Complex Projects Contract Toolkit: best-practice templates, step-by-step work plans and maturity diagnostics

$249.00
(46 reviews) Write a Review
Availability:
Downloadable Resources, Instant Access

Save time, empower your teams and effectively upgrade your processes with access to this practical Complex Projects Contract Toolkit and guide. Address common challenges with best-practice templates, step-by-step work plans and maturity diagnostics for any Complex Projects Contract related project.

Download the Toolkit and in Three Steps you will be guided from idea to implementation results.

The Toolkit contains the following practical and powerful enablers with new and updated Complex Projects Contract specific requirements:


STEP 1: Get your bearings

Start with...

  • The latest quick edition of the Complex Projects Contract Self Assessment book in PDF containing 49 requirements to perform a quickscan, get an overview and share with stakeholders.

Organized in a data driven improvement cycle RDMAICS (Recognize, Define, Measure, Analyze, Improve, Control and Sustain), check the…

  • Example pre-filled Self-Assessment Excel Dashboard to get familiar with results generation

Then find your goals...


STEP 2: Set concrete goals, tasks, dates and numbers you can track

Featuring new and updated case-based questions, organized into seven core areas of process design, this Self-Assessment will help you identify areas in which Complex Projects Contract improvements can be made.

Examples; 10 of the standard requirements:

  1. Is there any existing Complex Projects Contract governance structure?

  2. What training and capacity building actions are needed to implement proposed reforms?

  3. Is the scope of Complex Projects Contract defined?

  4. Think about the people you identified for your Complex Projects Contract project and the project responsibilities you would assign to them. what kind of training do you think they would need to perform these responsibilities effectively?

  5. Is this an issue for analysis or intuition?

  6. Are assumptions made in Complex Projects Contract stated explicitly?

  7. How significant is the improvement in the eyes of the end user?

  8. Why do we need to keep records?

  9. How did the team generate the list of possible solutions?

  10. How often are the team meetings?


Complete the self assessment, on your own or with a team in a workshop setting. Use the workbook together with the self assessment requirements spreadsheet:

  • The workbook is the latest in-depth complete edition of the Complex Projects Contract book in PDF containing requirements, which criteria correspond to the criteria in...

Your Complex Projects Contract self-assessment dashboard which gives you your dynamically prioritized projects-ready tool and shows your organization exactly what to do next:

  • The Self-Assessment Excel Dashboard; with the Complex Projects Contract Self-Assessment and Scorecard you will develop a clear picture of which Complex Projects Contract areas need attention, which requirements you should focus on and who will be responsible for them:

    • Shows your organization instant insight in areas for improvement: Auto generates reports, radar chart for maturity assessment, insights per process and participant and bespoke, ready to use, RACI Matrix
    • Gives you a professional Dashboard to guide and perform a thorough Complex Projects Contract Self-Assessment
    • Is secure: Ensures offline data protection of your Self-Assessment results
    • Dynamically prioritized projects-ready RACI Matrix shows your organization exactly what to do next:

 

STEP 3: Implement, Track, follow up and revise strategy

The outcomes of STEP 2, the self assessment, are the inputs for STEP 3; Start and manage Complex Projects Contract projects with the 62 implementation resources:

  • 62 step-by-step Complex Projects Contract Project Management Form Templates covering over 6000 Complex Projects Contract project requirements and success criteria:

Examples; 10 of the check box criteria:

  1. Schedule Management Plan: What s the difference between % Complete and % work?

  2. Procurement Audit: Was the pre-qualification screening for issue of tender documents done properly and in a fair manner?

  3. Probability and Impact Matrix: What is the industrial relations prevailing in this organization?

  4. Quality Metrics: Where did complaints, returns and warranty claims come from?

  5. Cost Baseline: Is the requested change request a result of changes in other Complex Projects Contract project(s)?

  6. WBS Dictionary: Does the contractors system provide unit costs, equivalent unit or lot costs in terms of labor, material, other direct, and indirect costs?

  7. Stakeholder Management Plan: Are staff skills known and available for each task?

  8. Project Performance Report: To what degree are the demands of the task compatible with and converge with the relationships of the informal organization?

  9. Human Resource Management Plan: Do Complex Projects Contract project managers participating in the Complex Projects Contract project know the Complex Projects Contract projects true status first hand?

  10. Probability and Impact Matrix: How do risks change during the Complex Projects Contract projects life cycle?

 
Step-by-step and complete Complex Projects Contract Project Management Forms and Templates including check box criteria and templates.

1.0 Initiating Process Group:

  • 1.1 Complex Projects Contract project Charter
  • 1.2 Stakeholder Register
  • 1.3 Stakeholder Analysis Matrix


