Unified Endpoint Management Toolkit: best-practice templates, step-by-step work plans and maturity diagnostics

$249.00
(46 reviews) Write a Review
Availability:
Downloadable Resources, Instant Access

Save time, empower your teams and effectively upgrade your processes with access to this practical Unified Endpoint Management Toolkit and guide. Address common challenges with best-practice templates, step-by-step work plans and maturity diagnostics for any Unified Endpoint Management related project.

Download the Toolkit and in Three Steps you will be guided from idea to implementation results.

The Toolkit contains the following practical and powerful enablers with new and updated Unified Endpoint Management specific requirements:


STEP 1: Get your bearings

Start with...

  • The latest quick edition of the Unified Endpoint Management Self Assessment book in PDF containing 49 requirements to perform a quickscan, get an overview and share with stakeholders.

Organized in a data driven improvement cycle RDMAICS (Recognize, Define, Measure, Analyze, Improve, Control and Sustain), check the…

  • Example pre-filled Self-Assessment Excel Dashboard to get familiar with results generation

Then find your goals...


STEP 2: Set concrete goals, tasks, dates and numbers you can track

Featuring 711 new and updated case-based questions, organized into seven core areas of process design, this Self-Assessment will help you identify areas in which Unified Endpoint Management improvements can be made.

Examples; 10 of the 711 standard requirements:

  1. How would one define Unified Endpoint Management leadership?

  2. What are measures?

  3. In what ways are Unified Endpoint Management vendors and us interacting to ensure safe and effective use?

  4. In the past few months, what is the smallest change we have made that has had the biggest positive result? What was it about that small change that produced the large return?

  5. How will the team or the process owner(s) monitor the implementation plan to see that it is working as intended?

  6. How do you manage and improve your Unified Endpoint Management work systems to deliver customer value and achieve organizational success and sustainability?

  7. Has implementation been effective in reaching specified objectives?

  8. What is the smallest subset of the problem we can usefully solve?

  9. How can we improve performance?

  10. Has the Unified Endpoint Management work been fairly and/or equitably divided and delegated among team members who are qualified and capable to perform the work? Has everyone contributed?


Complete the self assessment, on your own or with a team in a workshop setting. Use the workbook together with the self assessment requirements spreadsheet:

  • The workbook is the latest in-depth complete edition of the Unified Endpoint Management book in PDF containing 711 requirements, which criteria correspond to the criteria in...

Your Unified Endpoint Management self-assessment dashboard which gives you your dynamically prioritized projects-ready tool and shows your organization exactly what to do next:

  • The Self-Assessment Excel Dashboard; with the Unified Endpoint Management Self-Assessment and Scorecard you will develop a clear picture of which Unified Endpoint Management areas need attention, which requirements you should focus on and who will be responsible for them:

    • Shows your organization instant insight in areas for improvement: Auto generates reports, radar chart for maturity assessment, insights per process and participant and bespoke, ready to use, RACI Matrix
    • Gives you a professional Dashboard to guide and perform a thorough Unified Endpoint Management Self-Assessment
    • Is secure: Ensures offline data protection of your Self-Assessment results
    • Dynamically prioritized projects-ready RACI Matrix shows your organization exactly what to do next:

 

STEP 3: Implement, Track, follow up and revise strategy

The outcomes of STEP 2, the self assessment, are the inputs for STEP 3; Start and manage Unified Endpoint Management projects with the 62 implementation resources:

  • 62 step-by-step Unified Endpoint Management Project Management Form Templates covering over 6000 Unified Endpoint Management project requirements and success criteria:

Examples; 10 of the check box criteria:

  1. Quality Audit: How does the organization know that its staff support services planning and management systems are appropriately effective and constructive?

  2. Activity Duration Estimates: Is earned value analysis completed to assess Unified Endpoint Management project performance?

  3. Procurement Audit: Are the pages of the minutes book press pre-numbered?

  4. Project Management Plan: Are there any scope changes proposed for a previously authorized Unified Endpoint Management project?

  5. Procurement Management Plan: Are enough systems & user personnel assigned to the Unified Endpoint Management project?

  6. Team Operating Agreement: Must your members collaborate successfully to complete Unified Endpoint Management projects?

  7. Stakeholder Management Plan: Is it standard practice to formally commit stakeholders to the Unified Endpoint Management project via agreements?

  8. Project Management Plan: What should you drop in order to add something new?

  9. WBS Dictionary: Are indirect costs accumulated for comparison with the corresponding budgets?

  10. Cost Baseline: What does it mean to say a task is 75% complete after 3 months?

 
Step-by-step and complete Unified Endpoint Management Project Management Forms and Templates including check box criteria and templates.

