Strategic Automated Command and Control System Toolkit: best-practice templates, step-by-step work plans and maturity diagnostics

RUB16,100.51
(46 reviews) Write a Review
Availability:
Downloadable Resources, Instant Access

Save time, empower your teams and effectively upgrade your processes with access to this practical Strategic Automated Command and Control System Toolkit and guide. Address common challenges with best-practice templates, step-by-step work plans and maturity diagnostics for any Strategic Automated Command and Control System related project.

Download the Toolkit and in Three Steps you will be guided from idea to implementation results.

The Toolkit contains the following practical and powerful enablers with new and updated Strategic Automated Command and Control System specific requirements:


STEP 1: Get your bearings

Start with...

  • The latest quick edition of the Strategic Automated Command and Control System Self Assessment book in PDF containing 49 requirements to perform a quickscan, get an overview and share with stakeholders.

Organized in a data driven improvement cycle RDMAICS (Recognize, Define, Measure, Analyze, Improve, Control and Sustain), check the…

  • Example pre-filled Self-Assessment Excel Dashboard to get familiar with results generation

Then find your goals...


STEP 2: Set concrete goals, tasks, dates and numbers you can track

Featuring 717 new and updated case-based questions, organized into seven core areas of process design, this Self-Assessment will help you identify areas in which Strategic Automated Command and Control System improvements can be made.

Examples; 10 of the 717 standard requirements:

  1. Were the planned controls working?

  2. Do those selected for the Strategic Automated Command and Control System team have a good general understanding of what Strategic Automated Command and Control System is all about?

  3. How can we best use all of our knowledge repositories to enhance learning and sharing?

  4. What is our formula for success in Strategic Automated Command and Control System ?

  5. Do we think we know, or do we know we know ?

  6. How do we improve productivity?

  7. Where is it measured?

  8. What quality tools were useful in the control phase?

  9. Can we add value to the current Strategic Automated Command and Control System decision-making process (largely qualitative) by incorporating uncertainty modeling (more quantitative)?

  10. Are we changing as fast as the world around us?


Complete the self assessment, on your own or with a team in a workshop setting. Use the workbook together with the self assessment requirements spreadsheet:

  • The workbook is the latest in-depth complete edition of the Strategic Automated Command and Control System book in PDF containing 717 requirements, which criteria correspond to the criteria in...

Your Strategic Automated Command and Control System self-assessment dashboard which gives you your dynamically prioritized projects-ready tool and shows your organization exactly what to do next:

  • The Self-Assessment Excel Dashboard; with the Strategic Automated Command and Control System Self-Assessment and Scorecard you will develop a clear picture of which Strategic Automated Command and Control System areas need attention, which requirements you should focus on and who will be responsible for them:

    • Shows your organization instant insight in areas for improvement: Auto generates reports, radar chart for maturity assessment, insights per process and participant and bespoke, ready to use, RACI Matrix
    • Gives you a professional Dashboard to guide and perform a thorough Strategic Automated Command and Control System Self-Assessment
    • Is secure: Ensures offline data protection of your Self-Assessment results
    • Dynamically prioritized projects-ready RACI Matrix shows your organization exactly what to do next:

 

STEP 3: Implement, Track, follow up and revise strategy

The outcomes of STEP 2, the self assessment, are the inputs for STEP 3; Start and manage Strategic Automated Command and Control System projects with the 62 implementation resources:

  • 62 step-by-step Strategic Automated Command and Control System Project Management Form Templates covering over 6000 Strategic Automated Command and Control System project requirements and success criteria:

Examples; 10 of the check box criteria:

  1. Procurement Management Plan: Is the Strategic Automated Command and Control System project schedule available for all Strategic Automated Command and Control System project team members to review?

  2. Issue Log: How is this initiative related to other portfolios, programs, or Strategic Automated Command and Control System projects?

  3. Cost Management Plan: Are written status reports provided on a designated frequent basis?

  4. Risk Management Plan: Market risk -Will the new service or product be useful to the organization or marketable to others?

  5. Project or Phase Close-Out: Have business partners been involved extensively, and what data was required for them?

  6. Assumption and Constraint Log: Does a documented Strategic Automated Command and Control System project organizational policy & plan (i.e. governance model) exist?

  7. Probability and Impact Matrix: Pay attention to the quality of the plans: is the content complete, or does it seem to be lacking detail?

  8. Cost Management Plan: Schedule contingency Ð How will the schedule contingency be administrated?

  9. Cost Management Plan: Were stakeholders aware and supportive of the principles and practices of modern software estimation?

  10. Variance Analysis: Can the contractor substantiate work package and planning package budgets?

 
Step-by-step and complete Strategic Automated Command and Control System Project Management Forms and Templates including check box criteria and templates.

1.0 Initiating Process Group:

  • 1.1 Strategic Automated Command and Control System project Charter
  • 1.2 Stakeholder Register
  • 1.3 Stakeholder Analysis Matrix