2.0 Planning Process Group:

  • 2.1 Complex Projects Contract project Management Plan
  • 2.2 Scope Management Plan
  • 2.3 Requirements Management Plan
  • 2.4 Requirements Documentation
  • 2.5 Requirements Traceability Matrix
  • 2.6 Complex Projects Contract project Scope Statement
  • 2.7 Assumption and Constraint Log
  • 2.8 Work Breakdown Structure
  • 2.9 WBS Dictionary
  • 2.10 Schedule Management Plan
  • 2.11 Activity List
  • 2.12 Activity Attributes
  • 2.13 Milestone List
  • 2.14 Network Diagram
  • 2.15 Activity Resource Requirements
  • 2.16 Resource Breakdown Structure
  • 2.17 Activity Duration Estimates
  • 2.18 Duration Estimating Worksheet
  • 2.19 Complex Projects Contract project Schedule
  • 2.20 Cost Management Plan
  • 2.21 Activity Cost Estimates
  • 2.22 Cost Estimating Worksheet
  • 2.23 Cost Baseline
  • 2.24 Quality Management Plan
  • 2.25 Quality Metrics
  • 2.26 Process Improvement Plan
  • 2.27 Responsibility Assignment Matrix
  • 2.28 Roles and Responsibilities
  • 2.29 Human Resource Management Plan
  • 2.30 Communications Management Plan
  • 2.31 Risk Management Plan
  • 2.32 Risk Register
  • 2.33 Probability and Impact Assessment
  • 2.34 Probability and Impact Matrix
  • 2.35 Risk Data Sheet
  • 2.36 Procurement Management Plan
  • 2.37 Source Selection Criteria
  • 2.38 Stakeholder Management Plan
  • 2.39 Change Management Plan


3.0 Executing Process Group:

  • 3.1 Team Member Status Report
  • 3.2 Change Request
  • 3.3 Change Log
  • 3.4 Decision Log
  • 3.5 Quality Audit
  • 3.6 Team Directory
  • 3.7 Team Operating Agreement
  • 3.8 Team Performance Assessment
  • 3.9 Team Member Performance Assessment
  • 3.10 Issue Log


4.0 Monitoring and Controlling Process Group:

  • 4.1 Complex Projects Contract project Performance Report
  • 4.2 Variance Analysis
  • 4.3 Earned Value Status
  • 4.4 Risk Audit
  • 4.5 Contractor Status Report
  • 4.6 Formal Acceptance


5.0 Closing Process Group:

  • 5.1 Procurement Audit
  • 5.2 Contract Close-Out
  • 5.3 Complex Projects Contract project or Phase Close-Out
  • 5.4 Lessons Learned

 

Results

With this Three Step process you will have all the tools you need for any Complex Projects Contract project with this in-depth Complex Projects Contract Toolkit.

In using the Toolkit you will be better able to:

  • Diagnose Complex Projects Contract projects, initiatives, organizations, businesses and processes using accepted diagnostic standards and practices
  • Implement evidence-based best practice strategies aligned with overall goals
  • Integrate recent advances in Complex Projects Contract and put process design strategies into practice according to best practice guidelines

Defining, designing, creating, and implementing a process to solve a business challenge or meet a business objective is the most valuable role; In EVERY company, organization and department.

Unless you are talking a one-time, single-use project within a business, there should be a process. Whether that process is managed and implemented by humans, AI, or a combination of the two, it needs to be designed by someone with a complex enough perspective to ask the right questions. Someone capable of asking the right questions and step back and say, 'What are we really trying to accomplish here? And is there a different way to look at it?'

This Toolkit empowers people to do just that - whether their title is entrepreneur, manager, consultant, (Vice-)President, CxO etc... - they are the people who rule the future. They are the person who asks the right questions to make Complex Projects Contract investments work better.

This Complex Projects Contract All-Inclusive Toolkit enables You to be that person.

 

Includes lifetime updates

Every self assessment comes with Lifetime Updates and Lifetime Free Updated Books. Lifetime Updates is an industry-first feature which allows you to receive verified self assessment updates, ensuring you always have the most accurate information at your fingertips.

46 Reviews Hide Reviews Show Reviews

  • 5
    Thank you. We will be offering your self assessment as a subject for our master students from autumn onwards.

    Posted by Christine R. on 5th Sep 2018

    Christine R. University Officer

  • 5
    The subject is new to me and am sure the resources along with suggested methodology would help me in my pursuit.

    Posted by Ravi P. on 4th Sep 2018

    Ravi P. Senior Consultant Big 5

  • 5
    I have been looking at the document, and it is quite extensive.

    Posted by PENGILLY W. on 3rd Sep 2018

    PENGILLY W. Director IT & Logistics at a leading University

  • 5
    Man, thanks again for sharing. Really a life saver! Greetings!

    Posted by DAAN C on 2nd Sep 2018

    DAAN C Senior Consultant

  • 5
    I look forward to becoming more familiar with the material and conducting the survey with my employer. So far it looks very comprehensive. Thank you.

    Posted by RON F. on 5th Aug 2018

    RON F. Director Analytics Governance

  • 5
    This is awesome. Thank you very much.

    Posted by Dr. Martin K. on 5th Aug 2018

    Dr. Martin K. CEO

  • 5
    Thanks for this; a lot of work has gone into developing and producing this, I am looking forward to using it in the coming weeks.

    Posted by DR STEVEN.B. on 5th Aug 2018

    DR STEVEN.B. Head of Information Security & Assurance

  • 5
    Spot on, thank you. Will study your book to help my clients.

    Posted by WALTER H. on 2nd Aug 2018

    WALTER H. Business Coach

  • 5
    CARSTEN B. Experienced safety and quality enabler

    Posted by CARSTEN B. on 2nd Aug 2018

    So far I have only had time to browse it very superficially, but form that it looks very comprehensive and at the same time practical. As soon as I find time I will do a short item on it on my literature pages and point risk management professionals in your direction. Have a great day, and all the best!!