Spacecraft Tracking and Data Acquisition Network Toolkit: best-practice templates, step-by-step work plans and maturity diagnostics

$249.00
(46 reviews) Write a Review
Availability:
Downloadable Resources, Instant Access

Save time, empower your teams and effectively upgrade your processes with access to this practical Spacecraft Tracking and Data Acquisition Network Toolkit and guide. Address common challenges with best-practice templates, step-by-step work plans and maturity diagnostics for any Spacecraft Tracking and Data Acquisition Network related project.

Download the Toolkit and in Three Steps you will be guided from idea to implementation results.

The Toolkit contains the following practical and powerful enablers with new and updated Spacecraft Tracking and Data Acquisition Network specific requirements:


STEP 1: Get your bearings

Start with...

  • The latest quick edition of the Spacecraft Tracking and Data Acquisition Network Self Assessment book in PDF containing 49 requirements to perform a quickscan, get an overview and share with stakeholders.

Organized in a data driven improvement cycle RDMAICS (Recognize, Define, Measure, Analyze, Improve, Control and Sustain), check the…

  • Example pre-filled Self-Assessment Excel Dashboard to get familiar with results generation

Then find your goals...


STEP 2: Set concrete goals, tasks, dates and numbers you can track

Featuring 713 new and updated case-based questions, organized into seven core areas of process design, this Self-Assessment will help you identify areas in which Spacecraft Tracking and Data Acquisition Network improvements can be made.

Examples; 10 of the 713 standard requirements:

  1. Strategic planning -Spacecraft Tracking and Data Acquisition Network relations

  2. If our company went out of business tomorrow, would anyone who doesnt get a paycheck here care?

  3. Is Spacecraft Tracking and Data Acquisition Network linked to key stakeholder goals and objectives?

  4. When information truly is ubiquitous, when reach and connectivity are completely global, when computing resources are infinite, and when a whole new set of impossibilities are not only possible, but happening, what will that do to our business?

  5. Is data collected and displayed to better understand customer(s) critical needs and requirements.

  6. Why do we need to keep records?

  7. Consider your own Spacecraft Tracking and Data Acquisition Network project. what types of organizational problems do you think might be causing or affecting your problem, based on the work done so far?

  8. Is it economical; do we have the time and money?

  9. Does Spacecraft Tracking and Data Acquisition Network analysis isolate the fundamental causes of problems?

  10. What threat is Spacecraft Tracking and Data Acquisition Network addressing?


Complete the self assessment, on your own or with a team in a workshop setting. Use the workbook together with the self assessment requirements spreadsheet:

  • The workbook is the latest in-depth complete edition of the Spacecraft Tracking and Data Acquisition Network book in PDF containing 713 requirements, which criteria correspond to the criteria in...

Your Spacecraft Tracking and Data Acquisition Network self-assessment dashboard which gives you your dynamically prioritized projects-ready tool and shows your organization exactly what to do next:

  • The Self-Assessment Excel Dashboard; with the Spacecraft Tracking and Data Acquisition Network Self-Assessment and Scorecard you will develop a clear picture of which Spacecraft Tracking and Data Acquisition Network areas need attention, which requirements you should focus on and who will be responsible for them:

    • Shows your organization instant insight in areas for improvement: Auto generates reports, radar chart for maturity assessment, insights per process and participant and bespoke, ready to use, RACI Matrix
    • Gives you a professional Dashboard to guide and perform a thorough Spacecraft Tracking and Data Acquisition Network Self-Assessment
    • Is secure: Ensures offline data protection of your Self-Assessment results
    • Dynamically prioritized projects-ready RACI Matrix shows your organization exactly what to do next:

 

STEP 3: Implement, Track, follow up and revise strategy

The outcomes of STEP 2, the self assessment, are the inputs for STEP 3; Start and manage Spacecraft Tracking and Data Acquisition Network projects with the 62 implementation resources:

  • 62 step-by-step Spacecraft Tracking and Data Acquisition Network Project Management Form Templates covering over 6000 Spacecraft Tracking and Data Acquisition Network project requirements and success criteria:

Examples; 10 of the check box criteria:

  1. Activity Duration Estimates: Do scope statements include the Spacecraft Tracking and Data Acquisition Network project objectives and expected deliverables?

