Next-Generation Memory Toolkit: best-practice templates, step-by-step work plans and maturity diagnostics

$249.00
(46 reviews) Write a Review
Availability:
Downloadable Resources, Instant Access

Save time, empower your teams and effectively upgrade your processes with access to this practical Next-Generation Memory Toolkit and guide. Address common challenges with best-practice templates, step-by-step work plans and maturity diagnostics for any Next-Generation Memory related project.

Download the Toolkit and in Three Steps you will be guided from idea to implementation results.

The Toolkit contains the following practical and powerful enablers with new and updated Next-Generation Memory specific requirements:


STEP 1: Get your bearings

Start with...

  • The latest quick edition of the Next-Generation Memory Self Assessment book in PDF containing 49 requirements to perform a quickscan, get an overview and share with stakeholders.

Organized in a data driven improvement cycle RDMAICS (Recognize, Define, Measure, Analyze, Improve, Control and Sustain), check the…

  • Example pre-filled Self-Assessment Excel Dashboard to get familiar with results generation

Then find your goals...


STEP 2: Set concrete goals, tasks, dates and numbers you can track

Featuring 788 new and updated case-based questions, organized into seven core areas of process design, this Self-Assessment will help you identify areas in which Next-Generation Memory improvements can be made.

Examples; 10 of the 788 standard requirements:

  1. What is the cost of poor quality as supported by the teams analysis?

  2. How will measures be used to manage and adapt?

  3. Were Pareto charts (or similar) used to portray the heavy hitters (or key sources of variation)?

  4. How do you assess your Next-Generation Memory workforce capability and capacity needs, including skills, competencies, and staffing levels?

  5. Whats the best design framework for Next-Generation Memory organization now that, in a post industrial-age if the top-down, command and control model is no longer relevant?

  6. Who else hopes to benefit from it?

  7. Who are the Next-Generation Memory improvement team members, including Management Leads and Coaches?

  8. Is the Next-Generation Memory process severely broken such that a re-design is necessary?

  9. Does Next-Generation Memory create potential expectations in other areas that need to be recognized and considered?

  10. Think about some of the processes you undertake within your organization. which do you own?


Complete the self assessment, on your own or with a team in a workshop setting. Use the workbook together with the self assessment requirements spreadsheet:

  • The workbook is the latest in-depth complete edition of the Next-Generation Memory book in PDF containing 788 requirements, which criteria correspond to the criteria in...

Your Next-Generation Memory self-assessment dashboard which gives you your dynamically prioritized projects-ready tool and shows your organization exactly what to do next:

  • The Self-Assessment Excel Dashboard; with the Next-Generation Memory Self-Assessment and Scorecard you will develop a clear picture of which Next-Generation Memory areas need attention, which requirements you should focus on and who will be responsible for them:

    • Shows your organization instant insight in areas for improvement: Auto generates reports, radar chart for maturity assessment, insights per process and participant and bespoke, ready to use, RACI Matrix
    • Gives you a professional Dashboard to guide and perform a thorough Next-Generation Memory Self-Assessment
    • Is secure: Ensures offline data protection of your Self-Assessment results
    • Dynamically prioritized projects-ready RACI Matrix shows your organization exactly what to do next:

 

STEP 3: Implement, Track, follow up and revise strategy

The outcomes of STEP 2, the self assessment, are the inputs for STEP 3; Start and manage Next-Generation Memory projects with the 62 implementation resources:

  • 62 step-by-step Next-Generation Memory Project Management Form Templates covering over 6000 Next-Generation Memory project requirements and success criteria:

Examples; 10 of the check box criteria:

  1. Change Request: How does an organization control changes before and after software is released to a customer?

  2. Human Resource Management Plan: Have the key elements of a coherent Next-Generation Memory project management strategy been established?

  3. Risk Management Plan: Financial risk: Can the organization afford to undertake the Next-Generation Memory project?

  4. Activity Duration Estimates: Are contingency plans created to prepare for risk events to occur?

  5. Quality Audit: What has changed/improved as a result of the review processes?

  6. Activity Duration Estimates: Is earned value analysis completed to assess Next-Generation Memory project performance?

  7. Variance Analysis: Are overhead cost budgets established for each department which has authority to incur overhead costs?

  8. Risk Audit: What does internal control mean in the context of the audit process?

  9. Activity Duration Estimates: Research recruiting and retention strategies at three different companies. What distinguishes one company from another in this area?

  10. Procurement Management Plan: Have the key elements of a coherent Next-Generation Memory project management strategy been established?

 
Step-by-step and complete Next-Generation Memory Project Management Forms and Templates including check box criteria and templates.

1.0 Initiating Process Group:

  • 1.1 Next-Generation Memory project Charter
  • 1.2 Stakeholder Register
  • 1.3 Stakeholder Analysis Matrix


