Information Awareness Office Toolkit: best-practice templates, step-by-step work plans and maturity diagnostics

$249.00
(46 reviews) Write a Review
Availability:
Downloadable Resources, Instant Access

Save time, empower your teams and effectively upgrade your processes with access to this practical Information Awareness Office Toolkit and guide. Address common challenges with best-practice templates, step-by-step work plans and maturity diagnostics for any Information Awareness Office related project.

Download the Toolkit and in Three Steps you will be guided from idea to implementation results.

The Toolkit contains the following practical and powerful enablers with new and updated Information Awareness Office specific requirements:


STEP 1: Get your bearings

Start with...

  • The latest quick edition of the Information Awareness Office Self Assessment book in PDF containing 49 requirements to perform a quickscan, get an overview and share with stakeholders.

Organized in a data driven improvement cycle RDMAICS (Recognize, Define, Measure, Analyze, Improve, Control and Sustain), check the…

  • Example pre-filled Self-Assessment Excel Dashboard to get familiar with results generation

Then find your goals...


STEP 2: Set concrete goals, tasks, dates and numbers you can track

Featuring new and updated case-based questions, organized into seven core areas of process design, this Self-Assessment will help you identify areas in which Information Awareness Office improvements can be made.

Examples; 10 of the standard requirements:

  1. What is the risk?

  2. What are the short and long-term Information Awareness Office goals?

  3. Who are the people involved in developing and implementing Information Awareness Office?

  4. Do you know what you are doing? And who do you call if you dont?

  5. How do we ensure that implementations of Information Awareness Office products are done in a way that ensures safety?

  6. What did the team gain from developing a sub-process map?

  7. What are your key performance measures or indicators and in-process measures for the control and improvement of your Information Awareness Office processes?

  8. What communications are necessary to support the implementation of the solution?

  9. What are the agreed upon definitions of the high impact areas, defect(s), unit(s), and opportunities that will figure into the process capability metrics?

  10. What to measure and why?


Complete the self assessment, on your own or with a team in a workshop setting. Use the workbook together with the self assessment requirements spreadsheet:

  • The workbook is the latest in-depth complete edition of the Information Awareness Office book in PDF containing requirements, which criteria correspond to the criteria in...

Your Information Awareness Office self-assessment dashboard which gives you your dynamically prioritized projects-ready tool and shows your organization exactly what to do next:

  • The Self-Assessment Excel Dashboard; with the Information Awareness Office Self-Assessment and Scorecard you will develop a clear picture of which Information Awareness Office areas need attention, which requirements you should focus on and who will be responsible for them:

    • Shows your organization instant insight in areas for improvement: Auto generates reports, radar chart for maturity assessment, insights per process and participant and bespoke, ready to use, RACI Matrix
    • Gives you a professional Dashboard to guide and perform a thorough Information Awareness Office Self-Assessment
    • Is secure: Ensures offline data protection of your Self-Assessment results
    • Dynamically prioritized projects-ready RACI Matrix shows your organization exactly what to do next:

 

STEP 3: Implement, Track, follow up and revise strategy

The outcomes of STEP 2, the self assessment, are the inputs for STEP 3; Start and manage Information Awareness Office projects with the 62 implementation resources:

  • 62 step-by-step Information Awareness Office Project Management Form Templates covering over 6000 Information Awareness Office project requirements and success criteria:

Examples; 10 of the check box criteria:

  1. Source Selection Criteria: What instructions should be provided regarding oral presentations?

  2. Scope Management Plan: Are the Information Awareness Office project team members located locally to the users/stakeholders?

  3. Schedule Management Plan: Are non-critical path items updated and agreed upon with the teams?

  4. Human Resource Management Plan: Are people motivated to meet the current and future challenges?

  5. Probability and Impact Assessment: Risks should be identified during which phase of Information Awareness Office project management life cycle?

  6. Requirements Management Plan: Is the system software (non-operating system) new to the IT Information Awareness Office project team?

  7. Change Management Plan: Do the proposed users have access to the appropriate documentation?

  8. Variance Analysis: Budget versus Actual. How does the monthly budget compare to actual experience?

  9. Scope Management Plan: Are enough systems & user personnel assigned to the Information Awareness Office project?

  10. Activity Duration Estimates: Is a standard form used to obtain bids and proposals from prospective sellers?

 
Step-by-step and complete Information Awareness Office Project Management Forms and Templates including check box criteria and templates.

1.0 Initiating Process Group:

  • 1.1 Information Awareness Office project Charter
  • 1.2 Stakeholder Register
  • 1.3 Stakeholder Analysis Matrix


