Logging as a service Toolkit: best-practice templates, step-by-step work plans and maturity diagnostics

RUB16,100.51
(46 reviews) Write a Review
Availability:
Downloadable Resources, Instant Access

Save time, empower your teams and effectively upgrade your processes with access to this practical Logging as a service Toolkit and guide. Address common challenges with best-practice templates, step-by-step work plans and maturity diagnostics for any Logging as a service related project.

Download the Toolkit and in Three Steps you will be guided from idea to implementation results.

The Toolkit contains the following practical and powerful enablers with new and updated Logging as a service specific requirements:


STEP 1: Get your bearings

Start with...

  • The latest quick edition of the Logging as a service Self Assessment book in PDF containing 49 requirements to perform a quickscan, get an overview and share with stakeholders.

Organized in a data driven improvement cycle RDMAICS (Recognize, Define, Measure, Analyze, Improve, Control and Sustain), check the…

  • Example pre-filled Self-Assessment Excel Dashboard to get familiar with results generation

Then find your goals...


STEP 2: Set concrete goals, tasks, dates and numbers you can track

Featuring 690 new and updated case-based questions, organized into seven core areas of process design, this Self-Assessment will help you identify areas in which Logging as a service improvements can be made.

Examples; 10 of the 690 standard requirements:

  1. In the past few months, what is the smallest change we have made that has had the biggest positive result? What was it about that small change that produced the large return?

  2. How will you know when its improved?

  3. What problems are you facing and how do you consider Logging as a service will circumvent those obstacles?

  4. Is there a recommended audit plan for routine surveillance inspections of Logging as a services gains?

  5. Is the optimal solution selected based on testing and analysis?

  6. Who will be responsible for deciding whether Logging as a service goes ahead or not after the initial investigations?

  7. Are there any disadvantages to implementing Logging as a service? There might be some that are less obvious?

  8. What should we measure to verify efficiency gains?

  9. Are improved process (should be) maps modified based on pilot data and analysis?

  10. What are the challenges?


Complete the self assessment, on your own or with a team in a workshop setting. Use the workbook together with the self assessment requirements spreadsheet:

  • The workbook is the latest in-depth complete edition of the Logging as a service book in PDF containing 690 requirements, which criteria correspond to the criteria in...

Your Logging as a service self-assessment dashboard which gives you your dynamically prioritized projects-ready tool and shows your organization exactly what to do next:

  • The Self-Assessment Excel Dashboard; with the Logging as a service Self-Assessment and Scorecard you will develop a clear picture of which Logging as a service areas need attention, which requirements you should focus on and who will be responsible for them:

    • Shows your organization instant insight in areas for improvement: Auto generates reports, radar chart for maturity assessment, insights per process and participant and bespoke, ready to use, RACI Matrix
    • Gives you a professional Dashboard to guide and perform a thorough Logging as a service Self-Assessment
    • Is secure: Ensures offline data protection of your Self-Assessment results
    • Dynamically prioritized projects-ready RACI Matrix shows your organization exactly what to do next:

 

STEP 3: Implement, Track, follow up and revise strategy

The outcomes of STEP 2, the self assessment, are the inputs for STEP 3; Start and manage Logging as a service projects with the 62 implementation resources:

  • 62 step-by-step Logging as a service Project Management Form Templates covering over 6000 Logging as a service project requirements and success criteria:

Examples; 10 of the check box criteria:

  1. Scope Management Plan: Do you have the reasons why the changes to the organizational systems and capabilities are required?

  2. Source Selection Criteria: Is a letter of commitment from each proposed team member and key subcontractor included?

  3. Cost Management Plan: Is a payment system in place with proper reviews and approvals?

  4. Requirements Management Plan: Are actual resource expenditures versus planned still acceptable?

  5. Cost Baseline: Has the actual cost of the Logging as a service project (or Logging as a service project phase) been tallied and compared to the approved budget?

  6. Monitoring and Controlling Process Group: What input will you be required to provide the Logging as a service project team?

  7. Risk Audit: If applicable; Are compilers and code generators available and suitable for the product to be built?

  8. Team Operating Agreement: What resources can be provided for the team in terms of equipment, space, time for training, protected time and space for meetings, and travel allowances?

  9. Quality Management Plan: Have all involved stakeholders and work groups committed to the Logging as a service project?

  10. Activity List: What is the total time required to complete the Logging as a service project if no delays occur?

 
Step-by-step and complete Logging as a service Project Management Forms and Templates including check box criteria and templates.

1.0 Initiating Process Group:

  • 1.1 Logging as a service project Charter
  • 1.2 Stakeholder Register
  • 1.3 Stakeholder Analysis Matrix


