PC power management Toolkit: best-practice templates, step-by-step work plans and maturity diagnostics

$249.00
(46 reviews) Write a Review
Availability:
Downloadable Resources, Instant Access

Save time, empower your teams and effectively upgrade your processes with access to this practical PC power management Toolkit and guide. Address common challenges with best-practice templates, step-by-step work plans and maturity diagnostics for any PC power management related project.

Download the Toolkit and in Three Steps you will be guided from idea to implementation results.

The Toolkit contains the following practical and powerful enablers with new and updated PC power management specific requirements:


STEP 1: Get your bearings

Start with...

  • The latest quick edition of the PC power management Self Assessment book in PDF containing 49 requirements to perform a quickscan, get an overview and share with stakeholders.

Organized in a data driven improvement cycle RDMAICS (Recognize, Define, Measure, Analyze, Improve, Control and Sustain), check the…

  • Example pre-filled Self-Assessment Excel Dashboard to get familiar with results generation

Then find your goals...


STEP 2: Set concrete goals, tasks, dates and numbers you can track

Featuring 694 new and updated case-based questions, organized into seven core areas of process design, this Self-Assessment will help you identify areas in which PC power management improvements can be made.

Examples; 10 of the 694 standard requirements:

  1. Was a detailed process map created to amplify critical steps of the as is stakeholder process?

  2. Which Stakeholder Characteristics Are Analyzed?

  3. Has anyone else (internal or external to the group) attempted to solve this problem or a similar one before? If so, what knowledge can be leveraged from these previous efforts?

  4. How will effects be measured?

  5. What is the risk?

  6. What business benefits will PC power management goals deliver if achieved?

  7. Is the PC power management organization completing tasks effectively and efficiently?

  8. How can we improve performance?

  9. Is maximizing PC power management protection the same as minimizing PC power management loss?

  10. Do you monitor the effectiveness of your PC power management activities?


Complete the self assessment, on your own or with a team in a workshop setting. Use the workbook together with the self assessment requirements spreadsheet:

  • The workbook is the latest in-depth complete edition of the PC power management book in PDF containing 694 requirements, which criteria correspond to the criteria in...

Your PC power management self-assessment dashboard which gives you your dynamically prioritized projects-ready tool and shows your organization exactly what to do next:

  • The Self-Assessment Excel Dashboard; with the PC power management Self-Assessment and Scorecard you will develop a clear picture of which PC power management areas need attention, which requirements you should focus on and who will be responsible for them:

    • Shows your organization instant insight in areas for improvement: Auto generates reports, radar chart for maturity assessment, insights per process and participant and bespoke, ready to use, RACI Matrix
    • Gives you a professional Dashboard to guide and perform a thorough PC power management Self-Assessment
    • Is secure: Ensures offline data protection of your Self-Assessment results
    • Dynamically prioritized projects-ready RACI Matrix shows your organization exactly what to do next:

 

STEP 3: Implement, Track, follow up and revise strategy

The outcomes of STEP 2, the self assessment, are the inputs for STEP 3; Start and manage PC power management projects with the 62 implementation resources:

  • 62 step-by-step PC power management Project Management Form Templates covering over 6000 PC power management project requirements and success criteria:

Examples; 10 of the check box criteria:

  1. Scope Management Plan: Is it possible to track all classes of PC power management project work (e.g. scheduled, un-scheduled, defect repair, etc.)?

  2. Scope Management Plan: Deliverables -Are the deliverables tangible and verifiable?

  3. Quality Audit: Are there appropriate means for intervening if necessary?

  4. Team Directory: Process Decisions: Do job conditions warrant additional actions to collect job information and document on-site activity?

  5. Assumption and Constraint Log: Have all involved stakeholders and work groups committed to the PC power management project?

  6. Responsibility Assignment Matrix: Is the entire contract planned in time-phased control accounts to the extent practicable?

  7. Cost Management Plan: Does a documented PC power management project organizational policy & plan (i.e. governance model) exist?

  8. Stakeholder Management Plan: Is the process working, and are people executing in compliance of the process?

  9. Quality Management Plan: Are there procedures in place to effectively manage interdependencies with other PC power management projects / systems?

  10. Lessons Learned: What skills did you need that were missing on this PC power management project?

 
Step-by-step and complete PC power management Project Management Forms and Templates including check box criteria and templates.

1.0 Initiating Process Group:

  • 1.1 PC power management project Charter
  • 1.2 Stakeholder Register
  • 1.3 Stakeholder Analysis Matrix