2.0 Planning Process Group:

  • 2.1 Next-Generation Memory project Management Plan
  • 2.2 Scope Management Plan
  • 2.3 Requirements Management Plan
  • 2.4 Requirements Documentation
  • 2.5 Requirements Traceability Matrix
  • 2.6 Next-Generation Memory project Scope Statement
  • 2.7 Assumption and Constraint Log
  • 2.8 Work Breakdown Structure
  • 2.9 WBS Dictionary
  • 2.10 Schedule Management Plan
  • 2.11 Activity List
  • 2.12 Activity Attributes
  • 2.13 Milestone List
  • 2.14 Network Diagram
  • 2.15 Activity Resource Requirements
  • 2.16 Resource Breakdown Structure
  • 2.17 Activity Duration Estimates
  • 2.18 Duration Estimating Worksheet
  • 2.19 Next-Generation Memory project Schedule
  • 2.20 Cost Management Plan
  • 2.21 Activity Cost Estimates
  • 2.22 Cost Estimating Worksheet
  • 2.23 Cost Baseline
  • 2.24 Quality Management Plan
  • 2.25 Quality Metrics
  • 2.26 Process Improvement Plan
  • 2.27 Responsibility Assignment Matrix
  • 2.28 Roles and Responsibilities
  • 2.29 Human Resource Management Plan
  • 2.30 Communications Management Plan
  • 2.31 Risk Management Plan
  • 2.32 Risk Register
  • 2.33 Probability and Impact Assessment
  • 2.34 Probability and Impact Matrix
  • 2.35 Risk Data Sheet
  • 2.36 Procurement Management Plan
  • 2.37 Source Selection Criteria
  • 2.38 Stakeholder Management Plan
  • 2.39 Change Management Plan


3.0 Executing Process Group:

  • 3.1 Team Member Status Report
  • 3.2 Change Request
  • 3.3 Change Log
  • 3.4 Decision Log
  • 3.5 Quality Audit
  • 3.6 Team Directory
  • 3.7 Team Operating Agreement
  • 3.8 Team Performance Assessment
  • 3.9 Team Member Performance Assessment
  • 3.10 Issue Log


4.0 Monitoring and Controlling Process Group:

  • 4.1 Next-Generation Memory project Performance Report
  • 4.2 Variance Analysis
  • 4.3 Earned Value Status
  • 4.4 Risk Audit
  • 4.5 Contractor Status Report
  • 4.6 Formal Acceptance


5.0 Closing Process Group:

  • 5.1 Procurement Audit
  • 5.2 Contract Close-Out
  • 5.3 Next-Generation Memory project or Phase Close-Out
  • 5.4 Lessons Learned

 

Results

With this Three Step process you will have all the tools you need for any Next-Generation Memory project with this in-depth Next-Generation Memory Toolkit.

In using the Toolkit you will be better able to:

  • Diagnose Next-Generation Memory projects, initiatives, organizations, businesses and processes using accepted diagnostic standards and practices
  • Implement evidence-based best practice strategies aligned with overall goals
  • Integrate recent advances in Next-Generation Memory and put process design strategies into practice according to best practice guidelines

Defining, designing, creating, and implementing a process to solve a business challenge or meet a business objective is the most valuable role; In EVERY company, organization and department.

Unless you are talking a one-time, single-use project within a business, there should be a process. Whether that process is managed and implemented by humans, AI, or a combination of the two, it needs to be designed by someone with a complex enough perspective to ask the right questions. Someone capable of asking the right questions and step back and say, 'What are we really trying to accomplish here? And is there a different way to look at it?'

This Toolkit empowers people to do just that - whether their title is entrepreneur, manager, consultant, (Vice-)President, CxO etc... - they are the people who rule the future. They are the person who asks the right questions to make Next-Generation Memory investments work better.

This Next-Generation Memory All-Inclusive Toolkit enables You to be that person.

 

Includes lifetime updates

Every self assessment comes with Lifetime Updates and Lifetime Free Updated Books. Lifetime Updates is an industry-first feature which allows you to receive verified self assessment updates, ensuring you always have the most accurate information at your fingertips.

46 Reviews Hide Reviews Show Reviews

  • 5
    Thank you for providing these valuable resources.

    Posted by HANS D. on 6th Sep 2018

    HANS D. Integration & Solution Architect

  • 5
    Hi everybody, The book is amazing, I will read it deeper during my next holidays. Thanks and regards

    Posted by Diego P. on 5th Sep 2018

    Diego P. Head of BDA Business Unit

  • 5
    The Honourable Ralph Goodale, Minister of Public Safety and Emergency Preparedness, Canada

    Posted by The Honourable Ralph Goodale, Minister of Public Safety and Emergency Preparedness, Canada on 5th Sep 2018

    I would like to extend my sincere appreciation. I would also like to thank you for your service in promoting business continuity practices. I wish you every success in your work.

  • 5
    Thank you for the excel dashboard. It is so powerful.

    Posted by TAHAR H. on 5th Sep 2018

    TAHAR H. Researcher at Institute of Economic Analysis and Prospective Studies

  • 5
    Seems quite handy - going to start using it next month as we're investing quite a lot in it. This will define for us what to do in this space and solve a real problem (rather than chasing shiny objects).

    Posted by DAVIN B. on 5th Sep 2018

    DAVIN B. Systems Manager

  • 5
    Thank you. We will be offering your self assessment as a subject for our master students from autumn onwards.

    Posted by Christine R. on 4th Aug 2018

    Christine R. University Officer

  • 5
    Awesome!!!!!!

    Posted by JOHN G. on 4th Aug 2018

    JOHN G. Principal Consultant

  • 5
    Thank you so much... Hope to visit Australia someday. Smart IT people... 5 star review.

    Posted by ELLEN C. on 6th Jul 2018

    ELLEN C. Enterprise Innovation: Business & Information Technology Strategist

  • 5
    I will use everything extensively to prepare for an audit scheduled in Dec and Jan for an important automotive customer.

    Posted by Bruno C. on 6th Jul 2018

    Bruno C. ICT Director