Probability distribution Toolkit: best-practice templates, step-by-step work plans and maturity diagnostics

$249.00
(46 reviews) Write a Review
Availability:
Downloadable Resources, Instant Access

Save time, empower your teams and effectively upgrade your processes with access to this practical Probability distribution Toolkit and guide. Address common challenges with best-practice templates, step-by-step work plans and maturity diagnostics for any Probability distribution related project.

Download the Toolkit and in Three Steps you will be guided from idea to implementation results.

The Toolkit contains the following practical and powerful enablers with new and updated Probability distribution specific requirements:


STEP 1: Get your bearings

Start with...

  • The latest quick edition of the Probability distribution Self Assessment book in PDF containing 49 requirements to perform a quickscan, get an overview and share with stakeholders.

Organized in a data driven improvement cycle RDMAICS (Recognize, Define, Measure, Analyze, Improve, Control and Sustain), check the…

  • Example pre-filled Self-Assessment Excel Dashboard to get familiar with results generation

Then find your goals...


STEP 2: Set concrete goals, tasks, dates and numbers you can track

Featuring 700 new and updated case-based questions, organized into seven core areas of process design, this Self-Assessment will help you identify areas in which Probability distribution improvements can be made.

Examples; 10 of the 700 standard requirements:

  1. What actually has to improve and by how much?

  2. Was a detailed process map created to amplify critical steps of the as is stakeholder process?

  3. How will you know that the Probability distribution project has been successful?

  4. What controls do we have in place to protect data?

  5. Who controls critical resources?

  6. What information do users need?

  7. What is Effective Probability distribution?

  8. Will Probability distribution have an impact on current business continuity, disaster recovery processes and/or infrastructure?

  9. Schedule Development, Feasibility Analysis, Probability distribution Management, Project Closings, Technique: Using the Critical Path Method

  10. What has the team done to assure the stability and accuracy of the measurement process?


Complete the self assessment, on your own or with a team in a workshop setting. Use the workbook together with the self assessment requirements spreadsheet:

  • The workbook is the latest in-depth complete edition of the Probability distribution book in PDF containing 700 requirements, which criteria correspond to the criteria in...

Your Probability distribution self-assessment dashboard which gives you your dynamically prioritized projects-ready tool and shows your organization exactly what to do next:

  • The Self-Assessment Excel Dashboard; with the Probability distribution Self-Assessment and Scorecard you will develop a clear picture of which Probability distribution areas need attention, which requirements you should focus on and who will be responsible for them:

    • Shows your organization instant insight in areas for improvement: Auto generates reports, radar chart for maturity assessment, insights per process and participant and bespoke, ready to use, RACI Matrix
    • Gives you a professional Dashboard to guide and perform a thorough Probability distribution Self-Assessment
    • Is secure: Ensures offline data protection of your Self-Assessment results
    • Dynamically prioritized projects-ready RACI Matrix shows your organization exactly what to do next:

 

STEP 3: Implement, Track, follow up and revise strategy

The outcomes of STEP 2, the self assessment, are the inputs for STEP 3; Start and manage Probability distribution projects with the 62 implementation resources:

  • 62 step-by-step Probability distribution Project Management Form Templates covering over 6000 Probability distribution project requirements and success criteria:

Examples; 10 of the check box criteria:

  1. Cost Baseline: What is the most important thing to do next to make your Probability distribution project successful?

  2. Activity Cost Estimates: What were things that you did very well and want to do the same again on the next Probability distribution project?

  3. Procurement Audit: Was the payment made to the supplier/ contractor within the time frames indicated in the contracts?

  4. Communications Management Plan: Do you ask; can you recommend others for me to talk with about this initiative?

  5. Monitoring and Controlling Process Group: Propriety: Who needs to be involved in the evaluation to be ethical?

  6. Risk Audit: Do you have a consistent repeatable process that is actually used?

  7. Procurement Audit: Is the strategy implemented across the entire organization?

  8. Cost Baseline: Has the actual cost of the Probability distribution project (or Probability distribution project phase) been tallied and compared to the approved budget?

  9. Human Resource Management Plan: Are all key components of a Quality Assurance Plan present?

  10. Variance Analysis: Is the entire contract planned in time-phased control accounts to the extent practicable?

 
Step-by-step and complete Probability distribution Project Management Forms and Templates including check box criteria and templates.

1.0 Initiating Process Group:

  • 1.1 Probability distribution project Charter
  • 1.2 Stakeholder Register
  • 1.3 Stakeholder Analysis Matrix