  2. Assumption and Constraint Log: Security analysis has access to information that is sanitized?

  3. Risk Data Sheet: Is the data sufficiently specified in terms of the type of failure being analysed, and its frequency or probability?

  4. Probability and Impact Matrix: Are staff committed for the duration of the Spacecraft Tracking and Data Acquisition Network project?

  5. Project or Phase Close-Out: What were the goals and objectives of the communications strategy for the Spacecraft Tracking and Data Acquisition Network project?

  6. Procurement Management Plan: Were Spacecraft Tracking and Data Acquisition Network project team members involved in detailed estimating and scheduling?

  7. Source Selection Criteria: How should the preproposal conference be conducted?

  8. Procurement Audit: How do you assess whether the technical and financial evaluation was done properly and in fair manner?

  9. Contractor Status Report: If applicable; describe your standard schedule for new software version releases. Are new software version releases included in the standard maintenance plan?

  10. Probability and Impact Matrix: Management -what contingency plans do you have if the risk becomes a reality?

 
Step-by-step and complete Spacecraft Tracking and Data Acquisition Network Project Management Forms and Templates including check box criteria and templates.

1.0 Initiating Process Group:

  • 1.1 Spacecraft Tracking and Data Acquisition Network project Charter
  • 1.2 Stakeholder Register
  • 1.3 Stakeholder Analysis Matrix


2.0 Planning Process Group:

  • 2.1 Spacecraft Tracking and Data Acquisition Network project Management Plan
  • 2.2 Scope Management Plan
  • 2.3 Requirements Management Plan
  • 2.4 Requirements Documentation
  • 2.5 Requirements Traceability Matrix
  • 2.6 Spacecraft Tracking and Data Acquisition Network project Scope Statement
  • 2.7 Assumption and Constraint Log
  • 2.8 Work Breakdown Structure
  • 2.9 WBS Dictionary
  • 2.10 Schedule Management Plan
  • 2.11 Activity List
  • 2.12 Activity Attributes
  • 2.13 Milestone List
  • 2.14 Network Diagram
  • 2.15 Activity Resource Requirements
  • 2.16 Resource Breakdown Structure
  • 2.17 Activity Duration Estimates
  • 2.18 Duration Estimating Worksheet
  • 2.19 Spacecraft Tracking and Data Acquisition Network project Schedule
  • 2.20 Cost Management Plan
  • 2.21 Activity Cost Estimates
  • 2.22 Cost Estimating Worksheet
  • 2.23 Cost Baseline
  • 2.24 Quality Management Plan
  • 2.25 Quality Metrics
  • 2.26 Process Improvement Plan
  • 2.27 Responsibility Assignment Matrix
  • 2.28 Roles and Responsibilities
  • 2.29 Human Resource Management Plan
  • 2.30 Communications Management Plan
  • 2.31 Risk Management Plan
  • 2.32 Risk Register
  • 2.33 Probability and Impact Assessment
  • 2.34 Probability and Impact Matrix
  • 2.35 Risk Data Sheet
  • 2.36 Procurement Management Plan
  • 2.37 Source Selection Criteria
  • 2.38 Stakeholder Management Plan
  • 2.39 Change Management Plan


3.0 Executing Process Group:

  • 3.1 Team Member Status Report
  • 3.2 Change Request
  • 3.3 Change Log
  • 3.4 Decision Log
  • 3.5 Quality Audit
  • 3.6 Team Directory
  • 3.7 Team Operating Agreement
  • 3.8 Team Performance Assessment
  • 3.9 Team Member Performance Assessment
  • 3.10 Issue Log


