Account Navigation

Account Navigation

Currency - All prices are in AUD

Currency - All prices are in AUD
 Loading... Please wait...
The Art of Service Standard Requirements Self Assessments

AS 8015 Toolkit: best-practice templates, step-by-step work plans and maturity diagnostics

$249.00

AS 8015 Toolkit: best-practice templates, step-by-step work plans and maturity diagnostics

$249.00

Availability:
Downloadable Resources, Instant Access

Product Description

Save time, empower your teams and effectively upgrade your processes with access to this practical AS 8015 Toolkit and guide. Address common challenges with best-practice templates, step-by-step work plans and maturity diagnostics for any AS 8015 related project.

Download the Toolkit and in Three Steps you will be guided from idea to implementation results.

The Toolkit contains the following practical and powerful enablers with new and updated AS 8015 specific requirements:


STEP 1: Get your bearings

Start with...

  • The latest quick edition of the AS 8015 Self Assessment book in PDF containing 49 requirements to perform a quickscan, get an overview and share with stakeholders.

Organized in a data driven improvement cycle RDMAICS (Recognize, Define, Measure, Analyze, Improve, Control and Sustain), check the…

  • Example pre-filled Self-Assessment Excel Dashboard to get familiar with results generation

Then find your goals...


STEP 2: Set concrete goals, tasks, dates and numbers you can track

Featuring 718 new and updated case-based questions, organized into seven core areas of process design, this Self-Assessment will help you identify areas in which AS 8015 improvements can be made.

Examples; 10 of the 718 standard requirements:

  1. How will we build a 100-year startup?

  2. When a AS 8015 manager recognizes a problem, what options are available?

  3. Does the team have regular meetings?

  4. How do you identify and analyze stakeholders and their interests?

  5. Has the direction changed at all during the course of AS 8015? If so, when did it change and why?

  6. What are the agreed upon definitions of the high impact areas, defect(s), unit(s), and opportunities that will figure into the process capability metrics?

  7. Do we all define AS 8015 in the same way?

  8. What are the critical parameters to watch?

  9. How do we ensure that implementations of AS 8015 products are done in a way that ensures safety?

  10. What to measure and why?


Complete the self assessment, on your own or with a team in a workshop setting. Use the workbook together with the self assessment requirements spreadsheet:

  • The workbook is the latest in-depth complete edition of the AS 8015 book in PDF containing 718 requirements, which criteria correspond to the criteria in...

Your AS 8015 self-assessment dashboard which gives you your dynamically prioritized projects-ready tool and shows your organization exactly what to do next:

  • The Self-Assessment Excel Dashboard; with the AS 8015 Self-Assessment and Scorecard you will develop a clear picture of which AS 8015 areas need attention, which requirements you should focus on and who will be responsible for them:

    • Shows your organization instant insight in areas for improvement: Auto generates reports, radar chart for maturity assessment, insights per process and participant and bespoke, ready to use, RACI Matrix
    • Gives you a professional Dashboard to guide and perform a thorough AS 8015 Self-Assessment
    • Is secure: Ensures offline data protection of your Self-Assessment results
    • Dynamically prioritized projects-ready RACI Matrix shows your organization exactly what to do next:

 

STEP 3: Implement, Track, follow up and revise strategy

The outcomes of STEP 2, the self assessment, are the inputs for STEP 3; Start and manage AS 8015 projects with the 62 implementation resources:

  • 62 step-by-step AS 8015 Project Management Form Templates covering over 6000 AS 8015 project requirements and success criteria:

Examples; 10 of the check box criteria:

  1. Quality Audit: How does the organization know that its security arrangements are appropriately effective and constructive?

  2. Cost Management Plan: Is a PMO (AS 8015 project Management Office) in place and provide oversight to the AS 8015 project?

  3. Quality Management Plan: How does your organization perform analyses to assess overall organizational performance and set priorities?

  4. Quality Metrics: Which report did you use to create the data you are submitting?

  5. Procurement Audit: Was the overall procurement done within a reasonable time?

  6. Cost Management Plan: What will be the split of responsibilities of progress measurement and controls among the owner, contractor, subcontractors, and vendors?

  7. Quality Audit: Health and safety arrangements; stress management workshops. How does the organization know that it provides a safe and healthy environment?

