Information industry Toolkit: best-practice templates, step-by-step work plans and maturity diagnostics

$249.00
(46 reviews) Write a Review
Availability:
Downloadable Resources, Instant Access

Save time, empower your teams and effectively upgrade your processes with access to this practical Information industry Toolkit and guide. Address common challenges with best-practice templates, step-by-step work plans and maturity diagnostics for any Information industry related project.

Download the Toolkit and in Three Steps you will be guided from idea to implementation results.

The Toolkit contains the following practical and powerful enablers with new and updated Information industry specific requirements:


STEP 1: Get your bearings

Start with...

  • The latest quick edition of the Information industry Self Assessment book in PDF containing 49 requirements to perform a quickscan, get an overview and share with stakeholders.

Organized in a data driven improvement cycle RDMAICS (Recognize, Define, Measure, Analyze, Improve, Control and Sustain), check the…

  • Example pre-filled Self-Assessment Excel Dashboard to get familiar with results generation

Then find your goals...


STEP 2: Set concrete goals, tasks, dates and numbers you can track

Featuring new and updated case-based questions, organized into seven core areas of process design, this Self-Assessment will help you identify areas in which Information industry improvements can be made.

Examples; 10 of the standard requirements:

  1. What can you control?

  2. What is a feasible sequencing of reform initiatives over time?

  3. What actually has to improve and by how much?

  4. Is data collected and displayed to better understand customer(s) critical needs and requirements.

  5. Is it economical; do we have the time and money?

  6. When is/was the Information industry start date?

  7. Can Information industry be learned?

  8. What are our Information industry Processes?

  9. What may be the consequences for the performance of an organization if all stakeholders are not consulted regarding Information industry?

  10. What would be the goal or target for a Information industrys improvement team?


Complete the self assessment, on your own or with a team in a workshop setting. Use the workbook together with the self assessment requirements spreadsheet:

  • The workbook is the latest in-depth complete edition of the Information industry book in PDF containing requirements, which criteria correspond to the criteria in...

Your Information industry self-assessment dashboard which gives you your dynamically prioritized projects-ready tool and shows your organization exactly what to do next:

  • The Self-Assessment Excel Dashboard; with the Information industry Self-Assessment and Scorecard you will develop a clear picture of which Information industry areas need attention, which requirements you should focus on and who will be responsible for them:

    • Shows your organization instant insight in areas for improvement: Auto generates reports, radar chart for maturity assessment, insights per process and participant and bespoke, ready to use, RACI Matrix
    • Gives you a professional Dashboard to guide and perform a thorough Information industry Self-Assessment
    • Is secure: Ensures offline data protection of your Self-Assessment results
    • Dynamically prioritized projects-ready RACI Matrix shows your organization exactly what to do next:

 

STEP 3: Implement, Track, follow up and revise strategy

The outcomes of STEP 2, the self assessment, are the inputs for STEP 3; Start and manage Information industry projects with the 62 implementation resources:

  • 62 step-by-step Information industry Project Management Form Templates covering over 6000 Information industry project requirements and success criteria:

Examples; 10 of the check box criteria:

  1. WBS Dictionary: Are internal budgets for authorized, but not priced changes based on the contractors resource plan for accomplishing the work?

  2. Team Directory: Have you decided when to celebrate the Information industry projects completion date?

  3. Probability and Impact Matrix: How would you suggest monitoring for risk transition indicators?

  4. Requirements Documentation: Has Requirements Gathering uncovered information that would necessitate changes?

  5. Quality Audit: How does the organization know that its systems for providing high quality consultancy services to external parties are appropriately effective and constructive?

  6. Process Improvement Plan: Have the frequency of collection and the points in the process where measurements will be made been determined?

  7. Initiating Process Group: Does the Information industry project team have enough people to execute the Information industry project plan?

  8. Activity Duration Estimates: Do checklists exist that list frequently performed activities?

  9. Procurement Audit: Is funding made available for payments under the contract at the appropriate time and in accordance with the relevant national/public financial procedures?

  10. Human Resource Management Plan: Is it standard practice to formally commit stakeholders to the Information industry project via agreements?

 
Step-by-step and complete Information industry Project Management Forms and Templates including check box criteria and templates.

1.0 Initiating Process Group:

  • 1.1 Information industry project Charter
  • 1.2 Stakeholder Register
  • 1.3 Stakeholder Analysis Matrix


