Power network design (IC) Toolkit: best-practice templates, step-by-step work plans and maturity diagnostics

$249.00
(46 reviews) Write a Review
Availability:
Downloadable Resources, Instant Access

Save time, empower your teams and effectively upgrade your processes with access to this practical Power network design (IC) Toolkit and guide. Address common challenges with best-practice templates, step-by-step work plans and maturity diagnostics for any Power network design (IC) related project.

Download the Toolkit and in Three Steps you will be guided from idea to implementation results.

The Toolkit contains the following practical and powerful enablers with new and updated Power network design (IC) specific requirements:


STEP 1: Get your bearings

Start with...

  • The latest quick edition of the Power network design (IC) Self Assessment book in PDF containing 49 requirements to perform a quickscan, get an overview and share with stakeholders.

Organized in a data driven improvement cycle RDMAICS (Recognize, Define, Measure, Analyze, Improve, Control and Sustain), check the…

  • Example pre-filled Self-Assessment Excel Dashboard to get familiar with results generation

Then find your goals...


STEP 2: Set concrete goals, tasks, dates and numbers you can track

Featuring 663 new and updated case-based questions, organized into seven core areas of process design, this Self-Assessment will help you identify areas in which Power network design (IC) improvements can be made.

Examples; 10 of the 663 standard requirements:

  1. Will it be accepted by users?

  2. Where is it measured?

  3. How likely is the current Power network design (IC) plan to come in on schedule or on budget?

  4. How do we promote understanding that opportunity for improvement is not criticism of the status quo, or the people who created the status quo?

  5. What does the data say about the performance of the stakeholder process?

  6. how do you incorporate cycle time, productivity, cost control, and other efficiency and effectiveness factors into these Power network design (IC) processes?

  7. Are we making progress? and are we making progress as Power network design (IC) leaders?

  8. Is our strategy driving our strategy? Or is the way in which we allocate resources driving our strategy?

  9. What are the usability implications of Power network design (IC) actions?

  10. What error proofing will be done to address some of the discrepancies observed in the as is process?


Complete the self assessment, on your own or with a team in a workshop setting. Use the workbook together with the self assessment requirements spreadsheet:

  • The workbook is the latest in-depth complete edition of the Power network design (IC) book in PDF containing 663 requirements, which criteria correspond to the criteria in...

Your Power network design (IC) self-assessment dashboard which gives you your dynamically prioritized projects-ready tool and shows your organization exactly what to do next:

  • The Self-Assessment Excel Dashboard; with the Power network design (IC) Self-Assessment and Scorecard you will develop a clear picture of which Power network design (IC) areas need attention, which requirements you should focus on and who will be responsible for them:

    • Shows your organization instant insight in areas for improvement: Auto generates reports, radar chart for maturity assessment, insights per process and participant and bespoke, ready to use, RACI Matrix
    • Gives you a professional Dashboard to guide and perform a thorough Power network design (IC) Self-Assessment
    • Is secure: Ensures offline data protection of your Self-Assessment results
    • Dynamically prioritized projects-ready RACI Matrix shows your organization exactly what to do next:

 

STEP 3: Implement, Track, follow up and revise strategy

The outcomes of STEP 2, the self assessment, are the inputs for STEP 3; Start and manage Power network design (IC) projects with the 62 implementation resources:

  • 62 step-by-step Power network design (IC) Project Management Form Templates covering over 6000 Power network design (IC) project requirements and success criteria:

Examples; 10 of the check box criteria:

  1. Probability and Impact Assessment: Do you have specific methods that you use for each phase of the process?

  2. Responsibility Assignment Matrix: Is it safe to say you can handle more work or that some tasks you re supposed to do arent worth doing?

  3. Executing Process Group: Why do you need a good WBS to use Power network design (IC) project management software?

  4. Procurement Audit: Does the strategy ensure that the best supplier is chosen considering: price, quality, service, dependable operation, internal operation costs, life time operation costs and codes of ethic?

  5. Probability and Impact Matrix: Pay attention to the quality of the plans: is the content complete, or does it seem to be lacking detail?

  6. Stakeholder Management Plan: Is the performance of the supplier to be rated and documented?

  7. Schedule Management Plan: Is there an on-going process in place to monitor Power network design (IC) project risks?

  8. Project Management Plan: Is there anything you would now do differently on your Power network design (IC) project based on past experience?

  9. Quality Management Plan: How many Power network design (IC) project staff does this specific process affect?

  10. Procurement Audit: Is the issuance of purchase orders scheduled so that orders are not issued daily?

 
Step-by-step and complete Power network design (IC) Project Management Forms and Templates including check box criteria and templates.

1.0 Initiating Process Group:

  • 1.1 Power network design (IC) project Charter
  • 1.2 Stakeholder Register
  • 1.3 Stakeholder Analysis Matrix


