Reactive extensions Toolkit: best-practice templates, step-by-step work plans and maturity diagnostics

£205.40
(46 reviews) Write a Review
Availability:
Downloadable Resources, Instant Access

Save time, empower your teams and effectively upgrade your processes with access to this practical Reactive extensions Toolkit and guide. Address common challenges with best-practice templates, step-by-step work plans and maturity diagnostics for any Reactive extensions related project.

Download the Toolkit and in Three Steps you will be guided from idea to implementation results.

The Toolkit contains the following practical and powerful enablers with new and updated Reactive extensions specific requirements:


STEP 1: Get your bearings

Start with...

  • The latest quick edition of the Reactive extensions Self Assessment book in PDF containing 49 requirements to perform a quickscan, get an overview and share with stakeholders.

Organized in a data driven improvement cycle RDMAICS (Recognize, Define, Measure, Analyze, Improve, Control and Sustain), check the…

  • Example pre-filled Self-Assessment Excel Dashboard to get familiar with results generation

Then find your goals...


STEP 2: Set concrete goals, tasks, dates and numbers you can track

Featuring new and updated case-based questions, organized into seven core areas of process design, this Self-Assessment will help you identify areas in which Reactive extensions improvements can be made.

Examples; 10 of the standard requirements:

  1. What successful thing are we doing today that may be blinding us to new growth opportunities?

  2. Can Management personnel recognize the monetary benefit of Reactive extensions?

  3. When information truly is ubiquitous, when reach and connectivity are completely global, when computing resources are infinite, and when a whole new set of impossibilities are not only possible, but happening, what will that do to our business?

  4. Will We Aggregate Measures across Priorities?

  5. Have the problem and goal statements been updated to reflect the additional knowledge gained from the analyze phase?

  6. Is maximizing Reactive extensions protection the same as minimizing Reactive extensions loss?

  7. How do we link Measurement and Risk?

  8. Is the Reactive extensions process severely broken such that a re-design is necessary?

  9. Who will be in control?

  10. What is your theory of human motivation, and how does your compensation plan fit with that view?


Complete the self assessment, on your own or with a team in a workshop setting. Use the workbook together with the self assessment requirements spreadsheet:

  • The workbook is the latest in-depth complete edition of the Reactive extensions book in PDF containing requirements, which criteria correspond to the criteria in...

Your Reactive extensions self-assessment dashboard which gives you your dynamically prioritized projects-ready tool and shows your organization exactly what to do next:

  • The Self-Assessment Excel Dashboard; with the Reactive extensions Self-Assessment and Scorecard you will develop a clear picture of which Reactive extensions areas need attention, which requirements you should focus on and who will be responsible for them:

    • Shows your organization instant insight in areas for improvement: Auto generates reports, radar chart for maturity assessment, insights per process and participant and bespoke, ready to use, RACI Matrix
    • Gives you a professional Dashboard to guide and perform a thorough Reactive extensions Self-Assessment
    • Is secure: Ensures offline data protection of your Self-Assessment results
    • Dynamically prioritized projects-ready RACI Matrix shows your organization exactly what to do next:

 

STEP 3: Implement, Track, follow up and revise strategy

The outcomes of STEP 2, the self assessment, are the inputs for STEP 3; Start and manage Reactive extensions projects with the 62 implementation resources:

  • 62 step-by-step Reactive extensions Project Management Form Templates covering over 6000 Reactive extensions project requirements and success criteria:

Examples; 10 of the check box criteria:

  1. WBS Dictionary: Is the anticipated (firm and potential) business base Reactive extensions projected in a rational, consistent manner?

  2. Executing Process Group: What were things that you did well, but could improve, and how?

  3. Probability and Impact Matrix: Pay attention to the quality of the plans: is the content complete, or does it seem to be lacking detail?

  4. Cost Management Plan: Forecasts Ð How will the time and resources needed to complete the Reactive extensions project be forecast?

  5. Planning Process Group: Have more efficient (sensitive) and appropriate measures been adopted to respond to the political and socio-cultural problems identified?

  6. Stakeholder Analysis Matrix: How to measure the achievement of the Development Objective?

  7. Probability and Impact Matrix: Is the delay in one subReactive extensions project going to affect another?

  8. Lessons Learned: What would you like to see better documented about how to use existing processes on this type of Reactive extensions project?

  9. Initiating Process Group: How well did the chosen processes produce the expected results?

  10. Risk Register: What could prevent us delivering on the strategic program objectives and what is being done to mitigate such issues?

 
Step-by-step and complete Reactive extensions Project Management Forms and Templates including check box criteria and templates.

