Object-Oriented Software Construction Toolkit: best-practice templates, step-by-step work plans and maturity diagnostics

$249.00
(46 reviews) Write a Review
Availability:
Downloadable Resources, Instant Access

Save time, empower your teams and effectively upgrade your processes with access to this practical Object-Oriented Software Construction Toolkit and guide. Address common challenges with best-practice templates, step-by-step work plans and maturity diagnostics for any Object-Oriented Software Construction related project.

Download the Toolkit and in Three Steps you will be guided from idea to implementation results.

The Toolkit contains the following practical and powerful enablers with new and updated Object-Oriented Software Construction specific requirements:


STEP 1: Get your bearings

Start with...

  • The latest quick edition of the Object-Oriented Software Construction Self Assessment book in PDF containing 49 requirements to perform a quickscan, get an overview and share with stakeholders.

Organized in a data driven improvement cycle RDMAICS (Recognize, Define, Measure, Analyze, Improve, Control and Sustain), check the…

  • Example pre-filled Self-Assessment Excel Dashboard to get familiar with results generation

Then find your goals...


STEP 2: Set concrete goals, tasks, dates and numbers you can track

Featuring 674 new and updated case-based questions, organized into seven core areas of process design, this Self-Assessment will help you identify areas in which Object-Oriented Software Construction improvements can be made.

Examples; 10 of the 674 standard requirements:

  1. Are there any disadvantages to implementing Object-Oriented Software Construction? There might be some that are less obvious?

  2. Who will be responsible for documenting the Object-Oriented Software Construction requirements in detail?

  3. Have all non-recommended alternatives been analyzed in sufficient detail?

  4. Can the solution be designed and implemented within an acceptable time period?

  5. Instead of going to current contacts for new ideas, what if you reconnected with dormant contacts--the people you used to know? If you were going reactivate a dormant tie, who would it be?

  6. Will any special training be provided for results interpretation?

  7. What kind of crime could a potential new hire have committed that would not only not disqualify him/her from being hired by our organization, but would actually indicate that he/she might be a particularly good fit?

  8. Are there recognized Object-Oriented Software Construction problems?

  9. Will Object-Oriented Software Construction deliverables need to be tested and, if so, by whom?

  10. Is the team sponsored by a champion or stakeholder leader?


Complete the self assessment, on your own or with a team in a workshop setting. Use the workbook together with the self assessment requirements spreadsheet:

  • The workbook is the latest in-depth complete edition of the Object-Oriented Software Construction book in PDF containing 674 requirements, which criteria correspond to the criteria in...

Your Object-Oriented Software Construction self-assessment dashboard which gives you your dynamically prioritized projects-ready tool and shows your organization exactly what to do next:

  • The Self-Assessment Excel Dashboard; with the Object-Oriented Software Construction Self-Assessment and Scorecard you will develop a clear picture of which Object-Oriented Software Construction areas need attention, which requirements you should focus on and who will be responsible for them:

    • Shows your organization instant insight in areas for improvement: Auto generates reports, radar chart for maturity assessment, insights per process and participant and bespoke, ready to use, RACI Matrix
    • Gives you a professional Dashboard to guide and perform a thorough Object-Oriented Software Construction Self-Assessment
    • Is secure: Ensures offline data protection of your Self-Assessment results
    • Dynamically prioritized projects-ready RACI Matrix shows your organization exactly what to do next:

 

STEP 3: Implement, Track, follow up and revise strategy

The outcomes of STEP 2, the self assessment, are the inputs for STEP 3; Start and manage Object-Oriented Software Construction projects with the 62 implementation resources:

  • 62 step-by-step Object-Oriented Software Construction Project Management Form Templates covering over 6000 Object-Oriented Software Construction project requirements and success criteria:

Examples; 10 of the check box criteria:

  1. Procurement Audit: Was the organization specific about the nature and scope of the performance before launching the procurement process?

  2. Probability and Impact Assessment: Who should be responsible for the monitoring and tracking of the indicators you've identified?

  3. Human Resource Management Plan: How relevant is this attribute to this Object-Oriented Software Construction project or audit?

  4. Stakeholder Management Plan: Are there checklists created to demine if all quality processes are followed?

  5. Risk Management Plan: Can the risk be avoided by choosing a different alternative?

  6. Project Performance Report: To what degree does the teamÕs work approach provide opportunity for members to engage in open interaction?

  7. Initiating Process Group: What areas does the group agree are the biggest success on the Object-Oriented Software Construction project?

  8. Issue Log: Is there an important stakeholder who is actively opposed and will not receive messages?

  9. Schedule Management Plan: Has a provision been made to reassess Object-Oriented Software Construction project risks at various Object-Oriented Software Construction project stages?

  10. Risk Audit: Will participants be required to sign a legally counselled waiver or risk disclaimer when entering an event?

 
Step-by-step and complete Object-Oriented Software Construction Project Management Forms and Templates including check box criteria and templates.