2.0 Planning Process Group:

  • 2.1 PC power management project Management Plan
  • 2.2 Scope Management Plan
  • 2.3 Requirements Management Plan
  • 2.4 Requirements Documentation
  • 2.5 Requirements Traceability Matrix
  • 2.6 PC power management project Scope Statement
  • 2.7 Assumption and Constraint Log
  • 2.8 Work Breakdown Structure
  • 2.9 WBS Dictionary
  • 2.10 Schedule Management Plan
  • 2.11 Activity List
  • 2.12 Activity Attributes
  • 2.13 Milestone List
  • 2.14 Network Diagram
  • 2.15 Activity Resource Requirements
  • 2.16 Resource Breakdown Structure
  • 2.17 Activity Duration Estimates
  • 2.18 Duration Estimating Worksheet
  • 2.19 PC power management project Schedule
  • 2.20 Cost Management Plan
  • 2.21 Activity Cost Estimates
  • 2.22 Cost Estimating Worksheet
  • 2.23 Cost Baseline
  • 2.24 Quality Management Plan
  • 2.25 Quality Metrics
  • 2.26 Process Improvement Plan
  • 2.27 Responsibility Assignment Matrix
  • 2.28 Roles and Responsibilities
  • 2.29 Human Resource Management Plan
  • 2.30 Communications Management Plan
  • 2.31 Risk Management Plan
  • 2.32 Risk Register
  • 2.33 Probability and Impact Assessment
  • 2.34 Probability and Impact Matrix
  • 2.35 Risk Data Sheet
  • 2.36 Procurement Management Plan
  • 2.37 Source Selection Criteria
  • 2.38 Stakeholder Management Plan
  • 2.39 Change Management Plan


3.0 Executing Process Group:

  • 3.1 Team Member Status Report
  • 3.2 Change Request
  • 3.3 Change Log
  • 3.4 Decision Log
  • 3.5 Quality Audit
  • 3.6 Team Directory
  • 3.7 Team Operating Agreement
  • 3.8 Team Performance Assessment
  • 3.9 Team Member Performance Assessment
  • 3.10 Issue Log


4.0 Monitoring and Controlling Process Group:

  • 4.1 PC power management project Performance Report
  • 4.2 Variance Analysis
  • 4.3 Earned Value Status
  • 4.4 Risk Audit
  • 4.5 Contractor Status Report
  • 4.6 Formal Acceptance


5.0 Closing Process Group:

  • 5.1 Procurement Audit
  • 5.2 Contract Close-Out
  • 5.3 PC power management project or Phase Close-Out
  • 5.4 Lessons Learned

 

Results

With this Three Step process you will have all the tools you need for any PC power management project with this in-depth PC power management Toolkit.

In using the Toolkit you will be better able to:

  • Diagnose PC power management projects, initiatives, organizations, businesses and processes using accepted diagnostic standards and practices
  • Implement evidence-based best practice strategies aligned with overall goals
  • Integrate recent advances in PC power management and put process design strategies into practice according to best practice guidelines

Defining, designing, creating, and implementing a process to solve a business challenge or meet a business objective is the most valuable role; In EVERY company, organization and department.

Unless you are talking a one-time, single-use project within a business, there should be a process. Whether that process is managed and implemented by humans, AI, or a combination of the two, it needs to be designed by someone with a complex enough perspective to ask the right questions. Someone capable of asking the right questions and step back and say, 'What are we really trying to accomplish here? And is there a different way to look at it?'

This Toolkit empowers people to do just that - whether their title is entrepreneur, manager, consultant, (Vice-)President, CxO etc... - they are the people who rule the future. They are the person who asks the right questions to make PC power management investments work better.

This PC power management All-Inclusive Toolkit enables You to be that person.

 

Includes lifetime updates

Every self assessment comes with Lifetime Updates and Lifetime Free Updated Books. Lifetime Updates is an industry-first feature which allows you to receive verified self assessment updates, ensuring you always have the most accurate information at your fingertips.

46 Reviews Hide Reviews Show Reviews

  • 5
    BRENDAN M. Principle Consultant

    Posted by BRENDAN M. on 5th Aug 2018

    Every high achiever has probably been criticized as a 'control freak' at some point. However, given the numerous daily distractions entrepreneurs encounter, if you want to do 'deep work' with broad-ranging impact, you have to control your time to make each day a masterpiece. Check Out The Art of Service's Self Assessments.

  • 5
    Awesome, thank you so much!!

    Posted by ZORAN M. on 5th Aug 2018

    ZORAN M. Knowledge Management Consultant

  • 5
    CARSTEN B. Experienced safety and quality enabler

    Posted by CARSTEN B. on 4th Aug 2018

    So far I have only had time to browse it very superficially, but form that it looks very comprehensive and at the same time practical. As soon as I find time I will do a short item on it on my literature pages and point risk management professionals in your direction. Have a great day, and all the best!!

  • 5
    Hi everybody, The book is amazing, I will read it deeper during my next holidays. Thanks and regards

    Posted by Diego P. on 3rd Aug 2018

    Diego P. Head of BDA Business Unit

  • 5
    This is great! Thank you. Say, do you all do consulting or certification?

    Posted by KEN W. on 2nd Aug 2018

    KEN W. Managing Director

  • 5
    I have gone through the array of your works and they are simply awesome! Great job you have been doing.

    Posted by KENNETH O. on 5th Jul 2018

    KENNETH O. MD/CEO, Emerging Media

  • 5
    Thank you for this achievement.

    Posted by IFMA on 3rd Jul 2018

    IFMA International Facility Management Association

  • 5
    Thank you for the excel dashboard. It is so powerful.

    Posted by TAHAR H. on 2nd Jul 2018

    TAHAR H. Researcher at Institute of Economic Analysis and Prospective Studies

  • 5
    Thank you, this is perfect - I will certainly be recommending Self Assessment dashboards to all - I can not wait to tell my colleagues on Monday.

    Posted by MEL F. on 5th Jun 2018

    MEL F. Change Management Professional