1.0 Initiating Process Group:

  • 1.1 Unified Endpoint Management project Charter
  • 1.2 Stakeholder Register
  • 1.3 Stakeholder Analysis Matrix


2.0 Planning Process Group:

  • 2.1 Unified Endpoint Management project Management Plan
  • 2.2 Scope Management Plan
  • 2.3 Requirements Management Plan
  • 2.4 Requirements Documentation
  • 2.5 Requirements Traceability Matrix
  • 2.6 Unified Endpoint Management project Scope Statement
  • 2.7 Assumption and Constraint Log
  • 2.8 Work Breakdown Structure
  • 2.9 WBS Dictionary
  • 2.10 Schedule Management Plan
  • 2.11 Activity List
  • 2.12 Activity Attributes
  • 2.13 Milestone List
  • 2.14 Network Diagram
  • 2.15 Activity Resource Requirements
  • 2.16 Resource Breakdown Structure
  • 2.17 Activity Duration Estimates
  • 2.18 Duration Estimating Worksheet
  • 2.19 Unified Endpoint Management project Schedule
  • 2.20 Cost Management Plan
  • 2.21 Activity Cost Estimates
  • 2.22 Cost Estimating Worksheet
  • 2.23 Cost Baseline
  • 2.24 Quality Management Plan
  • 2.25 Quality Metrics
  • 2.26 Process Improvement Plan
  • 2.27 Responsibility Assignment Matrix
  • 2.28 Roles and Responsibilities
  • 2.29 Human Resource Management Plan
  • 2.30 Communications Management Plan
  • 2.31 Risk Management Plan
  • 2.32 Risk Register
  • 2.33 Probability and Impact Assessment
  • 2.34 Probability and Impact Matrix
  • 2.35 Risk Data Sheet
  • 2.36 Procurement Management Plan
  • 2.37 Source Selection Criteria
  • 2.38 Stakeholder Management Plan
  • 2.39 Change Management Plan


3.0 Executing Process Group:

  • 3.1 Team Member Status Report
  • 3.2 Change Request
  • 3.3 Change Log
  • 3.4 Decision Log
  • 3.5 Quality Audit
  • 3.6 Team Directory
  • 3.7 Team Operating Agreement
  • 3.8 Team Performance Assessment
  • 3.9 Team Member Performance Assessment
  • 3.10 Issue Log


4.0 Monitoring and Controlling Process Group:

  • 4.1 Unified Endpoint Management project Performance Report
  • 4.2 Variance Analysis
  • 4.3 Earned Value Status
  • 4.4 Risk Audit
  • 4.5 Contractor Status Report
  • 4.6 Formal Acceptance


5.0 Closing Process Group:

  • 5.1 Procurement Audit
  • 5.2 Contract Close-Out
  • 5.3 Unified Endpoint Management project or Phase Close-Out
  • 5.4 Lessons Learned

 

Results

With this Three Step process you will have all the tools you need for any Unified Endpoint Management project with this in-depth Unified Endpoint Management Toolkit.

In using the Toolkit you will be better able to:

  • Diagnose Unified Endpoint Management projects, initiatives, organizations, businesses and processes using accepted diagnostic standards and practices
  • Implement evidence-based best practice strategies aligned with overall goals
  • Integrate recent advances in Unified Endpoint Management and put process design strategies into practice according to best practice guidelines

Defining, designing, creating, and implementing a process to solve a business challenge or meet a business objective is the most valuable role; In EVERY company, organization and department.

Unless you are talking a one-time, single-use project within a business, there should be a process. Whether that process is managed and implemented by humans, AI, or a combination of the two, it needs to be designed by someone with a complex enough perspective to ask the right questions. Someone capable of asking the right questions and step back and say, 'What are we really trying to accomplish here? And is there a different way to look at it?'

This Toolkit empowers people to do just that - whether their title is entrepreneur, manager, consultant, (Vice-)President, CxO etc... - they are the people who rule the future. They are the person who asks the right questions to make Unified Endpoint Management investments work better.

This Unified Endpoint Management All-Inclusive Toolkit enables You to be that person.

 

Includes lifetime updates

Every self assessment comes with Lifetime Updates and Lifetime Free Updated Books. Lifetime Updates is an industry-first feature which allows you to receive verified self assessment updates, ensuring you always have the most accurate information at your fingertips.

46 Reviews Hide Reviews Show Reviews

  • 5
    Just looked at the files. Impressive. Well done. I am learning.

    Posted by MARTIN B. on 5th Sep 2018

    MARTIN B. Risks and Compliance, Vulnerability and Security Testing, Threat Detection and Response, Managed Security Services.

  • 5
    Thank you for the excel dashboard. It is so powerful.

    Posted by TAHAR H. on 5th Aug 2018

    TAHAR H. Researcher at Institute of Economic Analysis and Prospective Studies

  • 5
    ctmfile.com

    Posted by ctmfile.com on 3rd Aug 2018

    This is a structured, in-depth review and how to work out how develop the controls and processes that will begin to solve the problem. Knowing what questions to ask is the starting point. The level of questions and analysis required will surprise, but this level of details is essential.

  • 5
    I look forward to becoming more familiar with the material and conducting the survey with my employer. So far it looks very comprehensive. Thank you.

    Posted by RON F. on 2nd Aug 2018

    RON F. Director Analytics Governance

  • 5
    Spot on, thank you. Will study your book to help my clients.

    Posted by WALTER H. on 2nd Aug 2018

    WALTER H. Business Coach

  • 5
    I will use everything extensively to prepare for an audit scheduled in Dec and Jan for an important automotive customer.

    Posted by Bruno C. on 2nd Aug 2018

    Bruno C. ICT Director

  • 5
    Thank you, this is perfect - I will certainly be recommending Self Assessment dashboards to all - I can not wait to tell my colleagues on Monday.

    Posted by MEL F. on 5th Jul 2018

    MEL F. Change Management Professional

  • 5
    Thank you so much for a great tool!

    Posted by Kristy M. on 5th Jul 2018

    Kristy M. Project Manager

  • 5
    This is great! Thank you. Say, do you all do consulting or certification?

    Posted by KEN W. on 5th Jul 2018

    KEN W. Managing Director