Proof-of-work system Toolkit: best-practice templates, step-by-step work plans and maturity diagnostics

CNY1,770.46
(46 reviews) Write a Review
Availability:
Downloadable Resources, Instant Access

Save time, empower your teams and effectively upgrade your processes with access to this practical Proof-of-work system Toolkit and guide. Address common challenges with best-practice templates, step-by-step work plans and maturity diagnostics for any Proof-of-work system related project.

Download the Toolkit and in Three Steps you will be guided from idea to implementation results.

The Toolkit contains the following practical and powerful enablers with new and updated Proof-of-work system specific requirements:


STEP 1: Get your bearings

Start with...

  • The latest quick edition of the Proof-of-work system Self Assessment book in PDF containing 49 requirements to perform a quickscan, get an overview and share with stakeholders.

Organized in a data driven improvement cycle RDMAICS (Recognize, Define, Measure, Analyze, Improve, Control and Sustain), check the…

  • Example pre-filled Self-Assessment Excel Dashboard to get familiar with results generation

Then find your goals...


STEP 2: Set concrete goals, tasks, dates and numbers you can track

Featuring 636 new and updated case-based questions, organized into seven core areas of process design, this Self-Assessment will help you identify areas in which Proof-of-work system improvements can be made.

Examples; 10 of the 636 standard requirements:

  1. What are your key Proof-of-work system organizational performance measures, including key short and longer-term financial measures?

  2. Have benefits been optimized with all key stakeholders?

  3. Is there a Proof-of-work system Communication plan covering who needs to get what information when?

  4. Are documented procedures clear and easy to follow for the operators?

  5. How do we foster the skills, knowledge, talents, attributes, and characteristics we want to have?

  6. Is the team adequately staffed with the desired cross-functionality? If not, what additional resources are available to the team?

  7. Is there a limit on the number of users in Proof-of-work system ?

  8. How do you determine the key elements that affect Proof-of-work system workforce satisfaction? how are these elements determined for different workforce groups and segments?

  9. How do you identify and analyze stakeholders and their interests?

  10. How do your measurements capture actionable Proof-of-work system information for use in exceeding your customers expectations and securing your customers engagement?


Complete the self assessment, on your own or with a team in a workshop setting. Use the workbook together with the self assessment requirements spreadsheet:

  • The workbook is the latest in-depth complete edition of the Proof-of-work system book in PDF containing 636 requirements, which criteria correspond to the criteria in...

Your Proof-of-work system self-assessment dashboard which gives you your dynamically prioritized projects-ready tool and shows your organization exactly what to do next:

  • The Self-Assessment Excel Dashboard; with the Proof-of-work system Self-Assessment and Scorecard you will develop a clear picture of which Proof-of-work system areas need attention, which requirements you should focus on and who will be responsible for them:

    • Shows your organization instant insight in areas for improvement: Auto generates reports, radar chart for maturity assessment, insights per process and participant and bespoke, ready to use, RACI Matrix
    • Gives you a professional Dashboard to guide and perform a thorough Proof-of-work system Self-Assessment
    • Is secure: Ensures offline data protection of your Self-Assessment results
    • Dynamically prioritized projects-ready RACI Matrix shows your organization exactly what to do next:

 

STEP 3: Implement, Track, follow up and revise strategy

The outcomes of STEP 2, the self assessment, are the inputs for STEP 3; Start and manage Proof-of-work system projects with the 62 implementation resources:

  • 62 step-by-step Proof-of-work system Project Management Form Templates covering over 6000 Proof-of-work system project requirements and success criteria:

Examples; 10 of the check box criteria:

  1. Cost Management Plan: Is a payment system in place with proper reviews and approvals?

  2. Cost Management Plan: Are Proof-of-work system project team members involved in detailed estimating and scheduling?

  3. Risk Audit: What compliance systems do you have in place to address quality, errors, and outcomes?

  4. Stakeholder Management Plan: Which of the records created within the Proof-of-work system project, if any, does the Business Owner require access to?

  5. Stakeholder Management Plan: What is the general purpose in defining responsibilities of those affiliated with the Proof-of-work system project?

  6. Project or Phase Close-Out: What advantages do the an individual interview have over a group meeting, and vice-versa?

  7. Procurement Management Plan: What were things that you did well, but could improve, and how?

  8. Procurement Audit: Has the organization taken a well-grounded decision about the procurement procedure chosen and has it documented the process?

  9. Responsibility Assignment Matrix: Too many Rs: With too many people labeled as doing the work, are there too many hands involved?

  10. Project or Phase Close-Out: What stakeholder group needs, expectations, and interests are being met by the Proof-of-work system project?

 
Step-by-step and complete Proof-of-work system Project Management Forms and Templates including check box criteria and templates.

1.0 Initiating Process Group:

  • 1.1 Proof-of-work system project Charter
  • 1.2 Stakeholder Register
  • 1.3 Stakeholder Analysis Matrix


