Account Navigation

Account Navigation

Currency - All prices are in AUD

Currency - All prices are in AUD
 Loading... Please wait...
The Art of Service Standard Requirements Self Assessments

ACM Computing Classification System Toolkit: best-practice templates, step-by-step work plans and maturity diagnostics

$249.00

ACM Computing Classification System Toolkit: best-practice templates, step-by-step work plans and maturity diagnostics

$249.00

Availability:
Downloadable Resources, Instant Access

Product Description

Save time, empower your teams and effectively upgrade your processes with access to this practical ACM Computing Classification System Toolkit and guide. Address common challenges with best-practice templates, step-by-step work plans and maturity diagnostics for any ACM Computing Classification System related project.

Download the Toolkit and in Three Steps you will be guided from idea to implementation results.

The Toolkit contains the following practical and powerful enablers with new and updated ACM Computing Classification System specific requirements:


STEP 1: Get your bearings

Start with...

  • The latest quick edition of the ACM Computing Classification System Self Assessment book in PDF containing 49 requirements to perform a quickscan, get an overview and share with stakeholders.

Organized in a data driven improvement cycle RDMAICS (Recognize, Define, Measure, Analyze, Improve, Control and Sustain), check the…

  • Example pre-filled Self-Assessment Excel Dashboard to get familiar with results generation

Then find your goals...


STEP 2: Set concrete goals, tasks, dates and numbers you can track

Featuring 685 new and updated case-based questions, organized into seven core areas of process design, this Self-Assessment will help you identify areas in which ACM Computing Classification System improvements can be made.

Examples; 10 of the 685 standard requirements:

  1. Was a pilot designed for the proposed solution(s)?

  2. Design Thinking: Integrating Innovation, ACM Computing Classification System, and Brand Value

  3. What is the craziest thing we can do?

  4. How does the organization define, manage, and improve its ACM Computing Classification System processes?

  5. How do you assess your ACM Computing Classification System workforce capability and capacity needs, including skills, competencies, and staffing levels?

  6. How will you know when its improved?

  7. When conducting a business process reengineering study, what should we look for when trying to identify business processes to change?

  8. Who is going to care?

  9. Do those selected for the ACM Computing Classification System team have a good general understanding of what ACM Computing Classification System is all about?

  10. Is there documentation that will support the successful operation of the improvement?


Complete the self assessment, on your own or with a team in a workshop setting. Use the workbook together with the self assessment requirements spreadsheet:

  • The workbook is the latest in-depth complete edition of the ACM Computing Classification System book in PDF containing 685 requirements, which criteria correspond to the criteria in...

Your ACM Computing Classification System self-assessment dashboard which gives you your dynamically prioritized projects-ready tool and shows your organization exactly what to do next:

  • The Self-Assessment Excel Dashboard; with the ACM Computing Classification System Self-Assessment and Scorecard you will develop a clear picture of which ACM Computing Classification System areas need attention, which requirements you should focus on and who will be responsible for them:

    • Shows your organization instant insight in areas for improvement: Auto generates reports, radar chart for maturity assessment, insights per process and participant and bespoke, ready to use, RACI Matrix
    • Gives you a professional Dashboard to guide and perform a thorough ACM Computing Classification System Self-Assessment
    • Is secure: Ensures offline data protection of your Self-Assessment results
    • Dynamically prioritized projects-ready RACI Matrix shows your organization exactly what to do next:

 

STEP 3: Implement, Track, follow up and revise strategy

The outcomes of STEP 2, the self assessment, are the inputs for STEP 3; Start and manage ACM Computing Classification System projects with the 62 implementation resources:

  • 62 step-by-step ACM Computing Classification System Project Management Form Templates covering over 6000 ACM Computing Classification System project requirements and success criteria:

Examples; 10 of the check box criteria:

  1. Scope Management Plan: Does the title convey to the reader the essence of the ACM Computing Classification System project?

  2. Procurement Management Plan: Is there a set of procedures to capture, analyze and act on quality metrics?

  3. Project Scope Statement: How will you verify the accuracy of the work of the ACM Computing Classification System project, and what constitutes acceptance of the deliverables?

  4. Risk Management Plan: Is the necessary data being captured and is it complete and accurate?

  5. Procurement Audit: Is there a record maintained of the procedures followed in the opening of tenders together with the reasons for the acceptance or rejection of tenders received?

  6. Activity Duration Estimates: What is the critical path for this ACM Computing Classification System project and how long is it?

  7. Procurement Audit: Are requisitions and other purchase requests batched to reduce the number of orders issued?

  8. Lessons Learned: Was the ACM Computing Classification System project significantly delayed/hampered by outside dependencies (outside to the ACM Computing Classification System project, that is)?