4.0 Monitoring and Controlling Process Group:

  • 4.1 Spacecraft Tracking and Data Acquisition Network project Performance Report
  • 4.2 Variance Analysis
  • 4.3 Earned Value Status
  • 4.4 Risk Audit
  • 4.5 Contractor Status Report
  • 4.6 Formal Acceptance


5.0 Closing Process Group:

  • 5.1 Procurement Audit
  • 5.2 Contract Close-Out
  • 5.3 Spacecraft Tracking and Data Acquisition Network project or Phase Close-Out
  • 5.4 Lessons Learned

 

Results

With this Three Step process you will have all the tools you need for any Spacecraft Tracking and Data Acquisition Network project with this in-depth Spacecraft Tracking and Data Acquisition Network Toolkit.

In using the Toolkit you will be better able to:

  • Diagnose Spacecraft Tracking and Data Acquisition Network projects, initiatives, organizations, businesses and processes using accepted diagnostic standards and practices
  • Implement evidence-based best practice strategies aligned with overall goals
  • Integrate recent advances in Spacecraft Tracking and Data Acquisition Network and put process design strategies into practice according to best practice guidelines

Defining, designing, creating, and implementing a process to solve a business challenge or meet a business objective is the most valuable role; In EVERY company, organization and department.

Unless you are talking a one-time, single-use project within a business, there should be a process. Whether that process is managed and implemented by humans, AI, or a combination of the two, it needs to be designed by someone with a complex enough perspective to ask the right questions. Someone capable of asking the right questions and step back and say, 'What are we really trying to accomplish here? And is there a different way to look at it?'

This Toolkit empowers people to do just that - whether their title is entrepreneur, manager, consultant, (Vice-)President, CxO etc... - they are the people who rule the future. They are the person who asks the right questions to make Spacecraft Tracking and Data Acquisition Network investments work better.

This Spacecraft Tracking and Data Acquisition Network All-Inclusive Toolkit enables You to be that person.

 

Includes lifetime updates

Every self assessment comes with Lifetime Updates and Lifetime Free Updated Books. Lifetime Updates is an industry-first feature which allows you to receive verified self assessment updates, ensuring you always have the most accurate information at your fingertips.

46 Reviews Hide Reviews Show Reviews

  • 5
    Awesome!!!!!!

    Posted by JOHN G. on 3rd Sep 2018

    JOHN G. Principal Consultant

  • 5
    Thank you! I have found a lot of great information in the text so far. I plan to use your book as one of our references as we build out our SDDC and gladly leave an online review.

    Posted by CRAIG T. on 3rd Sep 2018

    CRAIG T. Chief Technology Officer

  • 5
    Just looked at the files. Impressive. Well done. I am learning.

    Posted by MARTIN B. on 3rd Sep 2018

    MARTIN B. Risks and Compliance, Vulnerability and Security Testing, Threat Detection and Response, Managed Security Services.

  • 5
    The subject is new to me and am sure the resources along with suggested methodology would help me in my pursuit.

    Posted by Ravi P. on 2nd Sep 2018

    Ravi P. Senior Consultant Big 5

  • 5
    I have gone through the array of your works and they are simply awesome! Great job you have been doing.

    Posted by KENNETH O. on 5th Aug 2018

    KENNETH O. MD/CEO, Emerging Media

  • 5
    It is a pleasure to know about new tools to improve our performance. Let me congratulate to you about your new achievement.

    Posted by Marta C. on 2nd Aug 2018

    MARTA C., Cybersecurity and Antifraud Consultant

  • 5
    I have been looking at the document, and it is quite extensive.

    Posted by PENGILLY W. on 2nd Aug 2018

    PENGILLY W. Director IT & Logistics at a leading University

  • 5
    Congrats! Very cool!

    Posted by Caryn B. on 5th Jul 2018

    Caryn B. Vice President Production

  • 5
    This is great! Thank you. Say, do you all do consulting or certification?

    Posted by KEN W. on 5th Jul 2018

    KEN W. Managing Director