybersecurity Risk Management programs including the effectiveness of those programs to stakeholders, including boards, investors, auditors, and insurers?

  6. How does the Global Area Reference System manager ensure against scope creep?

  7. What tools were used to generate the list of possible causes?

  8. Is data and process analysis, root cause analysis and quantifying the gap/opportunity in place?

  9. Can we do Global Area Reference System without complex (expensive) analysis?

  10. Why is change control necessary?


Complete the self assessment, on your own or with a team in a workshop setting. Use the workbook together with the self assessment requirements spreadsheet:

  • The workbook is the latest in-depth complete edition of the Global Area Reference System book in PDF containing 654 requirements, which criteria correspond to the criteria in...

Your Global Area Reference System self-assessment dashboard which gives you your dynamically prioritized projects-ready tool and shows your organization exactly what to do next:

  • The Self-Assessment Excel Dashboard; with the Global Area Reference System Self-Assessment and Scorecard you will develop a clear picture of which Global Area Reference System areas need attention, which requirements you should focus on and who will be responsible for them:

    • Shows your organization instant insight in areas for improvement: Auto generates reports, radar chart for maturity assessment, insights per process and participant and bespoke, ready to use, RACI Matrix
    • Gives you a professional Dashboard to guide and perform a thorough Global Area Reference System Self-Assessment
    • Is secure: Ensures offline data protection of your Self-Assessment results
    • Dynamically prioritized projects-ready RACI Matrix shows your organization exactly what to do next:

 

STEP 3: Implement, Track, follow up and revise strategy

The outcomes of STEP 2, the self assessment, are the inputs for STEP 3; Start and manage Global Area Reference System projects with the 62 implementation resources:

  • 62 step-by-step Global Area Reference System Project Management Form Templates covering over 6000 Global Area Reference System project requirements and success criteria:

Examples; 10 of the check box criteria:

  1. Stakeholder Management Plan: What is the primary function of the Activity Decomposition Decision Tree?

  2. Probability and Impact Assessment: My Global Area Reference System project leader has suddenly left the company, what do I do?

  3. Probability and Impact Matrix: Is the Global Area Reference System project cutting across the entire organization?

  4. Risk Audit: Is there (or should there be) some impact on the process of setting materiality when the auditor more effectively identifies higher risk areas of the financial statements?

  5. Assumption and Constraint Log: Are best practices and metrics employed to identify issues, progress, performance, etc.?

  6. Activity Duration Estimates: Are Global Area Reference System project management tools and techniques consistently applied throughout all Global Area Reference System projects?

  7. Stakeholder Analysis Matrix: Who has not been involved up to now but should have been?

  8. Stakeholder Analysis Matrix: How to measure the achievement of the Immediate Objective?

  9. Scope Management Plan: Are you meeting with stake holders and team members?

  10. Project Scope Statement: What are the possible consequences should a risk come to occur?

 
Step-by-step and complete Global Area Reference System Project Management Forms and Templates including check box criteria and templates.

1.0 Initiating Process Group:

  • 1.1 Global Area Reference System project Charter
  • 1.2 Stakeholder Register
  • 1.3 Stakeholder Analysis Matrix


2.0 Planning Process Group:

  • 2.1 Global Area Reference System project Management Plan
  • 2.2 Scope Management Plan
  • 2.3 Requirements Management Plan
  • 2.4 Requirements Documentation
  • 2.5 Requirements Traceability Matrix
  • 2.6 Global Area Reference System project Scope Statement
  • 2.7 Assumption and Constraint Log
  • 2.8 Work Breakdown Structure
  • 2.9 WBS Dictionary
  • 2.10 Schedule Management Plan
  • 2.11 Activity List
  • 2.12 Activity Attributes
  • 2.13 Milestone List
  • 2.14 Network Diagram
  • 2.15 Activity Resource Requirements
  • 2.16 Resource Breakdown Structure
  • 2.17 Activity Duration Estimates
  • 2.18 Duration Estimating Worksheet
  • 2.19 Global Area Reference System project Schedule
  • 2.20 Cost Management Plan
  • 2.21 Activity Cost Estimates
  • 2.22 Cost Estimating Worksheet
  • 2.23 Cost Baseline
  • 2.24 Quality Management Plan
  • 2.25 Quality Metrics
  • 2.26 Process Improvement Plan
  • 2.27 Responsibility Assignment Matrix
  • 2.28 Roles and Responsibilities
  • 2.29 Human Resource Management Plan
  • 2.30 Communications Management Plan
  • 2.31 Risk Management Plan
  • 2.32 Risk Register
  • 2.33 Probability and Impact Assessment
  • 2.34 Probability and Impact Matrix
  • 2.35 Risk Data Sheet
  • 2.36 Procurement Management Plan
  • 2.37 Source Selection Criteria
  • 2.38 Stakeholder Management Plan
  • 2.39 Change Management Plan