2.0 Planning Process Group:

  • 2.1 Information Awareness Office project Management Plan
  • 2.2 Scope Management Plan
  • 2.3 Requirements Management Plan
  • 2.4 Requirements Documentation
  • 2.5 Requirements Traceability Matrix
  • 2.6 Information Awareness Office project Scope Statement
  • 2.7 Assumption and Constraint Log
  • 2.8 Work Breakdown Structure
  • 2.9 WBS Dictionary
  • 2.10 Schedule Management Plan
  • 2.11 Activity List
  • 2.12 Activity Attributes
  • 2.13 Milestone List
  • 2.14 Network Diagram
  • 2.15 Activity Resource Requirements
  • 2.16 Resource Breakdown Structure
  • 2.17 Activity Duration Estimates
  • 2.18 Duration Estimating Worksheet
  • 2.19 Information Awareness Office project Schedule
  • 2.20 Cost Management Plan
  • 2.21 Activity Cost Estimates
  • 2.22 Cost Estimating Worksheet
  • 2.23 Cost Baseline
  • 2.24 Quality Management Plan
  • 2.25 Quality Metrics
  • 2.26 Process Improvement Plan
  • 2.27 Responsibility Assignment Matrix
  • 2.28 Roles and Responsibilities
  • 2.29 Human Resource Management Plan
  • 2.30 Communications Management Plan
  • 2.31 Risk Management Plan
  • 2.32 Risk Register
  • 2.33 Probability and Impact Assessment
  • 2.34 Probability and Impact Matrix
  • 2.35 Risk Data Sheet
  • 2.36 Procurement Management Plan
  • 2.37 Source Selection Criteria
  • 2.38 Stakeholder Management Plan
  • 2.39 Change Management Plan


3.0 Executing Process Group:

  • 3.1 Team Member Status Report
  • 3.2 Change Request
  • 3.3 Change Log
  • 3.4 Decision Log
  • 3.5 Quality Audit
  • 3.6 Team Directory
  • 3.7 Team Operating Agreement
  • 3.8 Team Performance Assessment
  • 3.9 Team Member Performance Assessment
  • 3.10 Issue Log


4.0 Monitoring and Controlling Process Group:

  • 4.1 Information Awareness Office project Performance Report
  • 4.2 Variance Analysis
  • 4.3 Earned Value Status
  • 4.4 Risk Audit
  • 4.5 Contractor Status Report
  • 4.6 Formal Acceptance


5.0 Closing Process Group:

  • 5.1 Procurement Audit
  • 5.2 Contract Close-Out
  • 5.3 Information Awareness Office project or Phase Close-Out
  • 5.4 Lessons Learned

 

Results

With this Three Step process you will have all the tools you need for any Information Awareness Office project with this in-depth Information Awareness Office Toolkit.

In using the Toolkit you will be better able to:

  • Diagnose Information Awareness Office projects, initiatives, organizations, businesses and processes using accepted diagnostic standards and practices
  • Implement evidence-based best practice strategies aligned with overall goals
  • Integrate recent advances in Information Awareness Office and put process design strategies into practice according to best practice guidelines

Defining, designing, creating, and implementing a process to solve a business challenge or meet a business objective is the most valuable role; In EVERY company, organization and department.

Unless you are talking a one-time, single-use project within a business, there should be a process. Whether that process is managed and implemented by humans, AI, or a combination of the two, it needs to be designed by someone with a complex enough perspective to ask the right questions. Someone capable of asking the right questions and step back and say, 'What are we really trying to accomplish here? And is there a different way to look at it?'

This Toolkit empowers people to do just that - whether their title is entrepreneur, manager, consultant, (Vice-)President, CxO etc... - they are the people who rule the future. They are the person who asks the right questions to make Information Awareness Office investments work better.

This Information Awareness Office All-Inclusive Toolkit enables You to be that person.

 

Includes lifetime updates

Every self assessment comes with Lifetime Updates and Lifetime Free Updated Books. Lifetime Updates is an industry-first feature which allows you to receive verified self assessment updates, ensuring you always have the most accurate information at your fingertips.

46 Reviews Hide Reviews Show Reviews

  • 5
    Man, thanks again for sharing. Really a life saver! Greetings!

    Posted by DAAN C on 3rd Sep 2018

    DAAN C Senior Consultant

  • 5
    The subject is new to me and am sure the resources along with suggested methodology would help me in my pursuit.

    Posted by Ravi P. on 3rd Sep 2018

    Ravi P. Senior Consultant Big 5

  • 5
    This is awesome. Thank you very much.

    Posted by Dr. Martin K. on 3rd Sep 2018

    Dr. Martin K. CEO

  • 5
    Thank you, these are great!

    Posted by NATALIE F. on 5th Aug 2018

    NATALIE F. Healthcare Information Technology Consultant

  • 5
    Great initiative and timing to release the requirements! And thanks a lot for sharing it with us!

    Posted by Pierre V. on 5th Aug 2018

    Pierre V. B2B Product & Content Marketing

  • 5
    ctmfile.com

    Posted by ctmfile.com on 5th Aug 2018

    This is a structured, in-depth review and how to work out how develop the controls and processes that will begin to solve the problem. Knowing what questions to ask is the starting point. The level of questions and analysis required will surprise, but this level of details is essential.

  • 5
    This is great! Thank you. Say, do you all do consulting or certification?

    Posted by KEN W. on 4th Aug 2018

    KEN W. Managing Director

  • 5
    MARIETTA W. Senior Consultant

    Posted by MARIETTA W. on 4th Aug 2018

    Standard Requirements is a straightforward guide. It is a tool to help develop a detailed vision of all areas impacted by an implementation, and a useful tool for scoring readiness and implementation quality.

  • 5
    Thank you so much... Hope to visit Australia someday. Smart IT people... 5 star review.

    Posted by ELLEN C. on 4th Aug 2018

    ELLEN C. Enterprise Innovation: Business & Information Technology Strategist