Memory architecture Toolkit: best-practice templates, step-by-step work plans and maturity diagnostics

$249.00
(46 reviews) Write a Review
Availability:
Downloadable Resources, Instant Access

Save time, empower your teams and effectively upgrade your processes with access to this practical Memory architecture Toolkit and guide. Address common challenges with best-practice templates, step-by-step work plans and maturity diagnostics for any Memory architecture related project.

Download the Toolkit and in Three Steps you will be guided from idea to implementation results.

The Toolkit contains the following practical and powerful enablers with new and updated Memory architecture specific requirements:


STEP 1: Get your bearings

Start with...

  • The latest quick edition of the Memory architecture Self Assessment book in PDF containing 49 requirements to perform a quickscan, get an overview and share with stakeholders.

Organized in a data driven improvement cycle RDMAICS (Recognize, Define, Measure, Analyze, Improve, Control and Sustain), check the…

  • Example pre-filled Self-Assessment Excel Dashboard to get familiar with results generation

Then find your goals...


STEP 2: Set concrete goals, tasks, dates and numbers you can track

Featuring new and updated case-based questions, organized into seven core areas of process design, this Self-Assessment will help you identify areas in which Memory architecture improvements can be made.

Examples; 10 of the standard requirements:

  1. Implementation Planning- is a pilot needed to test the changes before a full roll out occurs?

  2. Have the customer needs been translated into specific, measurable requirements? How?

  3. What are specific Memory architecture Rules to follow?

  4. What are the short and long-term Memory architecture goals?

  5. How do we do risk analysis of rare, cascading, catastrophic events?

  6. Are suggested corrective/restorative actions indicated on the response plan for known causes to problems that might surface?

  7. Is there any reason to believe the opposite of my current belief?

  8. Is there a critical path to deliver Memory architecture results?

  9. Are process variation components displayed/communicated using suitable charts, graphs, plots?

  10. What new services of functionality will be implemented next with Memory architecture ?


Complete the self assessment, on your own or with a team in a workshop setting. Use the workbook together with the self assessment requirements spreadsheet:

  • The workbook is the latest in-depth complete edition of the Memory architecture book in PDF containing requirements, which criteria correspond to the criteria in...

Your Memory architecture self-assessment dashboard which gives you your dynamically prioritized projects-ready tool and shows your organization exactly what to do next:

  • The Self-Assessment Excel Dashboard; with the Memory architecture Self-Assessment and Scorecard you will develop a clear picture of which Memory architecture areas need attention, which requirements you should focus on and who will be responsible for them:

    • Shows your organization instant insight in areas for improvement: Auto generates reports, radar chart for maturity assessment, insights per process and participant and bespoke, ready to use, RACI Matrix
    • Gives you a professional Dashboard to guide and perform a thorough Memory architecture Self-Assessment
    • Is secure: Ensures offline data protection of your Self-Assessment results
    • Dynamically prioritized projects-ready RACI Matrix shows your organization exactly what to do next:

 

STEP 3: Implement, Track, follow up and revise strategy

The outcomes of STEP 2, the self assessment, are the inputs for STEP 3; Start and manage Memory architecture projects with the 62 implementation resources:

  • 62 step-by-step Memory architecture Project Management Form Templates covering over 6000 Memory architecture project requirements and success criteria:

Examples; 10 of the check box criteria:

  1. Responsibility Assignment Matrix: Identify and isolate causes of favorable and unfavorable cost and schedule variances?

  2. Human Resource Management Plan: Are Memory architecture project team members involved in detailed estimating and scheduling?

  3. Project Schedule: To what degree is do you feel the entire team was committed to the Memory architecture project schedule?

  4. Project Portfolio management: How does the organization ensure that Memory architecture project and program benefits and risks are being managed to optimize the overall value creation from the portfolio?

  5. WBS Dictionary: Intermediate schedules, as required, which provide a logical sequence from the master schedule to the control account level?

  6. Procurement Audit: Is there a record maintained of the procedures followed in the opening of tenders together with the reasons for the acceptance or rejection of tenders received?

  7. WBS Dictionary: All CWBS elements specified for external reporting?

  8. Schedule Management Plan: Were stakeholders aware and supportive of the principles and practices of modern software estimation?

  9. Variance Analysis: Are there knowledgeable Memory architecture projections of future performance?

  10. Project Management Plan: Are there any scope changes proposed for a previously authorized Memory architecture project?

 
Step-by-step and complete Memory architecture Project Management Forms and Templates including check box criteria and templates.

1.0 Initiating Process Group:

  • 1.1 Memory architecture project Charter
  • 1.2 Stakeholder Register
  • 1.3 Stakeholder Analysis Matrix