  9. Cost Baseline: Has the appropriate access to relevant data and analysis capability been granted?

  10. Procurement Audit: Are services/tasks combined in such a way that the market is used where relevant?

 
Step-by-step and complete ACM Computing Classification System Project Management Forms and Templates including check box criteria and templates.

1.0 Initiating Process Group:

  • 1.1 ACM Computing Classification System project Charter
  • 1.2 Stakeholder Register
  • 1.3 Stakeholder Analysis Matrix


2.0 Planning Process Group:

  • 2.1 ACM Computing Classification System project Management Plan
  • 2.2 Scope Management Plan
  • 2.3 Requirements Management Plan
  • 2.4 Requirements Documentation
  • 2.5 Requirements Traceability Matrix
  • 2.6 ACM Computing Classification System project Scope Statement
  • 2.7 Assumption and Constraint Log
  • 2.8 Work Breakdown Structure
  • 2.9 WBS Dictionary
  • 2.10 Schedule Management Plan
  • 2.11 Activity List
  • 2.12 Activity Attributes
  • 2.13 Milestone List
  • 2.14 Network Diagram
  • 2.15 Activity Resource Requirements
  • 2.16 Resource Breakdown Structure
  • 2.17 Activity Duration Estimates
  • 2.18 Duration Estimating Worksheet
  • 2.19 ACM Computing Classification System project Schedule
  • 2.20 Cost Management Plan
  • 2.21 Activity Cost Estimates
  • 2.22 Cost Estimating Worksheet
  • 2.23 Cost Baseline
  • 2.24 Quality Management Plan
  • 2.25 Quality Metrics
  • 2.26 Process Improvement Plan
  • 2.27 Responsibility Assignment Matrix
  • 2.28 Roles and Responsibilities
  • 2.29 Human Resource Management Plan
  • 2.30 Communications Management Plan
  • 2.31 Risk Management Plan
  • 2.32 Risk Register
  • 2.33 Probability and Impact Assessment
  • 2.34 Probability and Impact Matrix
  • 2.35 Risk Data Sheet
  • 2.36 Procurement Management Plan
  • 2.37 Source Selection Criteria
  • 2.38 Stakeholder Management Plan
  • 2.39 Change Management Plan


3.0 Executing Process Group:

  • 3.1 Team Member Status Report
  • 3.2 Change Request
  • 3.3 Change Log
  • 3.4 Decision Log
  • 3.5 Quality Audit
  • 3.6 Team Directory
  • 3.7 Team Operating Agreement
  • 3.8 Team Performance Assessment
  • 3.9 Team Member Performance Assessment
  • 3.10 Issue Log


4.0 Monitoring and Controlling Process Group:

  • 4.1 ACM Computing Classification System project Performance Report
  • 4.2 Variance Analysis
  • 4.3 Earned Value Status
  • 4.4 Risk Audit
  • 4.5 Contractor Status Report
  • 4.6 Formal Acceptance


5.0 Closing Process Group:

  • 5.1 Procurement Audit
  • 5.2 Contract Close-Out
  • 5.3 ACM Computing Classification System project or Phase Close-Out
  • 5.4 Lessons Learned

 

Results

With this Three Step process you will have all the tools you need for any ACM Computing Classification System project with this in-depth ACM Computing Classification System Toolkit.

In using the Toolkit you will be better able to:

  • Diagnose ACM Computing Classification System projects, initiatives, organizations, businesses and processes using accepted diagnostic standards and practices
  • Implement evidence-based best practice strategies aligned with overall goals
  • Integrate recent advances in ACM Computing Classification System and put process design strategies into practice according to best practice guidelines

Defining, designing, creating, and implementing a process to solve a business challenge or meet a business objective is the most valuable role; In EVERY company, organization and department.

Unless you are talking a one-time, single-use project within a business, there should be a process. Whether that process is managed and implemented by humans, AI, or a combination of the two, it needs to be designed by someone with a complex enough perspective to ask the right questions. Someone capable of asking the right questions and step back and say, 'What are we really trying to accomplish here? And is there a different way to look at it?'

This Toolkit empowers people to do just that - whether their title is entrepreneur, manager, consultant, (Vice-)President, CxO etc... - they are the people who rule the future. They are the person who asks the right questions to make ACM Computing Classification System investments work better.

This ACM Computing Classification System All-Inclusive Toolkit enables You to be that person.

 

Includes lifetime updates

Every self assessment comes with Lifetime Updates and Lifetime Free Updated Books. Lifetime Updates is an industry-first feature which allows you to receive verified self assessment updates, ensuring you always have the most accurate information at your fingertips.

Product Reviews

Find Similar Products by Category