Cloud Peak Energy Toolkit: best-practice templates, step-by-step work plans and maturity diagnostics

$249.00
(46 reviews) Write a Review
Availability:
Downloadable Resources, Instant Access

Save time, empower your teams and effectively upgrade your processes with access to this practical Cloud Peak Energy Toolkit and guide. Address common challenges with best-practice templates, step-by-step work plans and maturity diagnostics for any Cloud Peak Energy related project.

Download the Toolkit and in Three Steps you will be guided from idea to implementation results.

The Toolkit contains the following practical and powerful enablers with new and updated Cloud Peak Energy specific requirements:


STEP 1: Get your bearings

Start with...

  • The latest quick edition of the Cloud Peak Energy Self Assessment book in PDF containing 49 requirements to perform a quickscan, get an overview and share with stakeholders.

Organized in a data driven improvement cycle RDMAICS (Recognize, Define, Measure, Analyze, Improve, Control and Sustain), check the…

  • Example pre-filled Self-Assessment Excel Dashboard to get familiar with results generation

Then find your goals...


STEP 2: Set concrete goals, tasks, dates and numbers you can track

Featuring 874 new and updated case-based questions, organized into seven core areas of process design, this Self-Assessment will help you identify areas in which Cloud Peak Energy improvements can be made.

Examples; 10 of the 874 standard requirements:

  1. Is there a Performance Baseline?

  2. How do we make it meaningful in connecting Cloud Peak Energy with what users do day-to-day?

  3. Are you failing differently each time?

  4. How will the Cloud Peak Energy team and the group measure complete success of Cloud Peak Energy?

  5. What baselines are required to be defined and managed?

  6. Who do we think the world wants us to be?

  7. Are there Cloud Peak Energy Models?

  8. Are possible solutions generated and tested?

  9. Think about the functions involved in your Cloud Peak Energy project. what processes flow from these functions?

  10. How do we engage the workforce, in addition to satisfying them?


Complete the self assessment, on your own or with a team in a workshop setting. Use the workbook together with the self assessment requirements spreadsheet:

  • The workbook is the latest in-depth complete edition of the Cloud Peak Energy book in PDF containing 874 requirements, which criteria correspond to the criteria in...

Your Cloud Peak Energy self-assessment dashboard which gives you your dynamically prioritized projects-ready tool and shows your organization exactly what to do next:

  • The Self-Assessment Excel Dashboard; with the Cloud Peak Energy Self-Assessment and Scorecard you will develop a clear picture of which Cloud Peak Energy areas need attention, which requirements you should focus on and who will be responsible for them:

    • Shows your organization instant insight in areas for improvement: Auto generates reports, radar chart for maturity assessment, insights per process and participant and bespoke, ready to use, RACI Matrix
    • Gives you a professional Dashboard to guide and perform a thorough Cloud Peak Energy Self-Assessment
    • Is secure: Ensures offline data protection of your Self-Assessment results
    • Dynamically prioritized projects-ready RACI Matrix shows your organization exactly what to do next:

 

STEP 3: Implement, Track, follow up and revise strategy

The outcomes of STEP 2, the self assessment, are the inputs for STEP 3; Start and manage Cloud Peak Energy projects with the 62 implementation resources:

  • 62 step-by-step Cloud Peak Energy Project Management Form Templates covering over 6000 Cloud Peak Energy project requirements and success criteria:

Examples; 10 of the check box criteria:

  1. Quality Audit: Does everyone know what they are supposed to be doing, how and why?

  2. Risk Management Plan: Market risk: Will the new product be useful to the organization or marketable to others?

  3. Activity Duration Estimates: A Cloud Peak Energy project has three critical paths. Which BEST describes how this affects the Cloud Peak Energy project?

  4. Responsibility Assignment Matrix: Is the entire contract planned in time-phased control accounts to the extent practicable?

  5. Cost Management Plan: Do all stakeholders know how to access this repository and where to find the Cloud Peak Energy project documentation?

  6. Lessons Learned: How well do you feel the executives supported this Cloud Peak Energy project?

  7. Stakeholder Management Plan: Is the amount of effort justified by the anticipated value of forming a new process?

  8. Closing Process Group: How well did the chosen processes fit the needs of the Cloud Peak Energy project?

  9. Procurement Audit: Are regulations on taxes, fees, duties, excises, tariffs etc. not impeding (international) competition?

  10. Assumption and Constraint Log: Does the document/deliverable meet all requirements (for example, statement of work) specific to this deliverable?

 
Step-by-step and complete Cloud Peak Energy Project Management Forms and Templates including check box criteria and templates.

1.0 Initiating Process Group:

  • 1.1 Cloud Peak Energy project Charter
  • 1.2 Stakeholder Register
  • 1.3 Stakeholder Analysis Matrix


