Aerial work platform Toolkit: best-practice templates, step-by-step work plans and maturity diagnostics

$249.00
(46 reviews) Write a Review
Availability:
Downloadable Resources, Instant Access

Save time, empower your teams and effectively upgrade your processes with access to this practical Aerial work platform Toolkit and guide. Address common challenges with best-practice templates, step-by-step work plans and maturity diagnostics for any Aerial work platform related project.

Download the Toolkit and in Three Steps you will be guided from idea to implementation results.

The Toolkit contains the following practical and powerful enablers with new and updated Aerial work platform specific requirements:


STEP 1: Get your bearings

Start with...

  • The latest quick edition of the Aerial work platform Self Assessment book in PDF containing 49 requirements to perform a quickscan, get an overview and share with stakeholders.

Organized in a data driven improvement cycle RDMAICS (Recognize, Define, Measure, Analyze, Improve, Control and Sustain), check the…

  • Example pre-filled Self-Assessment Excel Dashboard to get familiar with results generation

Then find your goals...


STEP 2: Set concrete goals, tasks, dates and numbers you can track

Featuring 893 new and updated case-based questions, organized into seven core areas of process design, this Self-Assessment will help you identify areas in which Aerial work platform improvements can be made.

Examples; 10 of the 893 standard requirements:

  1. How will you know when its improved?

  2. How will success or failure be measured?

  3. What customer feedback methods were used to solicit their input?

  4. Will Aerial work platform deliverables need to be tested and, if so, by whom?

  5. What happens at this company when people fail?

  6. For your Aerial work platform project, identify and describe the business environment. is there more than one layer to the business environment?

  7. What problems are you facing and how do you consider Aerial work platform will circumvent those obstacles?

  8. Is there a limit on the number of users in Aerial work platform ?

  9. Is a contingency plan established?

  10. Is there a completed, verified, and validated high-level as is (not should be or could be) stakeholder process map?


Complete the self assessment, on your own or with a team in a workshop setting. Use the workbook together with the self assessment requirements spreadsheet:

  • The workbook is the latest in-depth complete edition of the Aerial work platform book in PDF containing 893 requirements, which criteria correspond to the criteria in...

Your Aerial work platform self-assessment dashboard which gives you your dynamically prioritized projects-ready tool and shows your organization exactly what to do next:

  • The Self-Assessment Excel Dashboard; with the Aerial work platform Self-Assessment and Scorecard you will develop a clear picture of which Aerial work platform areas need attention, which requirements you should focus on and who will be responsible for them:

    • Shows your organization instant insight in areas for improvement: Auto generates reports, radar chart for maturity assessment, insights per process and participant and bespoke, ready to use, RACI Matrix
    • Gives you a professional Dashboard to guide and perform a thorough Aerial work platform Self-Assessment
    • Is secure: Ensures offline data protection of your Self-Assessment results
    • Dynamically prioritized projects-ready RACI Matrix shows your organization exactly what to do next:

 

STEP 3: Implement, Track, follow up and revise strategy

The outcomes of STEP 2, the self assessment, are the inputs for STEP 3; Start and manage Aerial work platform projects with the 62 implementation resources:

  • 62 step-by-step Aerial work platform Project Management Form Templates covering over 6000 Aerial work platform project requirements and success criteria:

Examples; 10 of the check box criteria:

  1. Cost Management Plan: Have Aerial work platform project team accountabilities & responsibilities been clearly defined?

  2. Team Member Performance Assessment: Verify business objectives. Are they appropriate, and well-articulated?

  3. Cost Management Plan: Are individual tasks of reasonable time effort (8Ð40 hours)?

  4. Schedule Management Plan: Pareto diagrams, statistical sampling, flow charting or trend analysis used quality monitoring?

  5. Scope Management Plan: Are milestone deliverables effectively tracked and compared to Aerial work platform project plan?

  6. Closing Process Group: Will the Aerial work platform project deliverable(s) replace a current asset or group of assets?

  7. Procurement Management Plan: How will the duration of the Aerial work platform project influence your decisions?

  8. Source Selection Criteria: How do you consolidate reviews and analysis of evaluators?

  9. Human Resource Management Plan: Is the structure for tracking the Aerial work platform project schedule well defined and assigned to a specific individual?

  10. Cost Estimating Worksheet: Who is best positioned to know and assist in identifying such factors?

 
Step-by-step and complete Aerial work platform Project Management Forms and Templates including check box criteria and templates.

1.0 Initiating Process Group:

  • 1.1 Aerial work platform project Charter
  • 1.2 Stakeholder Register
  • 1.3 Stakeholder Analysis Matrix


