Skip to main content

Asset Relocation in Infrastructure Asset Management

$247.00
Who trusts this:
Trusted by professionals in 160+ countries
Toolkit Included:
Includes a practical, ready-to-use toolkit containing implementation templates, worksheets, checklists, and decision-support materials used to accelerate real-world application and reduce setup time.
When you get access:
Course access is prepared after purchase and delivered via email
Your guarantee:
30-day money-back guarantee — no questions asked
How you learn:
Self-paced • Lifetime updates
Adding to cart… The item has been added

What does the Asset Relocation in Infrastructure Asset Management course cover?

Asset Relocation in Infrastructure Asset Management is covered here in 8 modules: Strategic Assessment and Justification of Asset Relocation, Regulatory and Compliance Framework Integration, Engineering and Design Adaptation for New Sites and 5 more. The outline lists 48 specific topics, opening with evaluate total cost of ownership implications when relocating versus rehabilitating existing infrastructure, including long-term operational and maintenance impacts.

How do you approach Asset Relocation in Infrastructure Asset Management step by step?

The work is sequenced in 8 stages. It starts with Strategic Assessment and Justification of Asset Relocation, moves through Regulatory and Compliance Framework Integration and Engineering and Design Adaptation for New Sites, and ends at Financial and Lifecycle Management Implications. Each stage carries its own topic list, so the sequence is followed rather than summarised.

What is in Module 1 of the Asset Relocation in Infrastructure Asset Management course?

Module 1 is Strategic Assessment and Justification of Asset Relocation. It works through evaluate total cost of ownership implications when relocating versus rehabilitating existing infrastructure, including long-term operational and maintenance impacts., conduct stakeholder impact analysis to identify disruptions to service delivery, regulatory obligations, and community access during and after relocation., assess alignment with long-range capital improvement plans and organizational asset management policies.

How is the Asset Relocation in Infrastructure Asset Management course delivered?

The Asset Relocation in Infrastructure Asset Management course is fully self-paced with immediate online access after enrolment. Access does not expire and future updates are included at no cost. It can be taken on any device, and a certificate of completion is issued by The Art of Service when you finish.

How much does the Asset Relocation in Infrastructure Asset Management course cost?

The Asset Relocation in Infrastructure Asset Management course is $248 as a one time payment. There is no subscription, no per seat licence and no hidden fee. Enrolment carries a 30 day satisfied or refunded guarantee, so it can be assessed in full before you commit.

Closely related courses: Asset Renewal in Infrastructure Asset Management, Asset Allocation in Infrastructure Asset Management, Asset Inspections in Infrastructure Asset Management, Asset Enhancement in Infrastructure Asset Management.

More answers: what you get with every course, refund policy, all help answers.

This curriculum spans the full lifecycle of infrastructure asset relocation, equivalent in scope to a multi-phase advisory engagement involving strategic justification, regulatory coordination, engineering adaptation, and financial recalibration across interconnected organizational functions.

Module 1: Strategic Assessment and Justification of Asset Relocation

  • Evaluate total cost of ownership implications when relocating versus rehabilitating existing infrastructure, including long-term operational and maintenance impacts.
  • Conduct stakeholder impact analysis to identify disruptions to service delivery, regulatory obligations, and community access during and after relocation.
  • Assess alignment with long-range capital improvement plans and organizational asset management policies to ensure strategic coherence.
  • Perform risk-based screening of candidate assets using condition, criticality, and exposure to external threats (e.g., climate, seismic activity).
  • Determine regulatory triggers that require environmental review, public consultation, or permitting when moving assets across jurisdictions or land types.
  • Document decision rationale to support audit trails, funding approvals, and future governance reviews, particularly for publicly funded projects.

Module 2: Regulatory and Compliance Framework Integration

  • Identify applicable zoning, land use, and environmental regulations that constrain relocation options in urban, rural, or protected areas.
  • Negotiate rights-of-way and easements with private landowners, utility companies, or government agencies for new asset corridors.
  • Coordinate with environmental agencies to address impacts on wetlands, endangered species, or water resources during relocation.
  • Ensure compliance with accessibility standards (e.g., ADA, ISO 21542) when relocating public infrastructure such as transit stops or pedestrian pathways.
  • Validate adherence to industry-specific codes (e.g., ASCE, AASHTO, API) in the design and placement of relocated assets.
  • Manage interagency reporting requirements and documentation timelines to avoid project delays due to noncompliance.