2.0 Planning Process Group:

  • 2.1 Proof-of-work system project Management Plan
  • 2.2 Scope Management Plan
  • 2.3 Requirements Management Plan
  • 2.4 Requirements Documentation
  • 2.5 Requirements Traceability Matrix
  • 2.6 Proof-of-work system project Scope Statement
  • 2.7 Assumption and Constraint Log
  • 2.8 Work Breakdown Structure
  • 2.9 WBS Dictionary
  • 2.10 Schedule Management Plan
  • 2.11 Activity List
  • 2.12 Activity Attributes
  • 2.13 Milestone List
  • 2.14 Network Diagram
  • 2.15 Activity Resource Requirements
  • 2.16 Resource Breakdown Structure
  • 2.17 Activity Duration Estimates
  • 2.18 Duration Estimating Worksheet
  • 2.19 Proof-of-work system project Schedule
  • 2.20 Cost Management Plan
  • 2.21 Activity Cost Estimates
  • 2.22 Cost Estimating Worksheet
  • 2.23 Cost Baseline
  • 2.24 Quality Management Plan
  • 2.25 Quality Metrics
  • 2.26 Process Improvement Plan
  • 2.27 Responsibility Assignment Matrix
  • 2.28 Roles and Responsibilities
  • 2.29 Human Resource Management Plan
  • 2.30 Communications Management Plan
  • 2.31 Risk Management Plan
  • 2.32 Risk Register
  • 2.33 Probability and Impact Assessment
  • 2.34 Probability and Impact Matrix
  • 2.35 Risk Data Sheet
  • 2.36 Procurement Management Plan
  • 2.37 Source Selection Criteria
  • 2.38 Stakeholder Management Plan
  • 2.39 Change Management Plan


3.0 Executing Process Group:

  • 3.1 Team Member Status Report
  • 3.2 Change Request
  • 3.3 Change Log
  • 3.4 Decision Log
  • 3.5 Quality Audit
  • 3.6 Team Directory
  • 3.7 Team Operating Agreement
  • 3.8 Team Performance Assessment
  • 3.9 Team Member Performance Assessment
  • 3.10 Issue Log


4.0 Monitoring and Controlling Process Group:

  • 4.1 Proof-of-work system project Performance Report
  • 4.2 Variance Analysis
  • 4.3 Earned Value Status
  • 4.4 Risk Audit
  • 4.5 Contractor Status Report
  • 4.6 Formal Acceptance


5.0 Closing Process Group:

  • 5.1 Procurement Audit
  • 5.2 Contract Close-Out
  • 5.3 Proof-of-work system project or Phase Close-Out
  • 5.4 Lessons Learned

 

Results

With this Three Step process you will have all the tools you need for any Proof-of-work system project with this in-depth Proof-of-work system Toolkit.

In using the Toolkit you will be better able to:

  • Diagnose Proof-of-work system projects, initiatives, organizations, businesses and processes using accepted diagnostic standards and practices
  • Implement evidence-based best practice strategies aligned with overall goals
  • Integrate recent advances in Proof-of-work system and put process design strategies into practice according to best practice guidelines

Defining, designing, creating, and implementing a process to solve a business challenge or meet a business objective is the most valuable role; In EVERY company, organization and department.

Unless you are talking a one-time, single-use project within a business, there should be a process. Whether that process is managed and implemented by humans, AI, or a combination of the two, it needs to be designed by someone with a complex enough perspective to ask the right questions. Someone capable of asking the right questions and step back and say, 'What are we really trying to accomplish here? And is there a different way to look at it?'

This Toolkit empowers people to do just that - whether their title is entrepreneur, manager, consultant, (Vice-)President, CxO etc... - they are the people who rule the future. They are the person who asks the right questions to make Proof-of-work system investments work better.

This Proof-of-work system All-Inclusive Toolkit enables You to be that person.

 

Includes lifetime updates

Every self assessment comes with Lifetime Updates and Lifetime Free Updated Books. Lifetime Updates is an industry-first feature which allows you to receive verified self assessment updates, ensuring you always have the most accurate information at your fingertips.

46 Reviews Hide Reviews Show Reviews

  • 5
    CARSTEN B. Experienced safety and quality enabler

    Posted by CARSTEN B. on 6th Sep 2018

    So far I have only had time to browse it very superficially, but form that it looks very comprehensive and at the same time practical. As soon as I find time I will do a short item on it on my literature pages and point risk management professionals in your direction. Have a great day, and all the best!!

  • 5
    DAVID S. Director Organisational performance

    Posted by DAVID S. on 6th Sep 2018

    Honestly - at the extremely low outlay - the capacity to accelerate your journey, increase productivity and be a more informed buyer (when combined with what actual business problems you are trying to solve) I would be extremely hard pressed to not undertake it.

  • 5
    Thank you, these are great!

    Posted by NATALIE F. on 5th Sep 2018

    NATALIE F. Healthcare Information Technology Consultant

  • 5
    MARIETTA W. Senior Consultant

    Posted by MARIETTA W. on 4th Sep 2018

    Standard Requirements is a straightforward guide. It is a tool to help develop a detailed vision of all areas impacted by an implementation, and a useful tool for scoring readiness and implementation quality.

  • 5
    Thank you for providing these valuable resources.

    Posted by HANS D. on 3rd Sep 2018

    HANS D. Integration & Solution Architect

  • 5
    ctmfile.com

    Posted by ctmfile.com on 2nd Sep 2018

    This is a structured, in-depth review and how to work out how develop the controls and processes that will begin to solve the problem. Knowing what questions to ask is the starting point. The level of questions and analysis required will surprise, but this level of details is essential.

  • 5
    Seems quite handy - going to start using it next month as we're investing quite a lot in it. This will define for us what to do in this space and solve a real problem (rather than chasing shiny objects).

    Posted by DAVIN B. on 2nd Sep 2018

    DAVIN B. Systems Manager

  • 5
    This is great! Thank you. Say, do you all do consulting or certification?

    Posted by KEN W. on 6th Aug 2018

    KEN W. Managing Director

  • 5
    I will use everything extensively to prepare for an audit scheduled in Dec and Jan for an important automotive customer.

    Posted by Bruno C. on 5th Aug 2018

    Bruno C. ICT Director