1.0 Initiating Process Group:

  • 1.1 Reactive extensions project Charter
  • 1.2 Stakeholder Register
  • 1.3 Stakeholder Analysis Matrix


2.0 Planning Process Group:

  • 2.1 Reactive extensions project Management Plan
  • 2.2 Scope Management Plan
  • 2.3 Requirements Management Plan
  • 2.4 Requirements Documentation
  • 2.5 Requirements Traceability Matrix
  • 2.6 Reactive extensions project Scope Statement
  • 2.7 Assumption and Constraint Log
  • 2.8 Work Breakdown Structure
  • 2.9 WBS Dictionary
  • 2.10 Schedule Management Plan
  • 2.11 Activity List
  • 2.12 Activity Attributes
  • 2.13 Milestone List
  • 2.14 Network Diagram
  • 2.15 Activity Resource Requirements
  • 2.16 Resource Breakdown Structure
  • 2.17 Activity Duration Estimates
  • 2.18 Duration Estimating Worksheet
  • 2.19 Reactive extensions project Schedule
  • 2.20 Cost Management Plan
  • 2.21 Activity Cost Estimates
  • 2.22 Cost Estimating Worksheet
  • 2.23 Cost Baseline
  • 2.24 Quality Management Plan
  • 2.25 Quality Metrics
  • 2.26 Process Improvement Plan
  • 2.27 Responsibility Assignment Matrix
  • 2.28 Roles and Responsibilities
  • 2.29 Human Resource Management Plan
  • 2.30 Communications Management Plan
  • 2.31 Risk Management Plan
  • 2.32 Risk Register
  • 2.33 Probability and Impact Assessment
  • 2.34 Probability and Impact Matrix
  • 2.35 Risk Data Sheet
  • 2.36 Procurement Management Plan
  • 2.37 Source Selection Criteria
  • 2.38 Stakeholder Management Plan
  • 2.39 Change Management Plan


3.0 Executing Process Group:

  • 3.1 Team Member Status Report
  • 3.2 Change Request
  • 3.3 Change Log
  • 3.4 Decision Log
  • 3.5 Quality Audit
  • 3.6 Team Directory
  • 3.7 Team Operating Agreement
  • 3.8 Team Performance Assessment
  • 3.9 Team Member Performance Assessment
  • 3.10 Issue Log


4.0 Monitoring and Controlling Process Group:

  • 4.1 Reactive extensions project Performance Report
  • 4.2 Variance Analysis
  • 4.3 Earned Value Status
  • 4.4 Risk Audit
  • 4.5 Contractor Status Report
  • 4.6 Formal Acceptance


5.0 Closing Process Group:

  • 5.1 Procurement Audit
  • 5.2 Contract Close-Out
  • 5.3 Reactive extensions project or Phase Close-Out
  • 5.4 Lessons Learned

 

Results

With this Three Step process you will have all the tools you need for any Reactive extensions project with this in-depth Reactive extensions Toolkit.

In using the Toolkit you will be better able to:

  • Diagnose Reactive extensions projects, initiatives, organizations, businesses and processes using accepted diagnostic standards and practices
  • Implement evidence-based best practice strategies aligned with overall goals
  • Integrate recent advances in Reactive extensions and put process design strategies into practice according to best practice guidelines

Defining, designing, creating, and implementing a process to solve a business challenge or meet a business objective is the most valuable role; In EVERY company, organization and department.

Unless you are talking a one-time, single-use project within a business, there should be a process. Whether that process is managed and implemented by humans, AI, or a combination of the two, it needs to be designed by someone with a complex enough perspective to ask the right questions. Someone capable of asking the right questions and step back and say, 'What are we really trying to accomplish here? And is there a different way to look at it?'

This Toolkit empowers people to do just that - whether their title is entrepreneur, manager, consultant, (Vice-)President, CxO etc... - they are the people who rule the future. They are the person who asks the right questions to make Reactive extensions investments work better.

This Reactive extensions All-Inclusive Toolkit enables You to be that person.

 

Includes lifetime updates

Every self assessment comes with Lifetime Updates and Lifetime Free Updated Books. Lifetime Updates is an industry-first feature which allows you to receive verified self assessment updates, ensuring you always have the most accurate information at your fingertips.

46 Reviews Hide Reviews Show Reviews

  • 5
    Thank you, these are great!

    Posted by NATALIE F. on 6th Sep 2018

    NATALIE F. Healthcare Information Technology Consultant

  • 5
    Seems quite handy - going to start using it next month as we're investing quite a lot in it. This will define for us what to do in this space and solve a real problem (rather than chasing shiny objects).

    Posted by DAVIN B. on 5th Sep 2018

    DAVIN B. Systems Manager

  • 5
    This is awesome. Thank you very much.

    Posted by Dr. Martin K. on 4th Sep 2018

    Dr. Martin K. CEO

  • 5
    I look forward to becoming more familiar with the material and conducting the survey with my employer. So far it looks very comprehensive. Thank you.

    Posted by RON F. on 3rd Sep 2018

    RON F. Director Analytics Governance

  • 5
    The subject is new to me and am sure the resources along with suggested methodology would help me in my pursuit.

    Posted by Ravi P. on 2nd Sep 2018

    Ravi P. Senior Consultant Big 5

  • 5
    It is a pleasure to know about new tools to improve our performance. Let me congratulate to you about your new achievement.

    Posted by Marta C. on 6th Aug 2018

    MARTA C., Cybersecurity and Antifraud Consultant

  • 5
    I have gone through the array of your works and they are simply awesome! Great job you have been doing.

    Posted by KENNETH O. on 5th Aug 2018

    KENNETH O. MD/CEO, Emerging Media

  • 5
    This is great! Thank you. Say, do you all do consulting or certification?

    Posted by KEN W. on 2nd Aug 2018

    KEN W. Managing Director

  • 5
    Your book is interesting and contains timely topics.

    Posted by Dianne L. on 2nd Aug 2018

    DIANNE L Chief Learning Officer