2.0 Planning Process Group:

  • 2.1 Cloud Peak Energy project Management Plan
  • 2.2 Scope Management Plan
  • 2.3 Requirements Management Plan
  • 2.4 Requirements Documentation
  • 2.5 Requirements Traceability Matrix
  • 2.6 Cloud Peak Energy project Scope Statement
  • 2.7 Assumption and Constraint Log
  • 2.8 Work Breakdown Structure
  • 2.9 WBS Dictionary
  • 2.10 Schedule Management Plan
  • 2.11 Activity List
  • 2.12 Activity Attributes
  • 2.13 Milestone List
  • 2.14 Network Diagram
  • 2.15 Activity Resource Requirements
  • 2.16 Resource Breakdown Structure
  • 2.17 Activity Duration Estimates
  • 2.18 Duration Estimating Worksheet
  • 2.19 Cloud Peak Energy project Schedule
  • 2.20 Cost Management Plan
  • 2.21 Activity Cost Estimates
  • 2.22 Cost Estimating Worksheet
  • 2.23 Cost Baseline
  • 2.24 Quality Management Plan
  • 2.25 Quality Metrics
  • 2.26 Process Improvement Plan
  • 2.27 Responsibility Assignment Matrix
  • 2.28 Roles and Responsibilities
  • 2.29 Human Resource Management Plan
  • 2.30 Communications Management Plan
  • 2.31 Risk Management Plan
  • 2.32 Risk Register
  • 2.33 Probability and Impact Assessment
  • 2.34 Probability and Impact Matrix
  • 2.35 Risk Data Sheet
  • 2.36 Procurement Management Plan
  • 2.37 Source Selection Criteria
  • 2.38 Stakeholder Management Plan
  • 2.39 Change Management Plan


3.0 Executing Process Group:

  • 3.1 Team Member Status Report
  • 3.2 Change Request
  • 3.3 Change Log
  • 3.4 Decision Log
  • 3.5 Quality Audit
  • 3.6 Team Directory
  • 3.7 Team Operating Agreement
  • 3.8 Team Performance Assessment
  • 3.9 Team Member Performance Assessment
  • 3.10 Issue Log


4.0 Monitoring and Controlling Process Group:

  • 4.1 Cloud Peak Energy project Performance Report
  • 4.2 Variance Analysis
  • 4.3 Earned Value Status
  • 4.4 Risk Audit
  • 4.5 Contractor Status Report
  • 4.6 Formal Acceptance


5.0 Closing Process Group:

  • 5.1 Procurement Audit
  • 5.2 Contract Close-Out
  • 5.3 Cloud Peak Energy project or Phase Close-Out
  • 5.4 Lessons Learned

 

Results

With this Three Step process you will have all the tools you need for any Cloud Peak Energy project with this in-depth Cloud Peak Energy Toolkit.

In using the Toolkit you will be better able to:

  • Diagnose Cloud Peak Energy projects, initiatives, organizations, businesses and processes using accepted diagnostic standards and practices
  • Implement evidence-based best practice strategies aligned with overall goals
  • Integrate recent advances in Cloud Peak Energy and put process design strategies into practice according to best practice guidelines

Defining, designing, creating, and implementing a process to solve a business challenge or meet a business objective is the most valuable role; In EVERY company, organization and department.

Unless you are talking a one-time, single-use project within a business, there should be a process. Whether that process is managed and implemented by humans, AI, or a combination of the two, it needs to be designed by someone with a complex enough perspective to ask the right questions. Someone capable of asking the right questions and step back and say, 'What are we really trying to accomplish here? And is there a different way to look at it?'

This Toolkit empowers people to do just that - whether their title is entrepreneur, manager, consultant, (Vice-)President, CxO etc... - they are the people who rule the future. They are the person who asks the right questions to make Cloud Peak Energy investments work better.

This Cloud Peak Energy All-Inclusive Toolkit enables You to be that person.

 

Includes lifetime updates

Every self assessment comes with Lifetime Updates and Lifetime Free Updated Books. Lifetime Updates is an industry-first feature which allows you to receive verified self assessment updates, ensuring you always have the most accurate information at your fingertips.

46 Reviews Hide Reviews Show Reviews

  • 5
    DAVID T. Software Consultant

    Posted by DAVID T. on 5th Sep 2018

    Quality is a topic that is very important for me right now, and it should be important for every team. This book contains a self-assessment that can be useful for your organization to find out where you currently are. If you struggle to ask the right questions about your efforts, this book will give many of them, and a way to score your answers

  • 5
    Super helpful.. Love how the full assessment helps me take full control of this project!

    Posted by Brett O. on 5th Sep 2018

    BRETT O. Strategist

  • 5
    Thank you for this achievement.

    Posted by IFMA on 4th Sep 2018

    IFMA International Facility Management Association

  • 5
    The Self-Assessment is a great tool to gather feedback and input from others, especially challenges, and things to watch out for. Very helpful!

    Posted by JULIE M. on 3rd Sep 2018

    JULIE M. AWS Solution Architect

  • 5
    Just looked at the files. Impressive. Well done. I am learning.

    Posted by MARTIN B. on 2nd Sep 2018

    MARTIN B. Risks and Compliance, Vulnerability and Security Testing, Threat Detection and Response, Managed Security Services.

  • 5
    Seems quite handy - going to start using it next month as we're investing quite a lot in it. This will define for us what to do in this space and solve a real problem (rather than chasing shiny objects).

    Posted by DAVIN B. on 4th Aug 2018

    DAVIN B. Systems Manager

  • 5
    I will use everything extensively to prepare for an audit scheduled in Dec and Jan for an important automotive customer.

    Posted by Bruno C. on 4th Aug 2018

    Bruno C. ICT Director

  • 5
    Thank you! I have found a lot of great information in the text so far. I plan to use your book as one of our references as we build out our SDDC and gladly leave an online review.

    Posted by CRAIG T. on 4th Aug 2018

    CRAIG T. Chief Technology Officer

  • 5
    Thank you so much for a great tool!

    Posted by Kristy M. on 3rd Aug 2018

    Kristy M. Project Manager