2.0 Planning Process Group:

  • 2.1 Probability distribution project Management Plan
  • 2.2 Scope Management Plan
  • 2.3 Requirements Management Plan
  • 2.4 Requirements Documentation
  • 2.5 Requirements Traceability Matrix
  • 2.6 Probability distribution project Scope Statement
  • 2.7 Assumption and Constraint Log
  • 2.8 Work Breakdown Structure
  • 2.9 WBS Dictionary
  • 2.10 Schedule Management Plan
  • 2.11 Activity List
  • 2.12 Activity Attributes
  • 2.13 Milestone List
  • 2.14 Network Diagram
  • 2.15 Activity Resource Requirements
  • 2.16 Resource Breakdown Structure
  • 2.17 Activity Duration Estimates
  • 2.18 Duration Estimating Worksheet
  • 2.19 Probability distribution project Schedule
  • 2.20 Cost Management Plan
  • 2.21 Activity Cost Estimates
  • 2.22 Cost Estimating Worksheet
  • 2.23 Cost Baseline
  • 2.24 Quality Management Plan
  • 2.25 Quality Metrics
  • 2.26 Process Improvement Plan
  • 2.27 Responsibility Assignment Matrix
  • 2.28 Roles and Responsibilities
  • 2.29 Human Resource Management Plan
  • 2.30 Communications Management Plan
  • 2.31 Risk Management Plan
  • 2.32 Risk Register
  • 2.33 Probability and Impact Assessment
  • 2.34 Probability and Impact Matrix
  • 2.35 Risk Data Sheet
  • 2.36 Procurement Management Plan
  • 2.37 Source Selection Criteria
  • 2.38 Stakeholder Management Plan
  • 2.39 Change Management Plan


3.0 Executing Process Group:

  • 3.1 Team Member Status Report
  • 3.2 Change Request
  • 3.3 Change Log
  • 3.4 Decision Log
  • 3.5 Quality Audit
  • 3.6 Team Directory
  • 3.7 Team Operating Agreement
  • 3.8 Team Performance Assessment
  • 3.9 Team Member Performance Assessment
  • 3.10 Issue Log


4.0 Monitoring and Controlling Process Group:

  • 4.1 Probability distribution project Performance Report
  • 4.2 Variance Analysis
  • 4.3 Earned Value Status
  • 4.4 Risk Audit
  • 4.5 Contractor Status Report
  • 4.6 Formal Acceptance


5.0 Closing Process Group:

  • 5.1 Procurement Audit
  • 5.2 Contract Close-Out
  • 5.3 Probability distribution project or Phase Close-Out
  • 5.4 Lessons Learned

 

Results

With this Three Step process you will have all the tools you need for any Probability distribution project with this in-depth Probability distribution Toolkit.

In using the Toolkit you will be better able to:

  • Diagnose Probability distribution projects, initiatives, organizations, businesses and processes using accepted diagnostic standards and practices
  • Implement evidence-based best practice strategies aligned with overall goals
  • Integrate recent advances in Probability distribution and put process design strategies into practice according to best practice guidelines

Defining, designing, creating, and implementing a process to solve a business challenge or meet a business objective is the most valuable role; In EVERY company, organization and department.

Unless you are talking a one-time, single-use project within a business, there should be a process. Whether that process is managed and implemented by humans, AI, or a combination of the two, it needs to be designed by someone with a complex enough perspective to ask the right questions. Someone capable of asking the right questions and step back and say, 'What are we really trying to accomplish here? And is there a different way to look at it?'

This Toolkit empowers people to do just that - whether their title is entrepreneur, manager, consultant, (Vice-)President, CxO etc... - they are the people who rule the future. They are the person who asks the right questions to make Probability distribution investments work better.

This Probability distribution All-Inclusive Toolkit enables You to be that person.

 

Includes lifetime updates

Every self assessment comes with Lifetime Updates and Lifetime Free Updated Books. Lifetime Updates is an industry-first feature which allows you to receive verified self assessment updates, ensuring you always have the most accurate information at your fingertips.

46 Reviews Hide Reviews Show Reviews

  • 5
    Thank you for this achievement.

    Posted by IFMA on 5th Sep 2018

    IFMA International Facility Management Association

  • 5
    The subject is new to me and am sure the resources along with suggested methodology would help me in my pursuit.

    Posted by Ravi P. on 4th Sep 2018

    Ravi P. Senior Consultant Big 5

  • 5
    Spot on, thank you. Will study your book to help my clients.

    Posted by WALTER H. on 4th Sep 2018

    WALTER H. Business Coach

  • 5
    cake.hr

    Posted by cake.hr on 4th Sep 2018

    The Verdict: The Complete Self-Assessment package ticks a lot of checkboxes, especially for businesses testing the waters for decision making and performance enhancement and for companies that can not have a full-time professional on payroll to guide the initial implementation of their drive.

  • 5
    MARIETTA W. Senior Consultant

    Posted by MARIETTA W. on 4th Sep 2018

    Standard Requirements is a straightforward guide. It is a tool to help develop a detailed vision of all areas impacted by an implementation, and a useful tool for scoring readiness and implementation quality.

  • 5
    Awesome!!!!!!

    Posted by JOHN G. on 3rd Sep 2018

    JOHN G. Principal Consultant

  • 5
    Awesome, thank you so much!!

    Posted by ZORAN M. on 5th Aug 2018

    ZORAN M. Knowledge Management Consultant

  • 5
    Just looked at the files. Impressive. Well done. I am learning.

    Posted by MARTIN B. on 5th Aug 2018

    MARTIN B. Risks and Compliance, Vulnerability and Security Testing, Threat Detection and Response, Managed Security Services.

  • 5
    Thank you. I would very much like to read your publication and share my views on our blog to reach our English and Spanish customers.

    Posted by James S. on 5th Aug 2018

    James S. Account Manager