Software container Toolkit: best-practice templates, step-by-step work plans and maturity diagnostics

CNY1,779.93
(46 reviews) Write a Review
Availability:
Downloadable Resources, Instant Access

Save time, empower your teams and effectively upgrade your processes with access to this practical Software container Toolkit and guide. Address common challenges with best-practice templates, step-by-step work plans and maturity diagnostics for any Software container related project.

Download the Toolkit and in Three Steps you will be guided from idea to implementation results.

The Toolkit contains the following practical and powerful enablers with new and updated Software container specific requirements:


STEP 1: Get your bearings

Start with...

  • The latest quick edition of the Software container Self Assessment book in PDF containing 49 requirements to perform a quickscan, get an overview and share with stakeholders.

Organized in a data driven improvement cycle RDMAICS (Recognize, Define, Measure, Analyze, Improve, Control and Sustain), check the…

  • Example pre-filled Self-Assessment Excel Dashboard to get familiar with results generation

Then find your goals...


STEP 2: Set concrete goals, tasks, dates and numbers you can track

Featuring 694 new and updated case-based questions, organized into seven core areas of process design, this Self-Assessment will help you identify areas in which Software container improvements can be made.

Examples; 10 of the 694 standard requirements:

  1. What are your current levels and trends in key Software container measures or indicators of product and process performance that are important to and directly serve your customers?

  2. Do you keep 50% of your time unscheduled?

  3. Is there a Software container Communication plan covering who needs to get what information when?

  4. Strategic planning -Software container relations

  5. What is the minimum educational requirement for potential new hires?

  6. What are we challenging, in the sense that Mac challenged the PC or Dove tackled the Beauty Myth?

  7. Is the scope of Software container defined?

  8. Which Stakeholder Characteristics Are Analyzed?

  9. What else needs to be measured?

  10. What will be measured?


Complete the self assessment, on your own or with a team in a workshop setting. Use the workbook together with the self assessment requirements spreadsheet:

  • The workbook is the latest in-depth complete edition of the Software container book in PDF containing 694 requirements, which criteria correspond to the criteria in...

Your Software container self-assessment dashboard which gives you your dynamically prioritized projects-ready tool and shows your organization exactly what to do next:

  • The Self-Assessment Excel Dashboard; with the Software container Self-Assessment and Scorecard you will develop a clear picture of which Software container areas need attention, which requirements you should focus on and who will be responsible for them:

    • Shows your organization instant insight in areas for improvement: Auto generates reports, radar chart for maturity assessment, insights per process and participant and bespoke, ready to use, RACI Matrix
    • Gives you a professional Dashboard to guide and perform a thorough Software container Self-Assessment
    • Is secure: Ensures offline data protection of your Self-Assessment results
    • Dynamically prioritized projects-ready RACI Matrix shows your organization exactly what to do next:

 

STEP 3: Implement, Track, follow up and revise strategy

The outcomes of STEP 2, the self assessment, are the inputs for STEP 3; Start and manage Software container projects with the 62 implementation resources:

  • 62 step-by-step Software container Project Management Form Templates covering over 6000 Software container project requirements and success criteria:

Examples; 10 of the check box criteria:

  1. Scope Management Plan: Quality Standards - Are controls in place to ensure that the work was not only completed but also completed to meet specific standards?

  2. Cost Management Plan: Was your organizations estimating methodology being used and followed?

  3. Human Resource Management Plan: Does the schedule include Software container project management time and change request analysis time?

  4. Team Operating Agreement: How do you want to be thought of and known within the organization?

  5. Procurement Audit: Are outsourcing and Public Private Partnerships considered as alternatives to in-house work?

  6. Requirements Management Plan: Controlling Software container project requirements involves monitoring the status of the Software container project requirements and managing changes to the requirements. Who is responsible for monitoring and tracking the Software container project requirements?

  7. Project Portfolio management: Why is implementation of resource portfolio management recommended in the last stage?

  8. Activity Duration Estimates: Is there anything planned that doesn t need to be here?

  9. Team Operating Agreement: Do you post any action items, due dates, and responsibilities on the team website?

  10. Procurement Audit: Are idle funds invested, and is interest distributed to the various activity accounts at least annually?

 
Step-by-step and complete Software container Project Management Forms and Templates including check box criteria and templates.

1.0 Initiating Process Group:

  • 1.1 Software container project Charter
  • 1.2 Stakeholder Register
  • 1.3 Stakeholder Analysis Matrix