3.0 Executing Process Group:

  • 3.1 Team Member Status Report
  • 3.2 Change Request
  • 3.3 Change Log
  • 3.4 Decision Log
  • 3.5 Quality Audit
  • 3.6 Team Directory
  • 3.7 Team Operating Agreement
  • 3.8 Team Performance Assessment
  • 3.9 Team Member Performance Assessment
  • 3.10 Issue Log


4.0 Monitoring and Controlling Process Group:

  • 4.1 Global Area Reference System project Performance Report
  • 4.2 Variance Analysis
  • 4.3 Earned Value Status
  • 4.4 Risk Audit
  • 4.5 Contractor Status Report
  • 4.6 Formal Acceptance


5.0 Closing Process Group:

  • 5.1 Procurement Audit
  • 5.2 Contract Close-Out
  • 5.3 Global Area Reference System project or Phase Close-Out
  • 5.4 Lessons Learned

 

Results

With this Three Step process you will have all the tools you need for any Global Area Reference System project with this in-depth Global Area Reference System Toolkit.

In using the Toolkit you will be better able to:

  • Diagnose Global Area Reference System projects, initiatives, organizations, businesses and processes using accepted diagnostic standards and practices
  • Implement evidence-based best practice strategies aligned with overall goals
  • Integrate recent advances in Global Area Reference System and put process design strategies into practice according to best practice guidelines

Defining, designing, creating, and implementing a process to solve a business challenge or meet a business objective is the most valuable role; In EVERY company, organization and department.

Unless you are talking a one-time, single-use project within a business, there should be a process. Whether that process is managed and implemented by humans, AI, or a combination of the two, it needs to be designed by someone with a complex enough perspective to ask the right questions. Someone capable of asking the right questions and step back and say, 'What are we really trying to accomplish here? And is there a different way to look at it?'

This Toolkit empowers people to do just that - whether their title is entrepreneur, manager, consultant, (Vice-)President, CxO etc... - they are the people who rule the future. They are the person who asks the right questions to make Global Area Reference System investments work better.

This Global Area Reference System All-Inclusive Toolkit enables You to be that person.

 

Includes lifetime updates

Every self assessment comes with Lifetime Updates and Lifetime Free Updated Books. Lifetime Updates is an industry-first feature which allows you to receive verified self assessment updates, ensuring you always have the most accurate information at your fingertips.

46 Reviews Hide Reviews Show Reviews

  • 5
    Thank you. I would very much like to read your publication and share my views on our blog to reach our English and Spanish customers.

    Posted by James S. on 6th Sep 2018

    James S. Account Manager

  • 5
    Great initiative and timing to release the requirements! And thanks a lot for sharing it with us!

    Posted by Pierre V. on 5th Sep 2018

    Pierre V. B2B Product & Content Marketing

  • 5
    BRENDAN M. Principle Consultant

    Posted by BRENDAN M. on 4th Sep 2018

    Every high achiever has probably been criticized as a 'control freak' at some point. However, given the numerous daily distractions entrepreneurs encounter, if you want to do 'deep work' with broad-ranging impact, you have to control your time to make each day a masterpiece. Check Out The Art of Service's Self Assessments.

  • 5
    I have gone through the array of your works and they are simply awesome! Great job you have been doing.

    Posted by KENNETH O. on 2nd Sep 2018

    KENNETH O. MD/CEO, Emerging Media

  • 5
    Just looked at the files. Impressive. Well done. I am learning.

    Posted by MARTIN B. on 2nd Sep 2018

    MARTIN B. Risks and Compliance, Vulnerability and Security Testing, Threat Detection and Response, Managed Security Services.

  • 5
    I look forward to becoming more familiar with the material and conducting the survey with my employer. So far it looks very comprehensive. Thank you.

    Posted by RON F. on 2nd Sep 2018

    RON F. Director Analytics Governance

  • 5
    cake.hr

    Posted by cake.hr on 6th Aug 2018

    The Verdict: The Complete Self-Assessment package ticks a lot of checkboxes, especially for businesses testing the waters for decision making and performance enhancement and for companies that can not have a full-time professional on payroll to guide the initial implementation of their drive.

  • 5
    This is great! Thank you. Say, do you all do consulting or certification?

    Posted by KEN W. on 6th Aug 2018

    KEN W. Managing Director

  • 5
    Thank you! I have found a lot of great information in the text so far. I plan to use your book as one of our references as we build out our SDDC and gladly leave an online review.

    Posted by CRAIG T. on 4th Aug 2018

    CRAIG T. Chief Technology Officer