Software Assets Toolkit

$495.00
Availability:
Downloadable Resources, Instant Access
Adding to cart… The item has been added

Initiate Software Assets: if it is determined you meet minimum.

More Uses of the Software Assets Toolkit:

  • Confirm your team ensures Cost Optimization, maximizing your IT investments, ensures inventory/CMDB accuracy, compliance, usage tracking of Hardware and Software Assets.

  • Perform daily and long term operational and Strategic Management of IT Hardware and Software Assets.

  • Confirm your organization ensures Cost Optimization, maximizing your IT investments, ensures inventory/CMDB accuracy, compliance, usage tracking of Hardware and Software Assets.

  • Confirm your organization ensures Cost Optimization, maximizing your IT investments, ensures inventory/CMDB accuracy, compliance, usage tracking of Hardware and Software Assets.

  • Establish Software Assets: design, development, implementation, unit and Integration Testing of software and systems applications in the client/server environment.

  • Arrange that your organization serves as an advanced data technology expert in design efforts, Proof of Concept (POC) exercises, analysis of solutions, Performance Tuning/testing and interfaces for new software deliverables or for making significant enhancements to existing ones.

  • Warrant that your organization leads a Project Team of other software systems engineers and internal and outsourced development partners to develop reliable, cost effective and high quality solutions for assigned systems portion or subsystem.

  • Be accountable for organizing software update process for Existing Applications and coordinates the roll out of software releases.

  • Provide skill in using diagnostic and performance tools and other software products to maintain established standards for Database Management systems.

  • Lead the design, development and deployment of software systems for big Data Analytics.

  • Arrange that your group contributes to the development, review, analysis and implementation of test strategies for Complex Software products and systems/for storage products and systems.

  • Ensure you brief; recommend, plan, coordinate, and implement regular software hygiene as patching and upgrades for stability, availability, and reliability of the service.

  • Make sure that your corporation creates and leads the Technical Design and development of software solutions.

  • Be certain that your organization complies; DevOps engineers are IT professionals who collaborate with Software Developers, systems engineers and other IT staff members to do server Configuration Management and manage code releases.

  • Be certain that your enterprise contributes to the development of high Quality Systems and products by ensuring adoption of standards, Best Practices, Processes And Procedures at every phase of the Software Development lifecycle; requirements to release.

  • Work with software and hardware integration engineers to perform sub system Functional Testing.

  • Methodize Software Assets: document results of tests for the Software Development team.

  • Confirm your project complies; this organization contains a diverse set of teams consisting of OS Software Engineering, backend Big Data Engineering, Service Reliability Engineering, Full Stack Web Engineering, Data Scientists, and Support Engineering.

  • Warrant that your design complies; designs and develops custom solutions to interface geospatial databases and applications to other software platforms.

  • Lead a cross functional team in the development and maintenance of various Infotainment software features from conception to system release.

  • Control Software Assets: beholden to no provider, you configure optimal solutions from the available array of Open Source and commercial software and saas options.

  • Make sure that your operation determines technology requirements and Business Processes, codes, tests, and coordinates the implementation of Complex Software solutions.

  • Ensure you boost; lead Agile team of software security researchers in the discovery, analysis, and capability integration for the Cyber intelligence operations community.

  • Manage Software Assets: great Leadership Skills to manage Customer Engagement, Thought Leadership in software automation or industrial domain and deliver high quality software solution and innovate offers.

  • Ensure you classify; build software to help Operations and Support teams.

  • Manage work with hardware and software vendors to verify timely product delivery and ensure that new equipment is installed and ready to operate on schedule.

  • Be a part of cross functional team of security engineers, penetration testers, and Software Developers.

  • Confirm your business provides oversight throughout the release schedule of business and enterprise software solutions to ensure successful deployment.

  • Deploy the release of new technologies and perform installations, upgrades, testing, and maintenance of environmental software in multiple server and multiple network Operating System environments.

  • Guide Software Assets: advocate for secure application and infrastructure Best Practices, ensuring a security presence at all stages of the Software Development lifecycle.

  • Make sure that your venture oversees the periodic testing of your systems and technology assets through consistent Vulnerability Scanning, providing an assessment of risk ranking of any findings for criticality of mitigation.

