Windows 7 Toolkit: best-practice templates, step-by-step work plans and maturity diagnostics

$249.00
(46 reviews) Write a Review
Availability:
Downloadable Resources, Instant Access

Save time, empower your teams and effectively upgrade your processes with access to this practical Windows 7 Toolkit and guide. Address common challenges with best-practice templates, step-by-step work plans and maturity diagnostics for any Windows 7 related project.

Download the Toolkit and in Three Steps you will be guided from idea to implementation results.

The Toolkit contains the following practical and powerful enablers with new and updated Windows 7 specific requirements:


STEP 1: Get your bearings

Start with...

  • The latest quick edition of the Windows 7 Self Assessment book in PDF containing 49 requirements to perform a quickscan, get an overview and share with stakeholders.

Organized in a data driven improvement cycle RDMAICS (Recognize, Define, Measure, Analyze, Improve, Control and Sustain), check the…

  • Example pre-filled Self-Assessment Excel Dashboard to get familiar with results generation

Then find your goals...


STEP 2: Set concrete goals, tasks, dates and numbers you can track

Featuring 619 new and updated case-based questions, organized into seven core areas of process design, this Self-Assessment will help you identify areas in which Windows 7 improvements can be made.

Examples; 10 of the 619 standard requirements:

  1. Are gaps between current performance and the goal performance identified?

  2. Record-keeping requirements flow from the records needed as inputs, outputs, controls and for transformation of a Windows 7 process. ask yourself: are the records needed as inputs to the Windows 7 process available?

  3. What kind of crime could a potential new hire have committed that would not only not disqualify him/her from being hired by our organization, but would actually indicate that he/she might be a particularly good fit?

  4. Are you satisfied with your current role? If not, what is missing from it?

  5. What measurements are possible, practicable and meaningful?

  6. What should we stop doing?

  7. What are the known security controls?

  8. What are the long-term Windows 7 goals?

  9. Can we do Windows 7 without complex (expensive) analysis?

  10. Whose voice (department, ethnic group, women, older workers, etc) might you have missed hearing from in your company, and how might you amplify this voice to create positive momentum for your business?


Complete the self assessment, on your own or with a team in a workshop setting. Use the workbook together with the self assessment requirements spreadsheet:

  • The workbook is the latest in-depth complete edition of the Windows 7 book in PDF containing 619 requirements, which criteria correspond to the criteria in...

Your Windows 7 self-assessment dashboard which gives you your dynamically prioritized projects-ready tool and shows your organization exactly what to do next:

  • The Self-Assessment Excel Dashboard; with the Windows 7 Self-Assessment and Scorecard you will develop a clear picture of which Windows 7 areas need attention, which requirements you should focus on and who will be responsible for them:

    • Shows your organization instant insight in areas for improvement: Auto generates reports, radar chart for maturity assessment, insights per process and participant and bespoke, ready to use, RACI Matrix
    • Gives you a professional Dashboard to guide and perform a thorough Windows 7 Self-Assessment
    • Is secure: Ensures offline data protection of your Self-Assessment results
    • Dynamically prioritized projects-ready RACI Matrix shows your organization exactly what to do next:

 

STEP 3: Implement, Track, follow up and revise strategy

The outcomes of STEP 2, the self assessment, are the inputs for STEP 3; Start and manage Windows 7 projects with the 62 implementation resources:

  • 62 step-by-step Windows 7 Project Management Form Templates covering over 6000 Windows 7 project requirements and success criteria:

Examples; 10 of the check box criteria:

  1. Quality Audit: How does the organization know that its general support services planning and management systems are appropriately effective and constructive?

  2. Schedule Management Plan: Have adequate resources been provided by management to ensure Windows 7 project success?

  3. Duration Estimating Worksheet: Is a Construction detail attached (to aid in explanation)?

  4. Project Performance Report: To what degree can the cognitive capacity of individuals accommodate the flow of information?

  5. Scope Management Plan: Can the Windows 7 project team do several activities in parallel?

  6. Quality Management Plan: Can you perform this task or activity in a more effective manner?

  7. Procurement Audit: Has the organization procedures in place to monitor the input of experts employed to assist the procurement function?

  8. Quality Audit: How does the organization know that its financial management system is appropriately effective and constructive?

  9. Roles and Responsibilities: Concern: where are you limited or have no authority, where you cant influence?

  10. Human Resource Management Plan: Identify who is needed on the core Windows 7 project team to complete Windows 7 project deliverables and achieve its goals and objectives. What skills, knowledge and experiences are required?

 
Step-by-step and complete Windows 7 Project Management Forms and Templates including check box criteria and templates.