2.0 Planning Process Group:

  • 2.1 Software container project Management Plan
  • 2.2 Scope Management Plan
  • 2.3 Requirements Management Plan
  • 2.4 Requirements Documentation
  • 2.5 Requirements Traceability Matrix
  • 2.6 Software container project Scope Statement
  • 2.7 Assumption and Constraint Log
  • 2.8 Work Breakdown Structure
  • 2.9 WBS Dictionary
  • 2.10 Schedule Management Plan
  • 2.11 Activity List
  • 2.12 Activity Attributes
  • 2.13 Milestone List
  • 2.14 Network Diagram
  • 2.15 Activity Resource Requirements
  • 2.16 Resource Breakdown Structure
  • 2.17 Activity Duration Estimates
  • 2.18 Duration Estimating Worksheet
  • 2.19 Software container project Schedule
  • 2.20 Cost Management Plan
  • 2.21 Activity Cost Estimates
  • 2.22 Cost Estimating Worksheet
  • 2.23 Cost Baseline
  • 2.24 Quality Management Plan
  • 2.25 Quality Metrics
  • 2.26 Process Improvement Plan
  • 2.27 Responsibility Assignment Matrix
  • 2.28 Roles and Responsibilities
  • 2.29 Human Resource Management Plan
  • 2.30 Communications Management Plan
  • 2.31 Risk Management Plan
  • 2.32 Risk Register
  • 2.33 Probability and Impact Assessment
  • 2.34 Probability and Impact Matrix
  • 2.35 Risk Data Sheet
  • 2.36 Procurement Management Plan
  • 2.37 Source Selection Criteria
  • 2.38 Stakeholder Management Plan
  • 2.39 Change Management Plan


3.0 Executing Process Group:

  • 3.1 Team Member Status Report
  • 3.2 Change Request
  • 3.3 Change Log
  • 3.4 Decision Log
  • 3.5 Quality Audit
  • 3.6 Team Directory
  • 3.7 Team Operating Agreement
  • 3.8 Team Performance Assessment
  • 3.9 Team Member Performance Assessment
  • 3.10 Issue Log


4.0 Monitoring and Controlling Process Group:

  • 4.1 Software container project Performance Report
  • 4.2 Variance Analysis
  • 4.3 Earned Value Status
  • 4.4 Risk Audit
  • 4.5 Contractor Status Report
  • 4.6 Formal Acceptance


5.0 Closing Process Group:

  • 5.1 Procurement Audit
  • 5.2 Contract Close-Out
  • 5.3 Software container project or Phase Close-Out
  • 5.4 Lessons Learned

 

Results

With this Three Step process you will have all the tools you need for any Software container project with this in-depth Software container Toolkit.

In using the Toolkit you will be better able to:

  • Diagnose Software container projects, initiatives, organizations, businesses and processes using accepted diagnostic standards and practices
  • Implement evidence-based best practice strategies aligned with overall goals
  • Integrate recent advances in Software container and put process design strategies into practice according to best practice guidelines

Defining, designing, creating, and implementing a process to solve a business challenge or meet a business objective is the most valuable role; In EVERY company, organization and department.

Unless you are talking a one-time, single-use project within a business, there should be a process. Whether that process is managed and implemented by humans, AI, or a combination of the two, it needs to be designed by someone with a complex enough perspective to ask the right questions. Someone capable of asking the right questions and step back and say, 'What are we really trying to accomplish here? And is there a different way to look at it?'

This Toolkit empowers people to do just that - whether their title is entrepreneur, manager, consultant, (Vice-)President, CxO etc... - they are the people who rule the future. They are the person who asks the right questions to make Software container investments work better.

This Software container All-Inclusive Toolkit enables You to be that person.

 

Includes lifetime updates

Every self assessment comes with Lifetime Updates and Lifetime Free Updated Books. Lifetime Updates is an industry-first feature which allows you to receive verified self assessment updates, ensuring you always have the most accurate information at your fingertips.

46 Reviews Hide Reviews Show Reviews

  • 5
    Thanks for this; a lot of work has gone into developing and producing this, I am looking forward to using it in the coming weeks.

    Posted by DR STEVEN.B. on 5th Sep 2018

    DR STEVEN.B. Head of Information Security & Assurance

  • 5
    Thank you, this is perfect - I will certainly be recommending Self Assessment dashboards to all - I can not wait to tell my colleagues on Monday.

    Posted by MEL F. on 5th Sep 2018

    MEL F. Change Management Professional

  • 5
    Your book is interesting and contains timely topics.

    Posted by Dianne L. on 5th Sep 2018

    DIANNE L Chief Learning Officer

  • 5
    Congrats! Very cool!

    Posted by Caryn B. on 5th Sep 2018

    Caryn B. Vice President Production

  • 5
    This is awesome. Thank you very much.

    Posted by Dr. Martin K. on 4th Sep 2018

    Dr. Martin K. CEO

  • 5
    Awesome!!!!!!

    Posted by JOHN G. on 3rd Sep 2018

    JOHN G. Principal Consultant

  • 5
    I have been looking at the document, and it is quite extensive.

    Posted by PENGILLY W. on 2nd Sep 2018

    PENGILLY W. Director IT & Logistics at a leading University

  • 5
    It is a pleasure to know about new tools to improve our performance. Let me congratulate to you about your new achievement.

    Posted by Marta C. on 2nd Sep 2018

    MARTA C., Cybersecurity and Antifraud Consultant

  • 5
    The Self-Assessment is a great tool to gather feedback and input from others, especially challenges, and things to watch out for. Very helpful!

    Posted by JULIE M. on 5th Aug 2018

    JULIE M. AWS Solution Architect