Account Navigation

Account Navigation

Currency - All prices are in AUD

Currency - All prices are in AUD
 Loading... Please wait...
The Art of Service Standard Requirements Self Assessments

Airport Transit System Toolkit: best-practice templates, step-by-step work plans and maturity diagnostics

$249.00

Airport Transit System Toolkit: best-practice templates, step-by-step work plans and maturity diagnostics

$249.00

Availability:
Downloadable Resources, Instant Access

Product Description

Save time, empower your teams and effectively upgrade your processes with access to this practical Airport Transit System Toolkit and guide. Address common challenges with best-practice templates, step-by-step work plans and maturity diagnostics for any Airport Transit System related project.

Download the Toolkit and in Three Steps you will be guided from idea to implementation results.

The Toolkit contains the following practical and powerful enablers with new and updated Airport Transit System specific requirements:


STEP 1: Get your bearings

Start with...

  • The latest quick edition of the Airport Transit System Self Assessment book in PDF containing 49 requirements to perform a quickscan, get an overview and share with stakeholders.

Organized in a data driven improvement cycle RDMAICS (Recognize, Define, Measure, Analyze, Improve, Control and Sustain), check the…

  • Example pre-filled Self-Assessment Excel Dashboard to get familiar with results generation

Then find your goals...


STEP 2: Set concrete goals, tasks, dates and numbers you can track

Featuring 689 new and updated case-based questions, organized into seven core areas of process design, this Self-Assessment will help you identify areas in which Airport Transit System improvements can be made.

Examples; 10 of the 689 standard requirements:

  1. Teaches and consults on quality process improvement, project management, and accelerated Airport Transit System techniques

  2. Who defines (or who defined) the rules and roles?

  3. How do you measure progress and evaluate training effectiveness?

  4. What should the next improvement project be that is related to Airport Transit System?

  5. Is the impact that Airport Transit System has shown?

  6. Think about some of the processes you undertake within your organization. which do you own?

  7. Why should we expend time and effort to implement measurement?

  8. What is Effective Airport Transit System?

  9. Is Process Variation Displayed/Communicated?

  10. How to Improve?


Complete the self assessment, on your own or with a team in a workshop setting. Use the workbook together with the self assessment requirements spreadsheet:

  • The workbook is the latest in-depth complete edition of the Airport Transit System book in PDF containing 689 requirements, which criteria correspond to the criteria in...

Your Airport Transit System self-assessment dashboard which gives you your dynamically prioritized projects-ready tool and shows your organization exactly what to do next:

  • The Self-Assessment Excel Dashboard; with the Airport Transit System Self-Assessment and Scorecard you will develop a clear picture of which Airport Transit System areas need attention, which requirements you should focus on and who will be responsible for them:

    • Shows your organization instant insight in areas for improvement: Auto generates reports, radar chart for maturity assessment, insights per process and participant and bespoke, ready to use, RACI Matrix
    • Gives you a professional Dashboard to guide and perform a thorough Airport Transit System Self-Assessment
    • Is secure: Ensures offline data protection of your Self-Assessment results
    • Dynamically prioritized projects-ready RACI Matrix shows your organization exactly what to do next:

 

STEP 3: Implement, Track, follow up and revise strategy

The outcomes of STEP 2, the self assessment, are the inputs for STEP 3; Start and manage Airport Transit System projects with the 62 implementation resources:

  • 62 step-by-step Airport Transit System Project Management Form Templates covering over 6000 Airport Transit System project requirements and success criteria:

Examples; 10 of the check box criteria:

  1. Resource Breakdown Structure: What is the purpose of assigning and documenting responsibility?

  2. Change Management Plan: What can you do to minimise misinterpretation and negative perceptions?

  3. Quality Management Plan: Explain the procedures used to verify the data quality of the data being reviewed?

  4. Procurement Audit: Has the organization taken a well-grounded decision about the procurement procedure chosen and has it documented the process?

  5. Team Operating Agreement: What individual strengths does each team member bring to the group?

  6. Probability and Impact Assessment: Are staff committed for the duration of the Airport Transit System project?

  7. Lessons Learned: How well were Airport Transit System project issues communicated throughout your involvement in the Airport Transit System project?

  8. Schedule Management Plan: Can be realistically shortened (the duration of subsequent tasks)?

  9. Risk Audit: Are all programs planned and conducted according to recognised safety standards?

  10. Formal Acceptance: Is formal acceptance of the Airport Transit System project product documented and distributed?

 
Step-by-step and complete Airport Transit System Project Management Forms and Templates including check box criteria and templates.