Module 3: Engineering and Design Adaptation for New Sites

  • Redesign asset interfaces to accommodate changes in elevation, soil composition, or utility interconnections at the new location.
  • Modify load-bearing specifications and materials based on updated environmental stressors such as wind, flood, or traffic loads.
  • Integrate legacy system compatibility requirements when connecting relocated assets to existing networks (e.g., pipe diameters, voltage levels).
  • Conduct constructability reviews to assess access, staging areas, and crane placement for heavy asset movement.
  • Update geospatial references and as-built documentation to reflect precise positioning and alignment in the new site.
  • Validate design resilience under failure scenarios, including cascading impacts on dependent systems.

Module 4: Stakeholder Engagement and Change Management

  • Develop targeted communication plans for internal teams, regulators, and the public to manage expectations and reduce resistance.
  • Coordinate service interruption schedules with emergency services, hospitals, and critical businesses dependent on the asset.
  • Address community concerns about noise, traffic, or visual impact during relocation through mitigation commitments and monitoring.
  • Engage labor representatives early to negotiate work assignments, overtime, and safety protocols during transition phases.
  • Establish feedback loops with end-users to capture operational issues post-relocation and adjust performance metrics.
  • Manage interdepartmental dependencies by aligning relocation timelines with IT, procurement, and maintenance calendars.

Module 5: Logistics, Mobilization, and Physical Relocation

  • Plan phased shutdown and isolation procedures to safely disconnect assets without disrupting adjacent system operations.
  • Contract specialized transport and lifting equipment based on asset weight, dimensions, and fragility (e.g., transformers, pipelines).
  • Sequence relocation activities to minimize downtime, particularly for mission-critical infrastructure like water or power systems.
  • Implement real-time tracking of asset movement using GPS and RFID to maintain chain-of-custody and security.
  • Prepare temporary bypass systems or redundancy measures to maintain service continuity during physical transfer.
  • Conduct pre-mobilization site inspections to confirm ground conditions, access routes, and safety clearances are adequate.

Module 6: Integration and Commissioning of Relocated Assets

  • Perform functional testing and load trials to verify performance specifications are met after reinstallation.
  • Update asset management systems with new location, orientation, connection points, and maintenance access routes.
  • Reconfigure monitoring and control systems (e.g., SCADA, BMS) to reflect new asset positions and operational parameters.
  • Validate integration with upstream and downstream assets to prevent bottlenecks or compatibility failures.
  • Conduct safety sign-off procedures involving operations, safety officers, and external inspectors before full reactivation.
  • Document anomalies observed during commissioning and initiate corrective actions before handover to operations teams.

Module 7: Post-Relocation Performance Monitoring and Governance

  • Establish KPIs to track reliability, efficiency, and maintenance frequency of the relocated asset over a 12–24 month period.
  • Compare actual performance against pre-relocation projections to assess return on investment and decision accuracy.
  • Update risk registers and failure mode analyses to reflect new exposure profiles at the relocated site.
  • Conduct post-implementation review with cross-functional teams to capture lessons learned and process improvements.
  • Archive project records, including permits, inspection reports, and change orders, for compliance and future audits.
  • Adjust asset lifecycle models and depreciation schedules in financial systems to account for relocation-induced service life changes.

Module 8: Financial and Lifecycle Management Implications

  • Reassess depreciation and book value adjustments in alignment with accounting standards (e.g., IFRS, GASB) post-relocation.
  • Model long-term operational cost shifts due to changes in energy consumption, access difficulty, or environmental exposure.
  • Allocate shared relocation costs across departments or funding sources based on usage and benefit distribution.
  • Update insurance policies to reflect new risk profiles, location hazards, and replacement values of relocated assets.
  • Factor in residual value estimates when planning future disposal or further relocation of the asset.
  • Integrate relocation costs into the organization’s capital planning cycle to avoid budget misalignment in subsequent years.