2.0 Planning Process Group:

  • 2.1 Power network design (IC) project Management Plan
  • 2.2 Scope Management Plan
  • 2.3 Requirements Management Plan
  • 2.4 Requirements Documentation
  • 2.5 Requirements Traceability Matrix
  • 2.6 Power network design (IC) project Scope Statement
  • 2.7 Assumption and Constraint Log
  • 2.8 Work Breakdown Structure
  • 2.9 WBS Dictionary
  • 2.10 Schedule Management Plan
  • 2.11 Activity List
  • 2.12 Activity Attributes
  • 2.13 Milestone List
  • 2.14 Network Diagram
  • 2.15 Activity Resource Requirements
  • 2.16 Resource Breakdown Structure
  • 2.17 Activity Duration Estimates
  • 2.18 Duration Estimating Worksheet
  • 2.19 Power network design (IC) project Schedule
  • 2.20 Cost Management Plan
  • 2.21 Activity Cost Estimates
  • 2.22 Cost Estimating Worksheet
  • 2.23 Cost Baseline
  • 2.24 Quality Management Plan
  • 2.25 Quality Metrics
  • 2.26 Process Improvement Plan
  • 2.27 Responsibility Assignment Matrix
  • 2.28 Roles and Responsibilities
  • 2.29 Human Resource Management Plan
  • 2.30 Communications Management Plan
  • 2.31 Risk Management Plan
  • 2.32 Risk Register
  • 2.33 Probability and Impact Assessment
  • 2.34 Probability and Impact Matrix
  • 2.35 Risk Data Sheet
  • 2.36 Procurement Management Plan
  • 2.37 Source Selection Criteria
  • 2.38 Stakeholder Management Plan
  • 2.39 Change Management Plan


3.0 Executing Process Group:

  • 3.1 Team Member Status Report
  • 3.2 Change Request
  • 3.3 Change Log
  • 3.4 Decision Log
  • 3.5 Quality Audit
  • 3.6 Team Directory
  • 3.7 Team Operating Agreement
  • 3.8 Team Performance Assessment
  • 3.9 Team Member Performance Assessment
  • 3.10 Issue Log


4.0 Monitoring and Controlling Process Group:

  • 4.1 Power network design (IC) project Performance Report
  • 4.2 Variance Analysis
  • 4.3 Earned Value Status
  • 4.4 Risk Audit
  • 4.5 Contractor Status Report
  • 4.6 Formal Acceptance


5.0 Closing Process Group:

  • 5.1 Procurement Audit
  • 5.2 Contract Close-Out
  • 5.3 Power network design (IC) project or Phase Close-Out
  • 5.4 Lessons Learned

 

Results

With this Three Step process you will have all the tools you need for any Power network design (IC) project with this in-depth Power network design (IC) Toolkit.

In using the Toolkit you will be better able to:

  • Diagnose Power network design (IC) projects, initiatives, organizations, businesses and processes using accepted diagnostic standards and practices
  • Implement evidence-based best practice strategies aligned with overall goals
  • Integrate recent advances in Power network design (IC) and put process design strategies into practice according to best practice guidelines

Defining, designing, creating, and implementing a process to solve a business challenge or meet a business objective is the most valuable role; In EVERY company, organization and department.

Unless you are talking a one-time, single-use project within a business, there should be a process. Whether that process is managed and implemented by humans, AI, or a combination of the two, it needs to be designed by someone with a complex enough perspective to ask the right questions. Someone capable of asking the right questions and step back and say, 'What are we really trying to accomplish here? And is there a different way to look at it?'

This Toolkit empowers people to do just that - whether their title is entrepreneur, manager, consultant, (Vice-)President, CxO etc... - they are the people who rule the future. They are the person who asks the right questions to make Power network design (IC) investments work better.

This Power network design (IC) All-Inclusive Toolkit enables You to be that person.

 

Includes lifetime updates

Every self assessment comes with Lifetime Updates and Lifetime Free Updated Books. Lifetime Updates is an industry-first feature which allows you to receive verified self assessment updates, ensuring you always have the most accurate information at your fingertips.

46 Reviews Hide Reviews Show Reviews

  • 5
    DAVID S. Director Organisational performance

    Posted by DAVID S. on 6th Jul 2018

    Honestly - at the extremely low outlay - the capacity to accelerate your journey, increase productivity and be a more informed buyer (when combined with what actual business problems you are trying to solve) I would be extremely hard pressed to not undertake it.

  • 5
    The Honourable Ralph Goodale, Minister of Public Safety and Emergency Preparedness, Canada

    Posted by The Honourable Ralph Goodale, Minister of Public Safety and Emergency Preparedness, Canada on 6th Jul 2018

    I would like to extend my sincere appreciation. I would also like to thank you for your service in promoting business continuity practices. I wish you every success in your work.

  • 5
    Congrats! Very cool!

    Posted by Caryn B. on 5th Jul 2018

    Caryn B. Vice President Production

  • 5
    Your book is interesting and contains timely topics.

    Posted by Dianne L. on 4th Jul 2018

    DIANNE L Chief Learning Officer

  • 5
    Thank you. We will be offering your self assessment as a subject for our master students from autumn onwards.

    Posted by Christine R. on 4th Jul 2018

    Christine R. University Officer

  • 5
    The Self Assessment is deemed qualified, accurate and comprehensive as a Guidance that Incorporates the NIST Cybersecurity Framework.

    Posted by U.S. DEPARTMENT OF COMMERCE, NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY (NIST) on 4th Jul 2018

    U.S. DEPARTMENT OF COMMERCE, NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY (NIST)

  • 5
    Hi everybody, The book is amazing, I will read it deeper during my next holidays. Thanks and regards

    Posted by Diego P. on 3rd Jul 2018

    Diego P. Head of BDA Business Unit

  • 5
    Thank you! I have found a lot of great information in the text so far. I plan to use your book as one of our references as we build out our SDDC and gladly leave an online review.

    Posted by CRAIG T. on 3rd Jul 2018

    CRAIG T. Chief Technology Officer

  • 5
    Thank you for the excel dashboard. It is so powerful.

    Posted by TAHAR H. on 2nd Jul 2018

    TAHAR H. Researcher at Institute of Economic Analysis and Prospective Studies