Here is the honest situation. The Seveso III Directive controls major-accident hazards involving dangerous substances at industrial establishments, classifying them lower or upper tier by the quantities held. It requires notification, a major accident prevention policy and, especially at upper tier, a safety management system and safety report, systematic hazard identification, management of modifications, cooperation on domino effects, input to land-use planning, internal and external emergency plans that are tested, public information, cooperation with inspections and major accident reporting. Building that and evidencing it to the competent authority is a major program, and an establishment with an out-of-date substance inventory or untested emergency plans is exactly where establishments fall short.
This Kit removes the guesswork. It is every Seveso III obligation written as an adopt-ready control you personalize in a weekend, with the evidence the competent authority examines.
What you get, the moment you buy
Grounded in the Seveso III Directive (Directive 2012/18/EU), with the establishment tiers and notification, the major accident prevention policy and safety management system, the safety report, domino effects and land-use planning, internal and external emergency plans and public information called out. Editable Word and Excel files.
What one control looks like
This is determining Seveso applicability and the establishment tier, where compliance begins. All 18 are built to this depth.
Why this is not another template pack
- The evidence is the point. A control you cannot evidence is exposure to the competent authority. This tells you what is examined and where establishments fall short, for every obligation.
- Prevention, safety report and emergency plans built in. The major accident prevention policy, the safety report and the tested emergency plans are written into the controls, the substance the Directive requires.
- Built on a mapped compliance corpus, not one person's opinion, from a graph of thousands of controls across standards.
- It compounds. Seveso III connects to occupational safety, environmental permits and land-use planning, so this work feeds your wider industrial safety program.
Who buys this
Operators of establishments holding dangerous substances at Seveso quantities, and the safety, environmental, engineering and compliance leads who own major accident control. Whether it is a first assessment or a safety report update, you save weeks and walk in with the prevention policy, safety report and emergency plans structured.
Common questions
Is it really editable? Yes. Word and Excel files you own and adapt. No portal, no subscription.
Does it cover the safety report? Yes. Producing and reviewing the upper-tier safety report is its own control group.
Does it cover emergency planning? Yes. Internal and external emergency plans and their testing are built as controls.
Does it cover domino effects? Yes. Cooperation where domino effects are possible and land-use planning input are built as controls.
What if it is not for me? A 30-day money-back guarantee.
Instant digital download · 30-day money-back guarantee · The Art of Service Pty Ltd, GPO Box 2673, Brisbane QLD 4001 · support@theartofservice.com