1.0 Initiating Process Group:

  • 1.1 Airport Transit System project Charter
  • 1.2 Stakeholder Register
  • 1.3 Stakeholder Analysis Matrix


2.0 Planning Process Group:

  • 2.1 Airport Transit System project Management Plan
  • 2.2 Scope Management Plan
  • 2.3 Requirements Management Plan
  • 2.4 Requirements Documentation
  • 2.5 Requirements Traceability Matrix
  • 2.6 Airport Transit System project Scope Statement
  • 2.7 Assumption and Constraint Log
  • 2.8 Work Breakdown Structure
  • 2.9 WBS Dictionary
  • 2.10 Schedule Management Plan
  • 2.11 Activity List
  • 2.12 Activity Attributes
  • 2.13 Milestone List
  • 2.14 Network Diagram
  • 2.15 Activity Resource Requirements
  • 2.16 Resource Breakdown Structure
  • 2.17 Activity Duration Estimates
  • 2.18 Duration Estimating Worksheet
  • 2.19 Airport Transit System project Schedule
  • 2.20 Cost Management Plan
  • 2.21 Activity Cost Estimates
  • 2.22 Cost Estimating Worksheet
  • 2.23 Cost Baseline
  • 2.24 Quality Management Plan
  • 2.25 Quality Metrics
  • 2.26 Process Improvement Plan
  • 2.27 Responsibility Assignment Matrix
  • 2.28 Roles and Responsibilities
  • 2.29 Human Resource Management Plan
  • 2.30 Communications Management Plan
  • 2.31 Risk Management Plan
  • 2.32 Risk Register
  • 2.33 Probability and Impact Assessment
  • 2.34 Probability and Impact Matrix
  • 2.35 Risk Data Sheet
  • 2.36 Procurement Management Plan
  • 2.37 Source Selection Criteria
  • 2.38 Stakeholder Management Plan
  • 2.39 Change Management Plan


3.0 Executing Process Group:

  • 3.1 Team Member Status Report
  • 3.2 Change Request
  • 3.3 Change Log
  • 3.4 Decision Log
  • 3.5 Quality Audit
  • 3.6 Team Directory
  • 3.7 Team Operating Agreement
  • 3.8 Team Performance Assessment
  • 3.9 Team Member Performance Assessment
  • 3.10 Issue Log


4.0 Monitoring and Controlling Process Group:

  • 4.1 Airport Transit System project Performance Report
  • 4.2 Variance Analysis
  • 4.3 Earned Value Status
  • 4.4 Risk Audit
  • 4.5 Contractor Status Report
  • 4.6 Formal Acceptance


5.0 Closing Process Group:

  • 5.1 Procurement Audit
  • 5.2 Contract Close-Out
  • 5.3 Airport Transit System project or Phase Close-Out
  • 5.4 Lessons Learned

 

Results

With this Three Step process you will have all the tools you need for any Airport Transit System project with this in-depth Airport Transit System Toolkit.

In using the Toolkit you will be better able to:

  • Diagnose Airport Transit System projects, initiatives, organizations, businesses and processes using accepted diagnostic standards and practices
  • Implement evidence-based best practice strategies aligned with overall goals
  • Integrate recent advances in Airport Transit System and put process design strategies into practice according to best practice guidelines

Defining, designing, creating, and implementing a process to solve a business challenge or meet a business objective is the most valuable role; In EVERY company, organization and department.

Unless you are talking a one-time, single-use project within a business, there should be a process. Whether that process is managed and implemented by humans, AI, or a combination of the two, it needs to be designed by someone with a complex enough perspective to ask the right questions. Someone capable of asking the right questions and step back and say, 'What are we really trying to accomplish here? And is there a different way to look at it?'

This Toolkit empowers people to do just that - whether their title is entrepreneur, manager, consultant, (Vice-)President, CxO etc... - they are the people who rule the future. They are the person who asks the right questions to make Airport Transit System investments work better.

This Airport Transit System All-Inclusive Toolkit enables You to be that person.

 

Includes lifetime updates

Every self assessment comes with Lifetime Updates and Lifetime Free Updated Books. Lifetime Updates is an industry-first feature which allows you to receive verified self assessment updates, ensuring you always have the most accurate information at your fingertips.

Product Reviews

Find Similar Products by Category