1.0 Initiating Process Group:

  • 1.1 Object-Oriented Software Construction project Charter
  • 1.2 Stakeholder Register
  • 1.3 Stakeholder Analysis Matrix


2.0 Planning Process Group:

  • 2.1 Object-Oriented Software Construction project Management Plan
  • 2.2 Scope Management Plan
  • 2.3 Requirements Management Plan
  • 2.4 Requirements Documentation
  • 2.5 Requirements Traceability Matrix
  • 2.6 Object-Oriented Software Construction project Scope Statement
  • 2.7 Assumption and Constraint Log
  • 2.8 Work Breakdown Structure
  • 2.9 WBS Dictionary
  • 2.10 Schedule Management Plan
  • 2.11 Activity List
  • 2.12 Activity Attributes
  • 2.13 Milestone List
  • 2.14 Network Diagram
  • 2.15 Activity Resource Requirements
  • 2.16 Resource Breakdown Structure
  • 2.17 Activity Duration Estimates
  • 2.18 Duration Estimating Worksheet
  • 2.19 Object-Oriented Software Construction project Schedule
  • 2.20 Cost Management Plan
  • 2.21 Activity Cost Estimates
  • 2.22 Cost Estimating Worksheet
  • 2.23 Cost Baseline
  • 2.24 Quality Management Plan
  • 2.25 Quality Metrics
  • 2.26 Process Improvement Plan
  • 2.27 Responsibility Assignment Matrix
  • 2.28 Roles and Responsibilities
  • 2.29 Human Resource Management Plan
  • 2.30 Communications Management Plan
  • 2.31 Risk Management Plan
  • 2.32 Risk Register
  • 2.33 Probability and Impact Assessment
  • 2.34 Probability and Impact Matrix
  • 2.35 Risk Data Sheet
  • 2.36 Procurement Management Plan
  • 2.37 Source Selection Criteria
  • 2.38 Stakeholder Management Plan
  • 2.39 Change Management Plan


3.0 Executing Process Group:

  • 3.1 Team Member Status Report
  • 3.2 Change Request
  • 3.3 Change Log
  • 3.4 Decision Log
  • 3.5 Quality Audit
  • 3.6 Team Directory
  • 3.7 Team Operating Agreement
  • 3.8 Team Performance Assessment
  • 3.9 Team Member Performance Assessment
  • 3.10 Issue Log


4.0 Monitoring and Controlling Process Group:

  • 4.1 Object-Oriented Software Construction project Performance Report
  • 4.2 Variance Analysis
  • 4.3 Earned Value Status
  • 4.4 Risk Audit
  • 4.5 Contractor Status Report
  • 4.6 Formal Acceptance


5.0 Closing Process Group:

  • 5.1 Procurement Audit
  • 5.2 Contract Close-Out
  • 5.3 Object-Oriented Software Construction project or Phase Close-Out
  • 5.4 Lessons Learned

 

Results

With this Three Step process you will have all the tools you need for any Object-Oriented Software Construction project with this in-depth Object-Oriented Software Construction Toolkit.

In using the Toolkit you will be better able to:

  • Diagnose Object-Oriented Software Construction projects, initiatives, organizations, businesses and processes using accepted diagnostic standards and practices
  • Implement evidence-based best practice strategies aligned with overall goals
  • Integrate recent advances in Object-Oriented Software Construction and put process design strategies into practice according to best practice guidelines

Defining, designing, creating, and implementing a process to solve a business challenge or meet a business objective is the most valuable role; In EVERY company, organization and department.

Unless you are talking a one-time, single-use project within a business, there should be a process. Whether that process is managed and implemented by humans, AI, or a combination of the two, it needs to be designed by someone with a complex enough perspective to ask the right questions. Someone capable of asking the right questions and step back and say, 'What are we really trying to accomplish here? And is there a different way to look at it?'

This Toolkit empowers people to do just that - whether their title is entrepreneur, manager, consultant, (Vice-)President, CxO etc... - they are the people who rule the future. They are the person who asks the right questions to make Object-Oriented Software Construction investments work better.

This Object-Oriented Software Construction All-Inclusive Toolkit enables You to be that person.

 

Includes lifetime updates

Every self assessment comes with Lifetime Updates and Lifetime Free Updated Books. Lifetime Updates is an industry-first feature which allows you to receive verified self assessment updates, ensuring you always have the most accurate information at your fingertips.

46 Reviews Hide Reviews Show Reviews

  • 5
    The Honourable Ralph Goodale, Minister of Public Safety and Emergency Preparedness, Canada

    Posted by The Honourable Ralph Goodale, Minister of Public Safety and Emergency Preparedness, Canada on 6th Sep 2018

    I would like to extend my sincere appreciation. I would also like to thank you for your service in promoting business continuity practices. I wish you every success in your work.

  • 5
    Thank you, this is perfect - I will certainly be recommending Self Assessment dashboards to all - I can not wait to tell my colleagues on Monday.

    Posted by MEL F. on 5th Sep 2018

    MEL F. Change Management Professional

  • 5
    Thanks for your service! That's really appreciated!

    Posted by HARRY M. on 4th Sep 2018

    HARRY M. Enterprise Architect

  • 5
    Thank you. I would very much like to read your publication and share my views on our blog to reach our English and Spanish customers.

    Posted by James S. on 4th Sep 2018

    James S. Account Manager

  • 5
    Seems quite handy - going to start using it next month as we're investing quite a lot in it. This will define for us what to do in this space and solve a real problem (rather than chasing shiny objects).

    Posted by DAVIN B. on 2nd Sep 2018

    DAVIN B. Systems Manager

  • 5
    It is a pleasure to know about new tools to improve our performance. Let me congratulate to you about your new achievement.

    Posted by Marta C. on 2nd Sep 2018

    MARTA C., Cybersecurity and Antifraud Consultant

  • 5
    Thank you for the excel dashboard. It is so powerful.

    Posted by TAHAR H. on 6th Aug 2018

    TAHAR H. Researcher at Institute of Economic Analysis and Prospective Studies

  • 5
    CARSTEN B. Experienced safety and quality enabler

    Posted by CARSTEN B. on 6th Aug 2018

    So far I have only had time to browse it very superficially, but form that it looks very comprehensive and at the same time practical. As soon as I find time I will do a short item on it on my literature pages and point risk management professionals in your direction. Have a great day, and all the best!!

  • 5
    This is awesome. Thank you very much.

    Posted by Dr. Martin K. on 5th Aug 2018

    Dr. Martin K. CEO