Account Navigation

Account Navigation

Currency - All prices are in AUD

Currency - All prices are in AUD
 Loading... Please wait...
The Art of Service Standard Requirements Self Assessments

Open space Toolkit: best-practice templates, step-by-step work plans and maturity diagnostics

$249.00

Open space Toolkit: best-practice templates, step-by-step work plans and maturity diagnostics

$249.00

Availability:
Downloadable Resources, Instant Access

Product Description

Save time, empower your teams and effectively upgrade your processes with access to this practical Open space Toolkit and guide. Address common challenges with best-practice templates, step-by-step work plans and maturity diagnostics for any Open space related project.

Download the Toolkit and in Three Steps you will be guided from idea to implementation results.

The Toolkit contains the following practical and powerful enablers with new and updated Open space specific requirements:


STEP 1: Get your bearings

Start with...

  • The latest quick edition of the Open space Self Assessment book in PDF containing 49 requirements to perform a quickscan, get an overview and share with stakeholders.

Organized in a data driven improvement cycle RDMAICS (Recognize, Define, Measure, Analyze, Improve, Control and Sustain), check the…

  • Example pre-filled Self-Assessment Excel Dashboard to get familiar with results generation

Then find your goals...


STEP 2: Set concrete goals, tasks, dates and numbers you can track

Featuring new and updated case-based questions, organized into seven core areas of process design, this Self-Assessment will help you identify areas in which Open space improvements can be made.

Examples; 10 of the standard requirements:

  1. Instead of going to current contacts for new ideas, what if you reconnected with dormant contacts--the people you used to know? If you were going reactivate a dormant tie, who would it be?

  2. How can we incorporate support to ensure safe and effective use of Open space into the services that we provide?

  3. How do we keep improving Open space?

  4. What charts has the team used to display the components of variation in the process?

  5. Who has control over resources?

  6. Is the suppliers process defined and controlled?

  7. Where do ideas that reach policy makers and planners as proposals for Open space strengthening and reform actually originate?

  8. What key inputs and outputs are being measured on an ongoing basis?

  9. How does the solution remove the key sources of issues discovered in the analyze phase?

  10. What key stakeholder process output measure(s) does Open space leverage and how?


Complete the self assessment, on your own or with a team in a workshop setting. Use the workbook together with the self assessment requirements spreadsheet:

  • The workbook is the latest in-depth complete edition of the Open space book in PDF containing requirements, which criteria correspond to the criteria in...

Your Open space self-assessment dashboard which gives you your dynamically prioritized projects-ready tool and shows your organization exactly what to do next:

  • The Self-Assessment Excel Dashboard; with the Open space Self-Assessment and Scorecard you will develop a clear picture of which Open space areas need attention, which requirements you should focus on and who will be responsible for them:

    • Shows your organization instant insight in areas for improvement: Auto generates reports, radar chart for maturity assessment, insights per process and participant and bespoke, ready to use, RACI Matrix
    • Gives you a professional Dashboard to guide and perform a thorough Open space Self-Assessment
    • Is secure: Ensures offline data protection of your Self-Assessment results
    • Dynamically prioritized projects-ready RACI Matrix shows your organization exactly what to do next:

 

STEP 3: Implement, Track, follow up and revise strategy

The outcomes of STEP 2, the self assessment, are the inputs for STEP 3; Start and manage Open space projects with the 62 implementation resources:

  • 62 step-by-step Open space Project Management Form Templates covering over 6000 Open space project requirements and success criteria:

Examples; 10 of the check box criteria:

  1. Schedule Management Plan: Is there anything planned that doesn t need to be here?

  2. Schedule Management Plan: Have all involved Open space project stakeholders and work groups committed to the Open space project?

  3. Probability and Impact Assessment: How are the local factors going to affect the absorption?

  4. Source Selection Criteria: How and when do you enter into Open space project Procurement Management?

  5. Requirements Management Plan: How will unresolved questions be handled once approval has been obtained?

  6. Assumption and Constraint Log: Are there procedures in place to effectively manage interdependencies with other Open space projects / systems?

  7. Cost Management Plan: Is it possible to track all classes of Open space project work (e.g. scheduled, un-scheduled, defect repair, etc.)?

  8. Variance Analysis: How does the monthly budget compare to the actual experience?

  9. Team Directory: Process Decisions: Which organizational elements and which individuals will be assigned management functions?