2.0 Planning Process Group:

  • 2.1 Strategic Automated Command and Control System project Management Plan
  • 2.2 Scope Management Plan
  • 2.3 Requirements Management Plan
  • 2.4 Requirements Documentation
  • 2.5 Requirements Traceability Matrix
  • 2.6 Strategic Automated Command and Control System project Scope Statement
  • 2.7 Assumption and Constraint Log
  • 2.8 Work Breakdown Structure
  • 2.9 WBS Dictionary
  • 2.10 Schedule Management Plan
  • 2.11 Activity List
  • 2.12 Activity Attributes
  • 2.13 Milestone List
  • 2.14 Network Diagram
  • 2.15 Activity Resource Requirements
  • 2.16 Resource Breakdown Structure
  • 2.17 Activity Duration Estimates
  • 2.18 Duration Estimating Worksheet
  • 2.19 Strategic Automated Command and Control System project Schedule
  • 2.20 Cost Management Plan
  • 2.21 Activity Cost Estimates
  • 2.22 Cost Estimating Worksheet
  • 2.23 Cost Baseline
  • 2.24 Quality Management Plan
  • 2.25 Quality Metrics
  • 2.26 Process Improvement Plan
  • 2.27 Responsibility Assignment Matrix
  • 2.28 Roles and Responsibilities
  • 2.29 Human Resource Management Plan
  • 2.30 Communications Management Plan
  • 2.31 Risk Management Plan
  • 2.32 Risk Register
  • 2.33 Probability and Impact Assessment
  • 2.34 Probability and Impact Matrix
  • 2.35 Risk Data Sheet
  • 2.36 Procurement Management Plan
  • 2.37 Source Selection Criteria
  • 2.38 Stakeholder Management Plan
  • 2.39 Change Management Plan


3.0 Executing Process Group:

  • 3.1 Team Member Status Report
  • 3.2 Change Request
  • 3.3 Change Log
  • 3.4 Decision Log
  • 3.5 Quality Audit
  • 3.6 Team Directory
  • 3.7 Team Operating Agreement
  • 3.8 Team Performance Assessment
  • 3.9 Team Member Performance Assessment
  • 3.10 Issue Log


4.0 Monitoring and Controlling Process Group:

  • 4.1 Strategic Automated Command and Control System project Performance Report
  • 4.2 Variance Analysis
  • 4.3 Earned Value Status
  • 4.4 Risk Audit
  • 4.5 Contractor Status Report
  • 4.6 Formal Acceptance


5.0 Closing Process Group:

  • 5.1 Procurement Audit
  • 5.2 Contract Close-Out
  • 5.3 Strategic Automated Command and Control System project or Phase Close-Out
  • 5.4 Lessons Learned

 

Results

With this Three Step process you will have all the tools you need for any Strategic Automated Command and Control System project with this in-depth Strategic Automated Command and Control System Toolkit.

In using the Toolkit you will be better able to:

  • Diagnose Strategic Automated Command and Control System projects, initiatives, organizations, businesses and processes using accepted diagnostic standards and practices
  • Implement evidence-based best practice strategies aligned with overall goals
  • Integrate recent advances in Strategic Automated Command and Control System and put process design strategies into practice according to best practice guidelines

Defining, designing, creating, and implementing a process to solve a business challenge or meet a business objective is the most valuable role; In EVERY company, organization and department.

Unless you are talking a one-time, single-use project within a business, there should be a process. Whether that process is managed and implemented by humans, AI, or a combination of the two, it needs to be designed by someone with a complex enough perspective to ask the right questions. Someone capable of asking the right questions and step back and say, 'What are we really trying to accomplish here? And is there a different way to look at it?'

This Toolkit empowers people to do just that - whether their title is entrepreneur, manager, consultant, (Vice-)President, CxO etc... - they are the people who rule the future. They are the person who asks the right questions to make Strategic Automated Command and Control System investments work better.

This Strategic Automated Command and Control System All-Inclusive Toolkit enables You to be that person.

 

Includes lifetime updates

Every self assessment comes with Lifetime Updates and Lifetime Free Updated Books. Lifetime Updates is an industry-first feature which allows you to receive verified self assessment updates, ensuring you always have the most accurate information at your fingertips.

46 Reviews Hide Reviews Show Reviews

  • 5
    Thank you for this achievement.

    Posted by IFMA on 5th Sep 2018

    IFMA International Facility Management Association

  • 5
    Thank you. I would very much like to read your publication and share my views on our blog to reach our English and Spanish customers.

    Posted by James S. on 4th Sep 2018

    James S. Account Manager

  • 5
    Hi everybody, The book is amazing, I will read it deeper during my next holidays. Thanks and regards

    Posted by Diego P. on 3rd Sep 2018

    Diego P. Head of BDA Business Unit

  • 5
    Thank you so much... Hope to visit Australia someday. Smart IT people... 5 star review.

    Posted by ELLEN C. on 3rd Sep 2018

    ELLEN C. Enterprise Innovation: Business & Information Technology Strategist

  • 5
    The Honourable Ralph Goodale, Minister of Public Safety and Emergency Preparedness, Canada

    Posted by The Honourable Ralph Goodale, Minister of Public Safety and Emergency Preparedness, Canada on 3rd Sep 2018

    I would like to extend my sincere appreciation. I would also like to thank you for your service in promoting business continuity practices. I wish you every success in your work.

  • 5
    ctmfile.com

    Posted by ctmfile.com on 5th Aug 2018

    This is a structured, in-depth review and how to work out how develop the controls and processes that will begin to solve the problem. Knowing what questions to ask is the starting point. The level of questions and analysis required will surprise, but this level of details is essential.

  • 5
    I look forward to becoming more familiar with the material and conducting the survey with my employer. So far it looks very comprehensive. Thank you.

    Posted by RON F. on 5th Aug 2018

    RON F. Director Analytics Governance

  • 5
    Seems quite handy - going to start using it next month as we're investing quite a lot in it. This will define for us what to do in this space and solve a real problem (rather than chasing shiny objects).

    Posted by DAVIN B. on 4th Aug 2018

    DAVIN B. Systems Manager

  • 5
    Awesome!!!!!!

    Posted by JOHN G. on 4th Aug 2018

    JOHN G. Principal Consultant