2.0 Planning Process Group:

  • 2.1 Logging as a service project Management Plan
  • 2.2 Scope Management Plan
  • 2.3 Requirements Management Plan
  • 2.4 Requirements Documentation
  • 2.5 Requirements Traceability Matrix
  • 2.6 Logging as a service project Scope Statement
  • 2.7 Assumption and Constraint Log
  • 2.8 Work Breakdown Structure
  • 2.9 WBS Dictionary
  • 2.10 Schedule Management Plan
  • 2.11 Activity List
  • 2.12 Activity Attributes
  • 2.13 Milestone List
  • 2.14 Network Diagram
  • 2.15 Activity Resource Requirements
  • 2.16 Resource Breakdown Structure
  • 2.17 Activity Duration Estimates
  • 2.18 Duration Estimating Worksheet
  • 2.19 Logging as a service project Schedule
  • 2.20 Cost Management Plan
  • 2.21 Activity Cost Estimates
  • 2.22 Cost Estimating Worksheet
  • 2.23 Cost Baseline
  • 2.24 Quality Management Plan
  • 2.25 Quality Metrics
  • 2.26 Process Improvement Plan
  • 2.27 Responsibility Assignment Matrix
  • 2.28 Roles and Responsibilities
  • 2.29 Human Resource Management Plan
  • 2.30 Communications Management Plan
  • 2.31 Risk Management Plan
  • 2.32 Risk Register
  • 2.33 Probability and Impact Assessment
  • 2.34 Probability and Impact Matrix
  • 2.35 Risk Data Sheet
  • 2.36 Procurement Management Plan
  • 2.37 Source Selection Criteria
  • 2.38 Stakeholder Management Plan
  • 2.39 Change Management Plan


3.0 Executing Process Group:

  • 3.1 Team Member Status Report
  • 3.2 Change Request
  • 3.3 Change Log
  • 3.4 Decision Log
  • 3.5 Quality Audit
  • 3.6 Team Directory
  • 3.7 Team Operating Agreement
  • 3.8 Team Performance Assessment
  • 3.9 Team Member Performance Assessment
  • 3.10 Issue Log


4.0 Monitoring and Controlling Process Group:

  • 4.1 Logging as a service project Performance Report
  • 4.2 Variance Analysis
  • 4.3 Earned Value Status
  • 4.4 Risk Audit
  • 4.5 Contractor Status Report
  • 4.6 Formal Acceptance


5.0 Closing Process Group:

  • 5.1 Procurement Audit
  • 5.2 Contract Close-Out
  • 5.3 Logging as a service project or Phase Close-Out
  • 5.4 Lessons Learned

 

Results

With this Three Step process you will have all the tools you need for any Logging as a service project with this in-depth Logging as a service Toolkit.

In using the Toolkit you will be better able to:

  • Diagnose Logging as a service projects, initiatives, organizations, businesses and processes using accepted diagnostic standards and practices
  • Implement evidence-based best practice strategies aligned with overall goals
  • Integrate recent advances in Logging as a service and put process design strategies into practice according to best practice guidelines

Defining, designing, creating, and implementing a process to solve a business challenge or meet a business objective is the most valuable role; In EVERY company, organization and department.

Unless you are talking a one-time, single-use project within a business, there should be a process. Whether that process is managed and implemented by humans, AI, or a combination of the two, it needs to be designed by someone with a complex enough perspective to ask the right questions. Someone capable of asking the right questions and step back and say, 'What are we really trying to accomplish here? And is there a different way to look at it?'

This Toolkit empowers people to do just that - whether their title is entrepreneur, manager, consultant, (Vice-)President, CxO etc... - they are the people who rule the future. They are the person who asks the right questions to make Logging as a service investments work better.

This Logging as a service All-Inclusive Toolkit enables You to be that person.

 

Includes lifetime updates

Every self assessment comes with Lifetime Updates and Lifetime Free Updated Books. Lifetime Updates is an industry-first feature which allows you to receive verified self assessment updates, ensuring you always have the most accurate information at your fingertips.

46 Reviews Hide Reviews Show Reviews

  • 5
    Thank you again for sharing your expertise with us.

    Posted by Ken W. on 5th Sep 2018

    Ken W. Publisher & VP, Sales and Marketing

  • 5
    I have read your book and it's a great work for my business. Thank you.

    Posted by Nguyen Hoang Vu on 3rd Sep 2018

    Nguyen Hoang Vu

  • 5
    I really like the format. Simple but quite powerful. I will make sure to share my views with Amazon. Thanks again.

    Posted by CARL M. on 2nd Sep 2018

    CARL M. Senior Solutions Architect

  • 5
    MARIETTA W. Senior Consultant

    Posted by MARIETTA W. on 4th Aug 2018

    Standard Requirements is a straightforward guide. It is a tool to help develop a detailed vision of all areas impacted by an implementation, and a useful tool for scoring readiness and implementation quality.

  • 5
    I will use everything extensively to prepare for an audit scheduled in Dec and Jan for an important automotive customer.

    Posted by Bruno C. on 3rd Aug 2018

    Bruno C. ICT Director

  • 5
    Man, thanks again for sharing. Really a life saver! Greetings!

    Posted by DAAN C on 3rd Aug 2018

    DAAN C Senior Consultant

  • 5
    Just looked at the files. Impressive. Well done. I am learning.

    Posted by MARTIN B. on 4th Jul 2018

    MARTIN B. Risks and Compliance, Vulnerability and Security Testing, Threat Detection and Response, Managed Security Services.

  • 5
    Thanks for your service! That's really appreciated!

    Posted by HARRY M. on 3rd Jul 2018

    HARRY M. Enterprise Architect

  • 5
    The Honourable Ralph Goodale, Minister of Public Safety and Emergency Preparedness, Canada

    Posted by The Honourable Ralph Goodale, Minister of Public Safety and Emergency Preparedness, Canada on 2nd Jul 2018

    I would like to extend my sincere appreciation. I would also like to thank you for your service in promoting business continuity practices. I wish you every success in your work.