  • Be accountable for leveraging leading practices to continuously mature and improve your capabilities for strategic, operational and emerging risks across your full portfolio of risks.

 

Save time, empower your teams and effectively upgrade your processes with access to this practical Software Assets Toolkit and guide. Address common challenges with best-practice templates, step-by-step Work Plans and maturity diagnostics for any Software Assets related project.

Download the Toolkit and in Three Steps you will be guided from idea to implementation results.

The Toolkit contains the following practical and powerful enablers with new and updated Software Assets specific requirements:


STEP 1: Get your bearings

Start with...

  • The latest quick edition of the Software Assets Self Assessment book in PDF containing 49 requirements to perform a quickscan, get an overview and share with stakeholders.

Organized in a Data Driven improvement cycle RDMAICS (Recognize, Define, Measure, Analyze, Improve, Control and Sustain), check the…

  • Example pre-filled Self-Assessment Excel Dashboard to get familiar with results generation

Then find your goals...


STEP 2: Set concrete goals, tasks, dates and numbers you can track

Featuring 999 new and updated case-based questions, organized into seven core areas of Process Design, this Self-Assessment will help you identify areas in which Software Assets improvements can be made.

Examples; 10 of the 999 standard requirements:

  1. What will be the consequences to the stakeholder (financial, reputation etc) if Software Assets does not go ahead or fails to deliver the objectives?

  2. What training and capacity building actions are needed to implement proposed reforms?

  3. What are the necessary qualifications?

  4. What does your Operating model cost?

  5. How do you control the overall costs of your work processes?

  6. How long will it take to change?

  7. Are you assessing Software Assets and risk?

  8. How do you verify the Software Assets requirements quality?

  9. What controls do you have in place to protect data?

  10. How do you assess the Software Assets pitfalls that are inherent in implementing it?


Complete the self assessment, on your own or with a team in a workshop setting. Use the workbook together with the self assessment requirements spreadsheet:

  • The workbook is the latest in-depth complete edition of the Software Assets book in PDF containing 994 requirements, which criteria correspond to the criteria in...

Your Software Assets self-assessment dashboard which gives you your dynamically prioritized projects-ready tool and shows your organization exactly what to do next:

  • The Self-Assessment Excel Dashboard; with the Software Assets Self-Assessment and Scorecard you will develop a clear picture of which Software Assets areas need attention, which requirements you should focus on and who will be responsible for them:

    • Shows your organization instant insight in areas for improvement: Auto generates reports, radar chart for maturity assessment, insights per process and participant and bespoke, ready to use, RACI Matrix
    • Gives you a professional Dashboard to guide and perform a thorough Software Assets Self-Assessment
    • Is secure: Ensures offline Data Protection of your Self-Assessment results
    • Dynamically prioritized projects-ready RACI Matrix shows your organization exactly what to do next:

 

STEP 3: Implement, Track, follow up and revise strategy

The outcomes of STEP 2, the self assessment, are the inputs for STEP 3; Start and manage Software Assets projects with the 62 implementation resources:

  • 62 step-by-step Software Assets Project Management Form Templates covering over 1500 Software Assets project requirements and success criteria:

Examples; 10 of the check box criteria:

  1. Cost Management Plan: Eac -estimate at completion, what is the total job expected to cost?

  2. Activity Cost Estimates: In which phase of the Acquisition Process cycle does source qualifications reside?

  3. Project Scope Statement: Will all Software Assets project issues be unconditionally tracked through the Issue Resolution process?

  4. Closing Process Group: Did the Software Assets Project Team have enough people to execute the Software Assets project plan?

  5. Source Selection Criteria: What are the guidelines regarding award without considerations?

  6. Scope Management Plan: Are Corrective Actions taken when actual results are substantially different from detailed Software Assets project plan (variances)?

  7. Initiating Process Group: During which stage of Risk planning are risks prioritized based on probability and impact?

  8. Cost Management Plan: Is your organization certified as a supplier, wholesaler, regular dealer, or manufacturer of corresponding products/supplies?

  9. Procurement Audit: Was a formal review of tenders received undertaken?

  10. Activity Cost Estimates: What procedures are put in place regarding bidding and cost comparisons, if any?

 
Step-by-step and complete Software Assets Project Management Forms and Templates including check box criteria and templates.

