Telecommunications network Toolkit: best-practice templates, step-by-step work plans and maturity diagnostics

$249.00
(46 reviews) Write a Review
Availability:
Downloadable Resources, Instant Access

Save time, empower your teams and effectively upgrade your processes with access to this practical Telecommunications network Toolkit and guide. Address common challenges with best-practice templates, step-by-step work plans and maturity diagnostics for any Telecommunications network related project.

Download the Toolkit and in Three Steps you will be guided from idea to implementation results.

The Toolkit contains the following practical and powerful enablers with new and updated Telecommunications network specific requirements:


STEP 1: Get your bearings

Start with...

  • The latest quick edition of the Telecommunications network Self Assessment book in PDF containing 49 requirements to perform a quickscan, get an overview and share with stakeholders.

Organized in a data driven improvement cycle RDMAICS (Recognize, Define, Measure, Analyze, Improve, Control and Sustain), check the…

  • Example pre-filled Self-Assessment Excel Dashboard to get familiar with results generation

Then find your goals...


STEP 2: Set concrete goals, tasks, dates and numbers you can track

Featuring 655 new and updated case-based questions, organized into seven core areas of process design, this Self-Assessment will help you identify areas in which Telecommunications network improvements can be made.

Examples; 10 of the 655 standard requirements:

  1. What are your key Telecommunications network organizational performance measures, including key short and longer-term financial measures?

  2. Who are the Telecommunications network improvement team members, including Management Leads and Coaches?

  3. Is the team adequately staffed with the desired cross-functionality? If not, what additional resources are available to the team?

  4. Are the units of measure consistent?

  5. Implementation Planning- is a pilot needed to test the changes before a full roll out occurs?

  6. Are customer(s) identified and segmented according to their different needs and requirements?

  7. What Relevant Entities could be measured?

  8. How likely is the current Telecommunications network plan to come in on schedule or on budget?

  9. What quality tools were useful in the control phase?

  10. What is our formula for success in Telecommunications network ?


Complete the self assessment, on your own or with a team in a workshop setting. Use the workbook together with the self assessment requirements spreadsheet:

  • The workbook is the latest in-depth complete edition of the Telecommunications network book in PDF containing 655 requirements, which criteria correspond to the criteria in...

Your Telecommunications network self-assessment dashboard which gives you your dynamically prioritized projects-ready tool and shows your organization exactly what to do next:

  • The Self-Assessment Excel Dashboard; with the Telecommunications network Self-Assessment and Scorecard you will develop a clear picture of which Telecommunications network areas need attention, which requirements you should focus on and who will be responsible for them:

    • Shows your organization instant insight in areas for improvement: Auto generates reports, radar chart for maturity assessment, insights per process and participant and bespoke, ready to use, RACI Matrix
    • Gives you a professional Dashboard to guide and perform a thorough Telecommunications network Self-Assessment
    • Is secure: Ensures offline data protection of your Self-Assessment results
    • Dynamically prioritized projects-ready RACI Matrix shows your organization exactly what to do next:

 

STEP 3: Implement, Track, follow up and revise strategy

The outcomes of STEP 2, the self assessment, are the inputs for STEP 3; Start and manage Telecommunications network projects with the 62 implementation resources:

  • 62 step-by-step Telecommunications network Project Management Form Templates covering over 6000 Telecommunications network project requirements and success criteria:

Examples; 10 of the check box criteria:

  1. Project Charter: Assumptions: What factors, for planning purposes, are you considering to be true?

  2. Activity Duration Estimates: Is earned value analysis completed to assess Telecommunications network project performance?

  3. Probability and Impact Matrix: During Telecommunications network project executing, a major problem occurs that was not included in the risk register. What should you do FIRST?

  4. Risk Management Plan: What are the cost, schedule and resource impacts if the risk does occur?

  5. Procurement Management Plan: Have all documents been archived in a Telecommunications network project repository for each release?

  6. Closing Process Group: Specific - Is the objective clear in terms of what, how, when, and where the situation will be changed?

  7. Activity Duration Estimates: Does a process exist to identify Telecommunications network project roles, responsibilities and reporting relationships?

  8. Activity Duration Estimates: Does a process exist to determine which risk events to accept and which events to disregard?

  9. Executing Process Group: How does the job market and current state of the economy affect human resource management?

  10. Probability and Impact Matrix: How are risks and risk management perceived in the Telecommunications network project?

 
Step-by-step and complete Telecommunications network Project Management Forms and Templates including check box criteria and templates.

1.0 Initiating Process Group:

  • 1.1 Telecommunications network project Charter
  • 1.2 Stakeholder Register
  • 1.3 Stakeholder Analysis Matrix