2.0 Planning Process Group:

  • 2.1 Memory architecture project Management Plan
  • 2.2 Scope Management Plan
  • 2.3 Requirements Management Plan
  • 2.4 Requirements Documentation
  • 2.5 Requirements Traceability Matrix
  • 2.6 Memory architecture project Scope Statement
  • 2.7 Assumption and Constraint Log
  • 2.8 Work Breakdown Structure
  • 2.9 WBS Dictionary
  • 2.10 Schedule Management Plan
  • 2.11 Activity List
  • 2.12 Activity Attributes
  • 2.13 Milestone List
  • 2.14 Network Diagram
  • 2.15 Activity Resource Requirements
  • 2.16 Resource Breakdown Structure
  • 2.17 Activity Duration Estimates
  • 2.18 Duration Estimating Worksheet
  • 2.19 Memory architecture project Schedule
  • 2.20 Cost Management Plan
  • 2.21 Activity Cost Estimates
  • 2.22 Cost Estimating Worksheet
  • 2.23 Cost Baseline
  • 2.24 Quality Management Plan
  • 2.25 Quality Metrics
  • 2.26 Process Improvement Plan
  • 2.27 Responsibility Assignment Matrix
  • 2.28 Roles and Responsibilities
  • 2.29 Human Resource Management Plan
  • 2.30 Communications Management Plan
  • 2.31 Risk Management Plan
  • 2.32 Risk Register
  • 2.33 Probability and Impact Assessment
  • 2.34 Probability and Impact Matrix
  • 2.35 Risk Data Sheet
  • 2.36 Procurement Management Plan
  • 2.37 Source Selection Criteria
  • 2.38 Stakeholder Management Plan
  • 2.39 Change Management Plan


3.0 Executing Process Group:

  • 3.1 Team Member Status Report
  • 3.2 Change Request
  • 3.3 Change Log
  • 3.4 Decision Log
  • 3.5 Quality Audit
  • 3.6 Team Directory
  • 3.7 Team Operating Agreement
  • 3.8 Team Performance Assessment
  • 3.9 Team Member Performance Assessment
  • 3.10 Issue Log


4.0 Monitoring and Controlling Process Group:

  • 4.1 Memory architecture project Performance Report
  • 4.2 Variance Analysis
  • 4.3 Earned Value Status
  • 4.4 Risk Audit
  • 4.5 Contractor Status Report
  • 4.6 Formal Acceptance


5.0 Closing Process Group:

  • 5.1 Procurement Audit
  • 5.2 Contract Close-Out
  • 5.3 Memory architecture project or Phase Close-Out
  • 5.4 Lessons Learned

 

Results

With this Three Step process you will have all the tools you need for any Memory architecture project with this in-depth Memory architecture Toolkit.

In using the Toolkit you will be better able to:

  • Diagnose Memory architecture projects, initiatives, organizations, businesses and processes using accepted diagnostic standards and practices
  • Implement evidence-based best practice strategies aligned with overall goals
  • Integrate recent advances in Memory architecture and put process design strategies into practice according to best practice guidelines

Defining, designing, creating, and implementing a process to solve a business challenge or meet a business objective is the most valuable role; In EVERY company, organization and department.

Unless you are talking a one-time, single-use project within a business, there should be a process. Whether that process is managed and implemented by humans, AI, or a combination of the two, it needs to be designed by someone with a complex enough perspective to ask the right questions. Someone capable of asking the right questions and step back and say, 'What are we really trying to accomplish here? And is there a different way to look at it?'

This Toolkit empowers people to do just that - whether their title is entrepreneur, manager, consultant, (Vice-)President, CxO etc... - they are the people who rule the future. They are the person who asks the right questions to make Memory architecture investments work better.

This Memory architecture All-Inclusive Toolkit enables You to be that person.

 

Includes lifetime updates

Every self assessment comes with Lifetime Updates and Lifetime Free Updated Books. Lifetime Updates is an industry-first feature which allows you to receive verified self assessment updates, ensuring you always have the most accurate information at your fingertips.

46 Reviews Hide Reviews Show Reviews

  • 5
    JUNE M. Vice President Information Technology, Human Resources and Administrative Services

    Posted by JUNE M. on 2nd Jul 2018

    I would love to have a conversation with you, at the moment I am preparing for our annual IT Conference, which I might add, we could have used you as a presenter!

  • 5
    Thank you, this is perfect - I will certainly be recommending Self Assessment dashboards to all - I can not wait to tell my colleagues on Monday.

    Posted by MEL F. on 2nd Jul 2018

    MEL F. Change Management Professional

  • 5
    CARSTEN B. Experienced safety and quality enabler

    Posted by CARSTEN B. on 5th Jun 2018

    So far I have only had time to browse it very superficially, but form that it looks very comprehensive and at the same time practical. As soon as I find time I will do a short item on it on my literature pages and point risk management professionals in your direction. Have a great day, and all the best!!

  • 5
    Man, thanks again for sharing. Really a life saver! Greetings!

    Posted by DAAN C on 4th Jun 2018

    DAAN C Senior Consultant

  • 5
    Thank you. We will be offering your self assessment as a subject for our master students from autumn onwards.

    Posted by Christine R. on 2nd Jun 2018

    Christine R. University Officer

  • 5
    Just looked at the files. Impressive. Well done. I am learning.

    Posted by MARTIN B. on 2nd Jun 2018

    MARTIN B. Risks and Compliance, Vulnerability and Security Testing, Threat Detection and Response, Managed Security Services.

  • 5
    Awesome, thank you so much!!

    Posted by ZORAN M. on 2nd Jun 2018

    ZORAN M. Knowledge Management Consultant

  • 5
    This is great! Thank you. Say, do you all do consulting or certification?

    Posted by KEN W. on 2nd Jun 2018

    KEN W. Managing Director

  • 5
    Thank you. I would very much like to read your publication and share my views on our blog to reach our English and Spanish customers.

    Posted by James S. on 2nd Jun 2018

    James S. Account Manager