1.0 Initiating Process Group:


2.0 Planning Process Group:

  • 2.1 Software Assets Project Management Plan
  • 2.2 Scope Management Plan
  • 2.3 Requirements Management Plan
  • 2.4 Requirements Documentation
  • 2.5 Requirements Traceability Matrix
  • 2.6 Software Assets project Scope Statement
  • 2.7 Assumption and Constraint Log
  • 2.8 Work Breakdown Structure
  • 2.9 WBS Dictionary
  • 2.10 Schedule Management Plan
  • 2.11 Activity List
  • 2.12 Activity Attributes
  • 2.13 Milestone List
  • 2.14 Network Diagram
  • 2.15 Activity Resource Requirements
  • 2.16 Resource Breakdown Structure
  • 2.17 Activity Duration Estimates
  • 2.18 Duration Estimating Worksheet
  • 2.19 Software Assets project Schedule
  • 2.20 Cost Management Plan
  • 2.21 Activity Cost Estimates
  • 2.22 Cost Estimating Worksheet
  • 2.23 Cost Baseline
  • 2.24 Quality Management Plan
  • 2.25 Quality Metrics
  • 2.26 Process Improvement Plan
  • 2.27 Responsibility Assignment Matrix
  • 2.28 Roles and Responsibilities
  • 2.29 Human Resource Management Plan
  • 2.30 Communications Management Plan
  • 2.31 Risk Management Plan
  • 2.32 Risk Register
  • 2.33 Probability and Impact Assessment
  • 2.34 Probability and Impact Matrix
  • 2.35 Risk Data Sheet
  • 2.36 Procurement Management Plan
  • 2.37 Source Selection Criteria
  • 2.38 Stakeholder Management Plan
  • 2.39 Change Management Plan


3.0 Executing Process Group:

  • 3.1 Team Member Status Report
  • 3.2 Change Request
  • 3.3 Change Log
  • 3.4 Decision Log
  • 3.5 Quality Audit
  • 3.6 Team Directory
  • 3.7 Team Operating Agreement
  • 3.8 Team Performance Assessment
  • 3.9 Team Member Performance Assessment
  • 3.10 Issue Log


4.0 Monitoring and Controlling Process Group:

  • 4.1 Software Assets project Performance Report
  • 4.2 Variance Analysis
  • 4.3 Earned Value Status
  • 4.4 Risk Audit
  • 4.5 Contractor Status Report
  • 4.6 Formal Acceptance


5.0 Closing Process Group:

  • 5.1 Procurement Audit
  • 5.2 Contract Close-Out
  • 5.3 Software Assets project or Phase Close-Out
  • 5.4 Lessons Learned

 

Results

With this Three Step process you will have all the tools you need for any Software Assets project with this in-depth Software Assets Toolkit.

In using the Toolkit you will be better able to:

  • Diagnose Software Assets projects, initiatives, organizations, businesses and processes using accepted diagnostic standards and practices
  • Implement evidence-based Best Practice strategies aligned with overall goals
  • Integrate recent advances in Software Assets and put Process Design strategies into practice according to Best Practice guidelines

Defining, designing, creating, and implementing a process to solve a business challenge or meet a business objective is the most valuable role; In EVERY company, organization and department.

Unless you are talking a one-time, single-use project within a business, there should be a process. Whether that process is managed and implemented by humans, AI, or a combination of the two, it needs to be designed by someone with a complex enough perspective to ask the right questions. Someone capable of asking the right questions and step back and say, 'What are we really trying to accomplish here? And is there a different way to look at it?'

This Toolkit empowers people to do just that - whether their title is entrepreneur, manager, consultant, (Vice-)President, CxO etc... - they are the people who rule the future. They are the person who asks the right questions to make Software Assets investments work better.

This Software Assets All-Inclusive Toolkit enables You to be that person.

 

Includes lifetime updates

Every self assessment comes with Lifetime Updates and Lifetime Free Updated Books. Lifetime Updates is an industry-first feature which allows you to receive verified self assessment updates, ensuring you always have the most accurate information at your fingertips.