2.0 Planning Process Group:

  • 2.1 Aerial work platform project Management Plan
  • 2.2 Scope Management Plan
  • 2.3 Requirements Management Plan
  • 2.4 Requirements Documentation
  • 2.5 Requirements Traceability Matrix
  • 2.6 Aerial work platform project Scope Statement
  • 2.7 Assumption and Constraint Log
  • 2.8 Work Breakdown Structure
  • 2.9 WBS Dictionary
  • 2.10 Schedule Management Plan
  • 2.11 Activity List
  • 2.12 Activity Attributes
  • 2.13 Milestone List
  • 2.14 Network Diagram
  • 2.15 Activity Resource Requirements
  • 2.16 Resource Breakdown Structure
  • 2.17 Activity Duration Estimates
  • 2.18 Duration Estimating Worksheet
  • 2.19 Aerial work platform project Schedule
  • 2.20 Cost Management Plan
  • 2.21 Activity Cost Estimates
  • 2.22 Cost Estimating Worksheet
  • 2.23 Cost Baseline
  • 2.24 Quality Management Plan
  • 2.25 Quality Metrics
  • 2.26 Process Improvement Plan
  • 2.27 Responsibility Assignment Matrix
  • 2.28 Roles and Responsibilities
  • 2.29 Human Resource Management Plan
  • 2.30 Communications Management Plan
  • 2.31 Risk Management Plan
  • 2.32 Risk Register
  • 2.33 Probability and Impact Assessment
  • 2.34 Probability and Impact Matrix
  • 2.35 Risk Data Sheet
  • 2.36 Procurement Management Plan
  • 2.37 Source Selection Criteria
  • 2.38 Stakeholder Management Plan
  • 2.39 Change Management Plan


3.0 Executing Process Group:

  • 3.1 Team Member Status Report
  • 3.2 Change Request
  • 3.3 Change Log
  • 3.4 Decision Log
  • 3.5 Quality Audit
  • 3.6 Team Directory
  • 3.7 Team Operating Agreement
  • 3.8 Team Performance Assessment
  • 3.9 Team Member Performance Assessment
  • 3.10 Issue Log


4.0 Monitoring and Controlling Process Group:

  • 4.1 Aerial work platform project Performance Report
  • 4.2 Variance Analysis
  • 4.3 Earned Value Status
  • 4.4 Risk Audit
  • 4.5 Contractor Status Report
  • 4.6 Formal Acceptance


5.0 Closing Process Group:

  • 5.1 Procurement Audit
  • 5.2 Contract Close-Out
  • 5.3 Aerial work platform project or Phase Close-Out
  • 5.4 Lessons Learned

 

Results

With this Three Step process you will have all the tools you need for any Aerial work platform project with this in-depth Aerial work platform Toolkit.

In using the Toolkit you will be better able to:

  • Diagnose Aerial work platform projects, initiatives, organizations, businesses and processes using accepted diagnostic standards and practices
  • Implement evidence-based best practice strategies aligned with overall goals
  • Integrate recent advances in Aerial work platform and put process design strategies into practice according to best practice guidelines

Defining, designing, creating, and implementing a process to solve a business challenge or meet a business objective is the most valuable role; In EVERY company, organization and department.

Unless you are talking a one-time, single-use project within a business, there should be a process. Whether that process is managed and implemented by humans, AI, or a combination of the two, it needs to be designed by someone with a complex enough perspective to ask the right questions. Someone capable of asking the right questions and step back and say, 'What are we really trying to accomplish here? And is there a different way to look at it?'

This Toolkit empowers people to do just that - whether their title is entrepreneur, manager, consultant, (Vice-)President, CxO etc... - they are the people who rule the future. They are the person who asks the right questions to make Aerial work platform investments work better.

This Aerial work platform All-Inclusive Toolkit enables You to be that person.

 

Includes lifetime updates

Every self assessment comes with Lifetime Updates and Lifetime Free Updated Books. Lifetime Updates is an industry-first feature which allows you to receive verified self assessment updates, ensuring you always have the most accurate information at your fingertips.

46 Reviews Hide Reviews Show Reviews

  • 5
    Congrats! Very cool!

    Posted by Caryn B. on 5th Sep 2018

    Caryn B. Vice President Production

  • 5
    Thanks for your service! That's really appreciated!

    Posted by HARRY M. on 5th Sep 2018

    HARRY M. Enterprise Architect

  • 5
    I look forward to becoming more familiar with the material and conducting the survey with my employer. So far it looks very comprehensive. Thank you.

    Posted by RON F. on 4th Sep 2018

    RON F. Director Analytics Governance

  • 5
    This is great!

    Posted by GREG C, on 3rd Sep 2018

    GREG C. CEO Managed Service Provider

  • 5
    Seems quite handy - going to start using it next month as we're investing quite a lot in it. This will define for us what to do in this space and solve a real problem (rather than chasing shiny objects).

    Posted by DAVIN B. on 2nd Sep 2018

    DAVIN B. Systems Manager

  • 5
    Thank you so much... Hope to visit Australia someday. Smart IT people... 5 star review.

    Posted by ELLEN C. on 2nd Sep 2018

    ELLEN C. Enterprise Innovation: Business & Information Technology Strategist

  • 5
    DAVID T. Software Consultant

    Posted by DAVID T. on 2nd Sep 2018

    Quality is a topic that is very important for me right now, and it should be important for every team. This book contains a self-assessment that can be useful for your organization to find out where you currently are. If you struggle to ask the right questions about your efforts, this book will give many of them, and a way to score your answers

  • 5
    I have read your book and it's a great work for my business. Thank you.

    Posted by Nguyen Hoang Vu on 5th Aug 2018

    Nguyen Hoang Vu

  • 5
    This is awesome. Thank you very much.

    Posted by Dr. Martin K. on 5th Aug 2018

    Dr. Martin K. CEO