2.0 Planning Process Group:

  • 2.1 Telecommunications network project Management Plan
  • 2.2 Scope Management Plan
  • 2.3 Requirements Management Plan
  • 2.4 Requirements Documentation
  • 2.5 Requirements Traceability Matrix
  • 2.6 Telecommunications network project Scope Statement
  • 2.7 Assumption and Constraint Log
  • 2.8 Work Breakdown Structure
  • 2.9 WBS Dictionary
  • 2.10 Schedule Management Plan
  • 2.11 Activity List
  • 2.12 Activity Attributes
  • 2.13 Milestone List
  • 2.14 Network Diagram
  • 2.15 Activity Resource Requirements
  • 2.16 Resource Breakdown Structure
  • 2.17 Activity Duration Estimates
  • 2.18 Duration Estimating Worksheet
  • 2.19 Telecommunications network project Schedule
  • 2.20 Cost Management Plan
  • 2.21 Activity Cost Estimates
  • 2.22 Cost Estimating Worksheet
  • 2.23 Cost Baseline
  • 2.24 Quality Management Plan
  • 2.25 Quality Metrics
  • 2.26 Process Improvement Plan
  • 2.27 Responsibility Assignment Matrix
  • 2.28 Roles and Responsibilities
  • 2.29 Human Resource Management Plan
  • 2.30 Communications Management Plan
  • 2.31 Risk Management Plan
  • 2.32 Risk Register
  • 2.33 Probability and Impact Assessment
  • 2.34 Probability and Impact Matrix
  • 2.35 Risk Data Sheet
  • 2.36 Procurement Management Plan
  • 2.37 Source Selection Criteria
  • 2.38 Stakeholder Management Plan
  • 2.39 Change Management Plan


3.0 Executing Process Group:

  • 3.1 Team Member Status Report
  • 3.2 Change Request
  • 3.3 Change Log
  • 3.4 Decision Log
  • 3.5 Quality Audit
  • 3.6 Team Directory
  • 3.7 Team Operating Agreement
  • 3.8 Team Performance Assessment
  • 3.9 Team Member Performance Assessment
  • 3.10 Issue Log


4.0 Monitoring and Controlling Process Group:

  • 4.1 Telecommunications network project Performance Report
  • 4.2 Variance Analysis
  • 4.3 Earned Value Status
  • 4.4 Risk Audit
  • 4.5 Contractor Status Report
  • 4.6 Formal Acceptance


5.0 Closing Process Group:

  • 5.1 Procurement Audit
  • 5.2 Contract Close-Out
  • 5.3 Telecommunications network project or Phase Close-Out
  • 5.4 Lessons Learned

 

Results

With this Three Step process you will have all the tools you need for any Telecommunications network project with this in-depth Telecommunications network Toolkit.

In using the Toolkit you will be better able to:

  • Diagnose Telecommunications network projects, initiatives, organizations, businesses and processes using accepted diagnostic standards and practices
  • Implement evidence-based best practice strategies aligned with overall goals
  • Integrate recent advances in Telecommunications network and put process design strategies into practice according to best practice guidelines

Defining, designing, creating, and implementing a process to solve a business challenge or meet a business objective is the most valuable role; In EVERY company, organization and department.

Unless you are talking a one-time, single-use project within a business, there should be a process. Whether that process is managed and implemented by humans, AI, or a combination of the two, it needs to be designed by someone with a complex enough perspective to ask the right questions. Someone capable of asking the right questions and step back and say, 'What are we really trying to accomplish here? And is there a different way to look at it?'

This Toolkit empowers people to do just that - whether their title is entrepreneur, manager, consultant, (Vice-)President, CxO etc... - they are the people who rule the future. They are the person who asks the right questions to make Telecommunications network investments work better.

This Telecommunications network All-Inclusive Toolkit enables You to be that person.

 

Includes lifetime updates

Every self assessment comes with Lifetime Updates and Lifetime Free Updated Books. Lifetime Updates is an industry-first feature which allows you to receive verified self assessment updates, ensuring you always have the most accurate information at your fingertips.

46 Reviews Hide Reviews Show Reviews

  • 5
    Great initiative and timing to release the requirements! And thanks a lot for sharing it with us!

    Posted by Pierre V. on 5th Sep 2018

    Pierre V. B2B Product & Content Marketing

  • 5
    Awesome!!!!!!

    Posted by JOHN G. on 4th Sep 2018

    JOHN G. Principal Consultant

  • 5
    JUNE M. Vice President Information Technology, Human Resources and Administrative Services

    Posted by JUNE M. on 3rd Sep 2018

    I would love to have a conversation with you, at the moment I am preparing for our annual IT Conference, which I might add, we could have used you as a presenter!

  • 5
    Thank you for the excel dashboard. It is so powerful.

    Posted by TAHAR H. on 2nd Sep 2018

    TAHAR H. Researcher at Institute of Economic Analysis and Prospective Studies

  • 5
    Seems quite handy - going to start using it next month as we're investing quite a lot in it. This will define for us what to do in this space and solve a real problem (rather than chasing shiny objects).

    Posted by DAVIN B. on 5th Aug 2018

    DAVIN B. Systems Manager

  • 5
    Thank you, these are great!

    Posted by NATALIE F. on 5th Aug 2018

    NATALIE F. Healthcare Information Technology Consultant

  • 5
    Thank you so much for a great tool!

    Posted by Kristy M. on 4th Aug 2018

    Kristy M. Project Manager

  • 5
    I have gone through the array of your works and they are simply awesome! Great job you have been doing.

    Posted by KENNETH O. on 3rd Aug 2018

    KENNETH O. MD/CEO, Emerging Media

  • 5
    DAVID S. Director Organisational performance

    Posted by DAVID S. on 3rd Aug 2018

    Honestly - at the extremely low outlay - the capacity to accelerate your journey, increase productivity and be a more informed buyer (when combined with what actual business problems you are trying to solve) I would be extremely hard pressed to not undertake it.