2.0 Planning Process Group:

  • 2.1 Information industry project Management Plan
  • 2.2 Scope Management Plan
  • 2.3 Requirements Management Plan
  • 2.4 Requirements Documentation
  • 2.5 Requirements Traceability Matrix
  • 2.6 Information industry project Scope Statement
  • 2.7 Assumption and Constraint Log
  • 2.8 Work Breakdown Structure
  • 2.9 WBS Dictionary
  • 2.10 Schedule Management Plan
  • 2.11 Activity List
  • 2.12 Activity Attributes
  • 2.13 Milestone List
  • 2.14 Network Diagram
  • 2.15 Activity Resource Requirements
  • 2.16 Resource Breakdown Structure
  • 2.17 Activity Duration Estimates
  • 2.18 Duration Estimating Worksheet
  • 2.19 Information industry project Schedule
  • 2.20 Cost Management Plan
  • 2.21 Activity Cost Estimates
  • 2.22 Cost Estimating Worksheet
  • 2.23 Cost Baseline
  • 2.24 Quality Management Plan
  • 2.25 Quality Metrics
  • 2.26 Process Improvement Plan
  • 2.27 Responsibility Assignment Matrix
  • 2.28 Roles and Responsibilities
  • 2.29 Human Resource Management Plan
  • 2.30 Communications Management Plan
  • 2.31 Risk Management Plan
  • 2.32 Risk Register
  • 2.33 Probability and Impact Assessment
  • 2.34 Probability and Impact Matrix
  • 2.35 Risk Data Sheet
  • 2.36 Procurement Management Plan
  • 2.37 Source Selection Criteria
  • 2.38 Stakeholder Management Plan
  • 2.39 Change Management Plan


3.0 Executing Process Group:

  • 3.1 Team Member Status Report
  • 3.2 Change Request
  • 3.3 Change Log
  • 3.4 Decision Log
  • 3.5 Quality Audit
  • 3.6 Team Directory
  • 3.7 Team Operating Agreement
  • 3.8 Team Performance Assessment
  • 3.9 Team Member Performance Assessment
  • 3.10 Issue Log


4.0 Monitoring and Controlling Process Group:

  • 4.1 Information industry project Performance Report
  • 4.2 Variance Analysis
  • 4.3 Earned Value Status
  • 4.4 Risk Audit
  • 4.5 Contractor Status Report
  • 4.6 Formal Acceptance


5.0 Closing Process Group:

  • 5.1 Procurement Audit
  • 5.2 Contract Close-Out
  • 5.3 Information industry project or Phase Close-Out
  • 5.4 Lessons Learned

 

Results

With this Three Step process you will have all the tools you need for any Information industry project with this in-depth Information industry Toolkit.

In using the Toolkit you will be better able to:

  • Diagnose Information industry projects, initiatives, organizations, businesses and processes using accepted diagnostic standards and practices
  • Implement evidence-based best practice strategies aligned with overall goals
  • Integrate recent advances in Information industry and put process design strategies into practice according to best practice guidelines

Defining, designing, creating, and implementing a process to solve a business challenge or meet a business objective is the most valuable role; In EVERY company, organization and department.

Unless you are talking a one-time, single-use project within a business, there should be a process. Whether that process is managed and implemented by humans, AI, or a combination of the two, it needs to be designed by someone with a complex enough perspective to ask the right questions. Someone capable of asking the right questions and step back and say, 'What are we really trying to accomplish here? And is there a different way to look at it?'

This Toolkit empowers people to do just that - whether their title is entrepreneur, manager, consultant, (Vice-)President, CxO etc... - they are the people who rule the future. They are the person who asks the right questions to make Information industry investments work better.

This Information industry All-Inclusive Toolkit enables You to be that person.

 

Includes lifetime updates

Every self assessment comes with Lifetime Updates and Lifetime Free Updated Books. Lifetime Updates is an industry-first feature which allows you to receive verified self assessment updates, ensuring you always have the most accurate information at your fingertips.

46 Reviews Hide Reviews Show Reviews

  • 5
    The Self-Assessment is a great tool to gather feedback and input from others, especially challenges, and things to watch out for. Very helpful!

    Posted by JULIE M. on 5th Sep 2018

    JULIE M. AWS Solution Architect

  • 5
    Seems quite handy - going to start using it next month as we're investing quite a lot in it. This will define for us what to do in this space and solve a real problem (rather than chasing shiny objects).

    Posted by DAVIN B. on 5th Sep 2018

    DAVIN B. Systems Manager

  • 5
    Just looked at the files. Impressive. Well done. I am learning.

    Posted by MARTIN B. on 4th Sep 2018

    MARTIN B. Risks and Compliance, Vulnerability and Security Testing, Threat Detection and Response, Managed Security Services.

  • 5
    Great initiative and timing to release the requirements! And thanks a lot for sharing it with us!

    Posted by Pierre V. on 4th Sep 2018

    Pierre V. B2B Product & Content Marketing

  • 5
    Thank you for providing these valuable resources.

    Posted by HANS D. on 4th Sep 2018

    HANS D. Integration & Solution Architect

  • 5
    I have gone through the array of your works and they are simply awesome! Great job you have been doing.

    Posted by KENNETH O. on 4th Aug 2018

    KENNETH O. MD/CEO, Emerging Media

  • 5
    I look forward to becoming more familiar with the material and conducting the survey with my employer. So far it looks very comprehensive. Thank you.

    Posted by RON F. on 3rd Aug 2018

    RON F. Director Analytics Governance

  • 5
    Thank you. We will be offering your self assessment as a subject for our master students from autumn onwards.

    Posted by Christine R. on 3rd Aug 2018

    Christine R. University Officer

  • 5
    Hi everybody, The book is amazing, I will read it deeper during my next holidays. Thanks and regards

    Posted by Diego P. on 3rd Aug 2018

    Diego P. Head of BDA Business Unit