  8. Project Scope Statement: Is the AS 8015 project Manager qualified and experienced in AS 8015 project Management?

  9. Quality Metrics: Have alternatives been defined in the event that failure occurs?

  10. Monitoring and Controlling Process Group: What were things that you did well, but could improve, and how?

 
Step-by-step and complete AS 8015 Project Management Forms and Templates including check box criteria and templates.

1.0 Initiating Process Group:

  • 1.1 AS 8015 project Charter
  • 1.2 Stakeholder Register
  • 1.3 Stakeholder Analysis Matrix


2.0 Planning Process Group:

  • 2.1 AS 8015 project Management Plan
  • 2.2 Scope Management Plan
  • 2.3 Requirements Management Plan
  • 2.4 Requirements Documentation
  • 2.5 Requirements Traceability Matrix
  • 2.6 AS 8015 project Scope Statement
  • 2.7 Assumption and Constraint Log
  • 2.8 Work Breakdown Structure
  • 2.9 WBS Dictionary
  • 2.10 Schedule Management Plan
  • 2.11 Activity List
  • 2.12 Activity Attributes
  • 2.13 Milestone List
  • 2.14 Network Diagram
  • 2.15 Activity Resource Requirements
  • 2.16 Resource Breakdown Structure
  • 2.17 Activity Duration Estimates
  • 2.18 Duration Estimating Worksheet
  • 2.19 AS 8015 project Schedule
  • 2.20 Cost Management Plan
  • 2.21 Activity Cost Estimates
  • 2.22 Cost Estimating Worksheet
  • 2.23 Cost Baseline
  • 2.24 Quality Management Plan
  • 2.25 Quality Metrics
  • 2.26 Process Improvement Plan
  • 2.27 Responsibility Assignment Matrix
  • 2.28 Roles and Responsibilities
  • 2.29 Human Resource Management Plan
  • 2.30 Communications Management Plan
  • 2.31 Risk Management Plan
  • 2.32 Risk Register
  • 2.33 Probability and Impact Assessment
  • 2.34 Probability and Impact Matrix
  • 2.35 Risk Data Sheet
  • 2.36 Procurement Management Plan
  • 2.37 Source Selection Criteria
  • 2.38 Stakeholder Management Plan
  • 2.39 Change Management Plan


3.0 Executing Process Group:

  • 3.1 Team Member Status Report
  • 3.2 Change Request
  • 3.3 Change Log
  • 3.4 Decision Log
  • 3.5 Quality Audit
  • 3.6 Team Directory
  • 3.7 Team Operating Agreement
  • 3.8 Team Performance Assessment
  • 3.9 Team Member Performance Assessment
  • 3.10 Issue Log


4.0 Monitoring and Controlling Process Group:

  • 4.1 AS 8015 project Performance Report
  • 4.2 Variance Analysis
  • 4.3 Earned Value Status
  • 4.4 Risk Audit
  • 4.5 Contractor Status Report
  • 4.6 Formal Acceptance


5.0 Closing Process Group:

  • 5.1 Procurement Audit
  • 5.2 Contract Close-Out
  • 5.3 AS 8015 project or Phase Close-Out
  • 5.4 Lessons Learned

 

Results

With this Three Step process you will have all the tools you need for any AS 8015 project with this in-depth AS 8015 Toolkit.

In using the Toolkit you will be better able to:

  • Diagnose AS 8015 projects, initiatives, organizations, businesses and processes using accepted diagnostic standards and practices
  • Implement evidence-based best practice strategies aligned with overall goals
  • Integrate recent advances in AS 8015 and put process design strategies into practice according to best practice guidelines

Defining, designing, creating, and implementing a process to solve a business challenge or meet a business objective is the most valuable role; In EVERY company, organization and department.

Unless you are talking a one-time, single-use project within a business, there should be a process. Whether that process is managed and implemented by humans, AI, or a combination of the two, it needs to be designed by someone with a complex enough perspective to ask the right questions. Someone capable of asking the right questions and step back and say, 'What are we really trying to accomplish here? And is there a different way to look at it?'

This Toolkit empowers people to do just that - whether their title is entrepreneur, manager, consultant, (Vice-)President, CxO etc... - they are the people who rule the future. They are the person who asks the right questions to make AS 8015 investments work better.

This AS 8015 All-Inclusive Toolkit enables You to be that person.

 

Includes lifetime updates

Every self assessment comes with Lifetime Updates and Lifetime Free Updated Books. Lifetime Updates is an industry-first feature which allows you to receive verified self assessment updates, ensuring you always have the most accurate information at your fingertips.

Product Reviews

Find Similar Products by Category