  10. Stakeholder Management Plan: What would you gain if you spent time working to improve this process?

 
Step-by-step and complete Open space Project Management Forms and Templates including check box criteria and templates.

1.0 Initiating Process Group:

  • 1.1 Open space project Charter
  • 1.2 Stakeholder Register
  • 1.3 Stakeholder Analysis Matrix


2.0 Planning Process Group:

  • 2.1 Open space project Management Plan
  • 2.2 Scope Management Plan
  • 2.3 Requirements Management Plan
  • 2.4 Requirements Documentation
  • 2.5 Requirements Traceability Matrix
  • 2.6 Open space project Scope Statement
  • 2.7 Assumption and Constraint Log
  • 2.8 Work Breakdown Structure
  • 2.9 WBS Dictionary
  • 2.10 Schedule Management Plan
  • 2.11 Activity List
  • 2.12 Activity Attributes
  • 2.13 Milestone List
  • 2.14 Network Diagram
  • 2.15 Activity Resource Requirements
  • 2.16 Resource Breakdown Structure
  • 2.17 Activity Duration Estimates
  • 2.18 Duration Estimating Worksheet
  • 2.19 Open space project Schedule
  • 2.20 Cost Management Plan
  • 2.21 Activity Cost Estimates
  • 2.22 Cost Estimating Worksheet
  • 2.23 Cost Baseline
  • 2.24 Quality Management Plan
  • 2.25 Quality Metrics
  • 2.26 Process Improvement Plan
  • 2.27 Responsibility Assignment Matrix
  • 2.28 Roles and Responsibilities
  • 2.29 Human Resource Management Plan
  • 2.30 Communications Management Plan
  • 2.31 Risk Management Plan
  • 2.32 Risk Register
  • 2.33 Probability and Impact Assessment
  • 2.34 Probability and Impact Matrix
  • 2.35 Risk Data Sheet
  • 2.36 Procurement Management Plan
  • 2.37 Source Selection Criteria
  • 2.38 Stakeholder Management Plan
  • 2.39 Change Management Plan


3.0 Executing Process Group:

  • 3.1 Team Member Status Report
  • 3.2 Change Request
  • 3.3 Change Log
  • 3.4 Decision Log
  • 3.5 Quality Audit
  • 3.6 Team Directory
  • 3.7 Team Operating Agreement
  • 3.8 Team Performance Assessment
  • 3.9 Team Member Performance Assessment
  • 3.10 Issue Log


4.0 Monitoring and Controlling Process Group:

  • 4.1 Open space project Performance Report
  • 4.2 Variance Analysis
  • 4.3 Earned Value Status
  • 4.4 Risk Audit
  • 4.5 Contractor Status Report
  • 4.6 Formal Acceptance


5.0 Closing Process Group:

  • 5.1 Procurement Audit
  • 5.2 Contract Close-Out
  • 5.3 Open space project or Phase Close-Out
  • 5.4 Lessons Learned

 

Results

With this Three Step process you will have all the tools you need for any Open space project with this in-depth Open space Toolkit.

In using the Toolkit you will be better able to:

  • Diagnose Open space projects, initiatives, organizations, businesses and processes using accepted diagnostic standards and practices
  • Implement evidence-based best practice strategies aligned with overall goals
  • Integrate recent advances in Open space and put process design strategies into practice according to best practice guidelines

Defining, designing, creating, and implementing a process to solve a business challenge or meet a business objective is the most valuable role; In EVERY company, organization and department.

Unless you are talking a one-time, single-use project within a business, there should be a process. Whether that process is managed and implemented by humans, AI, or a combination of the two, it needs to be designed by someone with a complex enough perspective to ask the right questions. Someone capable of asking the right questions and step back and say, 'What are we really trying to accomplish here? And is there a different way to look at it?'

This Toolkit empowers people to do just that - whether their title is entrepreneur, manager, consultant, (Vice-)President, CxO etc... - they are the people who rule the future. They are the person who asks the right questions to make Open space investments work better.

This Open space All-Inclusive Toolkit enables You to be that person.

 

Includes lifetime updates

Every self assessment comes with Lifetime Updates and Lifetime Free Updated Books. Lifetime Updates is an industry-first feature which allows you to receive verified self assessment updates, ensuring you always have the most accurate information at your fingertips.

Product Reviews

Find Similar Products by Category