1.0 Initiating Process Group:

  • 1.1 Windows 7 project Charter
  • 1.2 Stakeholder Register
  • 1.3 Stakeholder Analysis Matrix


2.0 Planning Process Group:

  • 2.1 Windows 7 project Management Plan
  • 2.2 Scope Management Plan
  • 2.3 Requirements Management Plan
  • 2.4 Requirements Documentation
  • 2.5 Requirements Traceability Matrix
  • 2.6 Windows 7 project Scope Statement
  • 2.7 Assumption and Constraint Log
  • 2.8 Work Breakdown Structure
  • 2.9 WBS Dictionary
  • 2.10 Schedule Management Plan
  • 2.11 Activity List
  • 2.12 Activity Attributes
  • 2.13 Milestone List
  • 2.14 Network Diagram
  • 2.15 Activity Resource Requirements
  • 2.16 Resource Breakdown Structure
  • 2.17 Activity Duration Estimates
  • 2.18 Duration Estimating Worksheet
  • 2.19 Windows 7 project Schedule
  • 2.20 Cost Management Plan
  • 2.21 Activity Cost Estimates
  • 2.22 Cost Estimating Worksheet
  • 2.23 Cost Baseline
  • 2.24 Quality Management Plan
  • 2.25 Quality Metrics
  • 2.26 Process Improvement Plan
  • 2.27 Responsibility Assignment Matrix
  • 2.28 Roles and Responsibilities
  • 2.29 Human Resource Management Plan
  • 2.30 Communications Management Plan
  • 2.31 Risk Management Plan
  • 2.32 Risk Register
  • 2.33 Probability and Impact Assessment
  • 2.34 Probability and Impact Matrix
  • 2.35 Risk Data Sheet
  • 2.36 Procurement Management Plan
  • 2.37 Source Selection Criteria
  • 2.38 Stakeholder Management Plan
  • 2.39 Change Management Plan


3.0 Executing Process Group:

  • 3.1 Team Member Status Report
  • 3.2 Change Request
  • 3.3 Change Log
  • 3.4 Decision Log
  • 3.5 Quality Audit
  • 3.6 Team Directory
  • 3.7 Team Operating Agreement
  • 3.8 Team Performance Assessment
  • 3.9 Team Member Performance Assessment
  • 3.10 Issue Log


4.0 Monitoring and Controlling Process Group:

  • 4.1 Windows 7 project Performance Report
  • 4.2 Variance Analysis
  • 4.3 Earned Value Status
  • 4.4 Risk Audit
  • 4.5 Contractor Status Report
  • 4.6 Formal Acceptance


5.0 Closing Process Group:

  • 5.1 Procurement Audit
  • 5.2 Contract Close-Out
  • 5.3 Windows 7 project or Phase Close-Out
  • 5.4 Lessons Learned

 

Results

With this Three Step process you will have all the tools you need for any Windows 7 project with this in-depth Windows 7 Toolkit.

In using the Toolkit you will be better able to:

  • Diagnose Windows 7 projects, initiatives, organizations, businesses and processes using accepted diagnostic standards and practices
  • Implement evidence-based best practice strategies aligned with overall goals
  • Integrate recent advances in Windows 7 and put process design strategies into practice according to best practice guidelines

Defining, designing, creating, and implementing a process to solve a business challenge or meet a business objective is the most valuable role; In EVERY company, organization and department.

Unless you are talking a one-time, single-use project within a business, there should be a process. Whether that process is managed and implemented by humans, AI, or a combination of the two, it needs to be designed by someone with a complex enough perspective to ask the right questions. Someone capable of asking the right questions and step back and say, 'What are we really trying to accomplish here? And is there a different way to look at it?'

This Toolkit empowers people to do just that - whether their title is entrepreneur, manager, consultant, (Vice-)President, CxO etc... - they are the people who rule the future. They are the person who asks the right questions to make Windows 7 investments work better.

This Windows 7 All-Inclusive Toolkit enables You to be that person.

 

Includes lifetime updates

Every self assessment comes with Lifetime Updates and Lifetime Free Updated Books. Lifetime Updates is an industry-first feature which allows you to receive verified self assessment updates, ensuring you always have the most accurate information at your fingertips.

46 Reviews Hide Reviews Show Reviews

  • 5
    I will use everything extensively to prepare for an audit scheduled in Dec and Jan for an important automotive customer.

    Posted by Bruno C. on 3rd Sep 2018

    Bruno C. ICT Director

  • 5
    I have read your book and it's a great work for my business. Thank you.

    Posted by Nguyen Hoang Vu on 3rd Sep 2018

    Nguyen Hoang Vu

  • 5
    Thank you! I have found a lot of great information in the text so far. I plan to use your book as one of our references as we build out our SDDC and gladly leave an online review.

    Posted by CRAIG T. on 3rd Sep 2018

    CRAIG T. Chief Technology Officer

  • 5
    The subject is new to me and am sure the resources along with suggested methodology would help me in my pursuit.

    Posted by Ravi P. on 2nd Sep 2018

    Ravi P. Senior Consultant Big 5

  • 5
    DAVID S. Director Organisational performance

    Posted by DAVID S. on 2nd Sep 2018

    Honestly - at the extremely low outlay - the capacity to accelerate your journey, increase productivity and be a more informed buyer (when combined with what actual business problems you are trying to solve) I would be extremely hard pressed to not undertake it.

  • 5
    Thank you for this achievement.

    Posted by IFMA on 4th Aug 2018

    IFMA International Facility Management Association

  • 5
    Super helpful.. Love how the full assessment helps me take full control of this project!

    Posted by Brett O. on 3rd Aug 2018

    BRETT O. Strategist

  • 5
    Great initiative and timing to release the requirements! And thanks a lot for sharing it with us!

    Posted by Pierre V. on 5th Jul 2018

    Pierre V. B2B Product & Content Marketing

  • 5
    CARSTEN B. Experienced safety and quality enabler

    Posted by CARSTEN B. on 5th Jul 2018

    So far I have only had time to browse it very superficially, but form that it looks very comprehensive and at the same time practical. As soon as I find time I will do a short item on it on my literature pages and point risk management professionals in your direction. Have a great day, and all the best!!